| Date |
Text |
| 2006-07-06 00:00:00 | DENIED |
| | |
| | ALL NEW COMMENTS: |
| | |
| | ** PROJECT DESCRIPTION ON APPLICATION |
| | DOES NOT DESCRIBE PROJECT IN DETAIL. |
| | THIS PROJECT IS A "CHANGE OF OCCUPANCY" |
| | TO AN EXISTING BUILDING. SEE THE |
| | FOLLOWING COMMENTS FOR REQUIRED |
| | INFORMATION NEEDED WITH A CHANGE OF |
| | OCCUPANCY. |
| | |
| | 1. FBC 106.3.5 MINIMUM PLAN REVIEW |
| | CRITERIA FOR BUILDINGS. |
| | THE EXAMINATION OF THE DOCUMENTS BY THE |
| | BUILDING OFFICIAL SHALL INCLUDE THE |
| | FOLLOWING MINIMUM CRITERIA AND |
| | DOCUMENTS: A FLOOR PLAN; SITE PLAN; |
| | FOUNDATION PLAN; FLOOR/ROOF FRAMING PLAN |
| | OR TRUSS LAYOUT; AND ALL EXTERIOR |
| | ELEVATIONS. |
| | |
| | COMMERCIAL BUILDINGS: |
| | |
| | BUILDING |
| | 1.SITE REQUIREMENTS: |
| | |
| | PARKING |
| | FIRE ACCESS |
| | VEHICLE LOADING |
| | DRIVING/TURNING RADIUS |
| | FIRE HYDRANT/WATER SUPPLY/POST INDICATOR |
| | VALVE (PIV) |
| | SET BACK/SEPARATION (ASSUMED PROPERTY |
| | LINES) |
| | LOCATION OF SPECIFIC TANKS, WATER LINES |
| | AND SEWER LINES |
| | 2.OCCUPANCY GROUP AND SPECIAL |
| | OCCUPANCY REQUIREMENTS SHALL BE |
| | DETERMINED. |
| | 3.MINIMUM TYPE OF CONSTRUCTION |
| | SHALL BE DETERMINED (SEE TABLE 503 ). |
| | 4.FIRE-RESISTANT CONSTRUCTION |
| | REQUIREMENTS SHALL INCLUDE THE FOLLOWING |
| | COMPONENTS: |
| | |
| | FIRE-RESISTANT SEPARATIONS |
| | FIRE-RESISTANT PROTECTION FOR TYPE OF |
| | CONSTRUCTION |
| | PROTECTION OF OPENINGS AND PENETRATIONS |
| | OF RATED WALLS |
| | FIRE BLOCKING AND DRAFTSTOPPING AND |
| | CALCULATED FIRE RESISTANCE |
| | 5.FIRE SUPPRESSION SYSTEMS SHALL |
| | INCLUDE: |
| | |
| | EARLY WARNING SMOKE EVACUATION SYSTEMS |
| | SCHEMATIC FIRE SPRINKLERS |
| | STANDPIPES |
| | PREENGINEERED SYSTEMS |
| | RISER DIAGRAM |
| | SAME AS ABOVE. |
| | 6.LIFE SAFETY SYSTEMS SHALL BE |
| | DETERMINED AND SHALL INCLUDE THE |
| | FOLLOWING REQUIREMENTS: |
| | |
| | OCCUPANT LOAD AND EGRESS CAPACITIES |
| | EARLY WARNING |
| | SMOKE CONTROL |
| | STAIR PRESSURIZATION |
| | SYSTEMS SCHEMATIC |
| | 7.OCCUPANCY LOAD/EGRESS |
| | REQUIREMENTS SHALL INCLUDE: |
| | |
| | OCCUPANCY LOAD |
| | GROSS |
| | NET |
| | MEANS OF EGRESS |
| | EXIT ACCESS |
| | EXIT |
| | EXIT DISCHARGE |
| | STAIRS CONSTRUCTION/GEOMETRY AND |
| | PROTECTION |
| | DOORS |
| | EMERGENCY LIGHTING AND EXIT SIGNS |
| | SPECIFIC OCCUPANCY REQUIREMENTS |
| | CONSTRUCTION REQUIREMENTS |
| | HORIZONTAL EXITS/EXIT PASSAGEWAYS |
| | 8.STRUCTURAL REQUIREMENTS SHALL |
| | INCLUDE: |
| | |
| | SOIL CONDITIONS/ANALYSIS |
| | TERMITE PROTECTION |
| | DESIGN LOADS |
| | WIND REQUIREMENTS |
| | BUILDING ENVELOPE |
| | STRUCTURAL CALCULATIONS (IF REQUIRED) |
| | FOUNDATION |
| | WALL SYSTEMS |
| | FLOOR SYSTEMS |
| | ROOF SYSTEMS |
| | THRESHOLD INSPECTION PLAN |
| | STAIR SYSTEMS |
| | 9.MATERIALS SHALL BE REVIEWED AND |
| | SHALL AT A MINIMUM INCLUDE THE |
| | FOLLOWING: |
| | |
| | WOOD |
| | STEEL |
| | ALUMINUM |
| | CONCRETE |
| | PLASTIC |
| | GLASS |
| | MASONRY |
| | GYPSUM BOARD AND PLASTER |
| | INSULATING (MECHANICAL) |
| | ROOFING |
| | INSULATION |
| | 10.ACCESSIBILITY REQUIREMENTS SHALL |
| | INCLUDE THE FOLLOWING: |
| | |
| | SITE REQUIREMENTS |
| | ACCESSIBLE ROUTE |
| | VERTICAL ACCESSIBILITY |
| | TOILET AND BATHING FACILITIES |
| | DRINKING FOUNTAINS |
| | EQUIPMENT |
| | SPECIAL OCCUPANCY REQUIREMENTS |
| | FAIR HOUSING REQUIREMENTS |
| | 11.INTERIOR REQUIREMENTS SHALL |
| | INCLUDE THE FOLLOWING: |
| | |
| | INTERIOR FINISHES (FLAME SPREAD/SMOKE |
| | DEVELOPMENT) |
| | LIGHT AND VENTILATION |
| | SANITATION |
| | |
| | 3.PRODUCT APPROVALS REQUIRED FOR FLAT |
| | ROOF.ONLY UNDERLAYMENT SUBMITTED. |
| | SUBMIT AND ATTACH STATE PRODUCT |
| | APPROVAL. |
| | |
| | 4.A DESIGN PROFESSIONAL OR AN OWNER |
| | MUST ELECT ONE OR A COMBINATION OF |
| | LEVELS OF ALTERATION PURSUANT TO |
| | SECTIONS 303, 304 AND 305 OF THIS CODE. |
| | SHOW HOW PLANS WILL COMPLY WITH THE |
| | SECTION(S) SELECTED.2004 FBC EXISTING |
| | BUILDING 301.5 |
| | |
| | 6.THOSE PRODUCT APPROVALS WHICH ARE |
| | REGULATED BY DCA RULE 9B-72 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL.WPB |
| | AMENDMENT TO FBC 106.3.3. |
| | |
| | 7.SHOW COMPLIANCE WITH 2004 EXISTING |
| | BUILDING CODE CHAPTER 8 CHANGE OF |
| | OCCUPANCY. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. SUBMIT ONE COPY OF |
| | OLD PAGES FOR REFERENCE . A TRANSMITTAL |
| | LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF |
| | THE REVISION MADE, IDENTIFYING THE SHEET |
| | OR SPECIFICATION PAGE WHERE THE CHANGES |
| | CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | ART LANGE |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | BUILDING PLANS EXAMINER |
| | 561-805-6672 |
| | |