| | DENIED |
| | |
| | 1) FIXED WINDOWS APPEAR TO BE SEPERATE LITES IF SO |
| | MULLIONS ARE REQUIRED AND PRODUCT APPROVALS SHALL BE |
| | SUBMITTED |
| | |
| | 2) THE STATE COVER FL#5259 FOR THE POLYSTICK |
| | UNDERLAYMENT IS NOT THE CORRECT COVER FOR THE |
| | MIAMI-DADE NOA PLEASE SUBMIT CORRECT COVER (FL#986-R1) |
| | |
| | 3) THE STATE COVER FL#2795 FOR THE FIXED WINDOWS ARE |
| | FOR THE 2001 CODE CYCLE, YALE OGRON DOES NOT YET HAVE |
| | STATE APPROVAL FOR THIS PRODUCT SO A LOCAL PRODUT |
| | APPROVAL WAS GIVEN FOR THE MIAMI-DADE NOA. THE SAME |
| | APPLIES TO THE SMITH MOUNTAIN ENTRANCE DOOR & TRANSOM |
| | NOA'S |
| | |
| | 4) PROVIDE THE UL LISTING/SYSTEM USED TO MEET THE ONE |
| | HOUR RATING FOR THE CEILING AND ATTIC ACCESS PANELS. |
| | DRAWINGS ONLY SHOW ONE LAYER 5/8" TYPE X WHICH IS A 40 |
| | MINUTE RATING |
| | |
| | 5) PROVIDE ENERGY CALC'S PER 13-101.1.6 FBC USING |
| | METHOD B AS PER CONVERSATION WITH PATTY KRAUSS (MECH |
| | PLAN REVEIW) AND SHOW COMPLIANCE ON THE CONSTRUCTION |
| | DOCUMENTS |
| | |
| | 6) PER ELEVATOR SHOP DRAWINGS PROVIDE MINIMUM ONE HR |
| | RATED DOOR TO THE MACHINE ROOM COMPLETE WITH CLOSER AND |
| | LOCK |
| | |
| | 7) PROVIDE HARDWARE SCHEDULE WITH HARDWARE THAT MEETS |
| | THE ACCESSABILITY REQUIREMENTS PER 11-4.13.8 THROUGH |
| | 11-4.13.11 |
| | |
| | 8) PROVIDE SHORING PLANS FOR BEAMS (OTHER THAN TAHT |
| | ALREADY SUPPLIED FOR EPICORE) |
| | |
| | 9) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME, |
| | ADDRESS, AND LICENCE NUMBER ON EACH SHEET THAT BEARS |
| | THEIR SEAL PER |
| | 61G15-23.002(2) FAC GUARD RAIL DETAIL IS MISSING |
| | ENGINEERS NAME AND PE LICENCE NUMBER |
| | |
| | 10) FIRE SPRINKLERAND EPICORE FRAMING LAYOUT PLANS DO |
| | NOT CARRY AN ORIGINAL "SIGNATURE" AS REQUIRED BY |
| | 61G15-23.002(2) FAC AND THE FLORIDA BOARD OF |
| | PROFESSIONAL ENGINEERS |
| | |
| | 11) THE ENGINEER SEAL ON THE TRUSS LAYOUT PLANS AND |
| | INDEX SHEETS DOES NOT MEET THE REQUIREMENTS OF |
| | 61G15-23.001 FAC, 471.025 FS AND THE FBPE THAT THE |
| | WORDING ON THE SEAL SHALL CHANGE FROM CERTIFICATE TO |
| | LICENCE |
| | |
| | 12) THE CLAIMED VALUATION ON THE PERMIT APPLICATION IS |
| | LOW. FOR PERMITTING PURPOSES, VALUATION OF BUILDINGS |
| | AND SYSTEMS SHALL BE THE TOTAL REPLACEMENT COST |
| | EXCLUDING LAND VALUE. OUR VALUATION REFERENCE IS ICC |
| | (BVD), MARSHALL-SWIFT AND MEANS COST ANALYSIS SERVICES |
| | PER 108.3 FBC* PLEASE SEE THAT THE VALUE HAS BEEN |
| | INCREASED AND FEES ARE DUE |
| | |
| | 13) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT IS REQUIRED PRIOR TO |
| | A PERMIT BEING ISSUED |
| | |
| | 14) NOTE: AN ELEVATION CERTIFICATE WILL BE REQUIRED |
| | PRIOR TO THE ISSUANCE OF A CO |
| | |