| Plan Review Notes For Permit 05110263 |
| Permit Number |
05110263 |
|
| Review Stop |
P |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2006-07-07 00:00:00 | | | | | | | PASSED/PROVISO | | | | | | REVISIONS REQUIRED FOR SHEETS P1, P-5, & | | | P-10 FLOOR PLANS SHOWING THE HAND SINKS | | | REQUIRED BY DBPR PLAN REVIEW. REVISION | | | IS ALSO REQUIRED FORSHEET P-8 WATER | | | RISER DIAGRAM AND SHT P-15 FPR THE | | | GREASE ISOMETRIC RISER DIAGRAM | | | REFLECTING THESE CHANGES. | | | | | | REVISION IS ALSO REQUIRED FOR THE GAS | | | ISOMETRIC RISER DIAGRAM, WHICH SHALL | | | CORRELATE WITH THE GAS | | | EQUIPMENT/CONNECTED LOAD AND THE MANUF. SPECIFICATION | | | SHEETS INDICATING THE BTU | | | LOAD FOR EACH GAS APPLIANCE. | | | | | | GAS ISOMETRIC NOT APPROVED AT THIS TIME. | | | PLUMBING ONLY APPROVED. SEPARATE GAS | | | PERMIT REQUIRED. | | | | | | | | | | | | | | | . |
|