Plan Review Notes
Plan Review Notes For Permit 05110263
Permit Number 05110263
Review Stop ENG
Sequence Number 1
Notes
Date Text
2006-01-20 00:00:00FAILED:
  
 1. PLEASE SUBMIT A COPY OF MODIFIED
 SFWMD PERMIT.
 2. PLEASE PROVIDE CALCULATION FOR STORM
 WATER POST DEVELOPMENT.
 3. PLEASE STATE AS WHERE RAIN LEADERS
 BEING CONNECTED.
 4. A CLEAN OUT IN ALL SEWER LATERAL IS
 REQUIRED.
 PLEASE SHOW THE LOCATIONS FOR BACKFLOWS
 FOR DOMMESTIC AND FIRE LINE.
 5. AN OIL WATER SEPARATOR IN SEWER LINE
 FOR THIS FACILITY IS REQUIRED.
 6. IS THERE A SEPARATE METER FOR THIS
 FACILITY?
 7. DUMPSTER ENCLOSURE SHOULD BE SIZED
 PER CITY OF WEST PALM BEACH REQUIREMENTS
 IF TO BE PICKED UP BY THE CITY, 12'-6"
 BETWEEN THE GATE POSTS, 12'-6" DEEP.
 8. ANY INLET IN THE PROPOSED ASPHALT
 DRIVEWAY? PLEASE VERIFY.
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved