2006-10-04 00:00:00-----------------DENIED-----------------
 NOTE:THESE COMMENTS ARE NUMBERED FOR
 CONTINUITY WITH PREVIOUS PLAN REVIEW
 COMMENTS AND RESPONSES.
  
 FBC 2001
 FBC,M 2001
  
 1. OK
  
 2. PG.A8-10 RESIDENTIAL DOOR SCHEDULE:
 MECHANICAL CLOSET DOORS INDICATES WOOD
 DOORS WITH INTUMESCENT PAINT. ABSENT A
 LISTING FROM AN APPROVED TESTING AGENCY
 SHOWING THIS ASSEMBLY TO BE
 NON-COMBUSTIBLE, IT MUST BE SUBMITTED
 UNDER FBC 103.7.1 ALTERNATE MATERIALS
 AND METHODS.
  
 3. PG.M2-00 EF1 & EF2, PLEASE INDICATE
 WHETHER THESE FANS ARE TO RUN CONTINUOUS
 OR BE THERMOSTATICALLY CONTROLLED. WILL
 THEY WORK IN ANY WAY IN CONJUNCTION WITH
 GEF1 OR CO SENSORS?
  
 4. OK
  
 5. OK
  
 6. PG.M2-01 NO LONGER SHOWS A CONDENSER
 LOCATED INDOORS. HOWEVER, STORAGE ROOMS
 X47 AND X48 DO NOT SHOW WHAT EQUIPMENT
 IS TO BE USED. IF THEY ARE SPLIT SYSTEMS
 THERE IS NO LOCATION OF CONDENSERS SHOWN
 ON PLAN.
  
 7. PG.M3-00 UNIT 'D1' SHOWS A 30X12
 RAFG. IS THIS A TRANSFER GRILL THROUGH A
 WALL OR IS IT GOING INTO A PLENUM
 CEILING?PER 601.4 A TRANSFER GRILL
 WOULD REQUIRE A MINIMUM OF 450 SQ.IN.
 SINCE IT IS RETUNING 900 CFM. IF THERE
 IS A CEILING PLENUM, THERE CAN BE NO
 EXHAUST DUCTS UNDER POSITIVE PRESSURE IN
 THE PLENUM PER 601.3.
  
 8. OK
  
 9. PLEASE PROVIDE DETAIL/SPECS FOR TYPE
 OF DRYER VENT HOOD (WALL CAP) TO BE
 USED. TYPE OF WALL CAP MAY IMPACT
 ALLOWABLE DRYER DUCT LENGTH PER DRYER
 MANUFACTURER'S INSTALLATION INSTRUCTIONS.
  
 10. SUBMITTAL DATA FOR GOODMAN
 RESIDENTIAL A/C EQUIPMENT ONLY SHOWS
 COPPER LINE SIZES UP TO A LENGTH OF 35'.
 PROVIDE DOCUMENTATION SIGNED AND SEALED
 BY A GOODMAN ENGINEER (NOT A SALESMAN)
 AFFIRMING SUITABILITY OF SPECIFIED
 EQUIPMENT FOR COPPER LINE LENGTH AND
 VERTICAL DISTANCE BETWEEN AIR HANDLERS
 AND CONDENSING UNITS. PROPER COPPER LINE
 SIZES FOR THIS APPLICATION ARE ALSO
 REQUIRED.
  
 11. OK
  
 12. PG.M4-00 FBC 412.5 SMOKE CONTROL
 REQUIRES REMOVAL OF THE PRODUCTS OF
 COMBUSTION (SMOKE) VIA NATURAL OR
 MECHANICAL VENTILLATION. PLEASE CLARIFY
 HOW SMOKE IS TO BE REMOVED FROM EFFECTED
 AREAS. THE SYSTEM DESCRIBED ON THIS PAGE
 DOES NOT APPEAR TO BE RELATED IN ANY WAY
 TO MEETING THE REQUIREMENTS OF FBC
 412.5.
  
 13. OK
  
 14. OK
  
 15. PG.M5-01 DETAIL #11 STILL SHOWS DUCT
 SMOKE DETECTOR IN R/A PLENUM. DUCT SMOKE
 DETECTORS ARE TO BE INSTALLED IN SUPPLY DUCTS
 PER FBC,M 606.2.1.
  
 PLEASE NOTE: THIS REFERS TO DETAIL #11, NOT DETAIL #4.
  
 16. OK
  
 17. OK
  
 18. OK
  
 19. PG.M2-00 AHU 1 SHOWS 16X14 SUPPLY AND
 10" ROUND O/A DUCTS PENETRATING RATED WALLS. IT
 IS NOT CLEAR ON PLANS IF AHU 1 O/A INTAKE
 COMPLIES WITH FBC,M 401.5.1 INTAKE OPENINGS.
 ITS PROXIMITY TO A PARKING SPACE INDICATES IT IS
 IN THE PARKING GARAGE, WHICH IS A PROHIBITED LOCATION.
  
 20. PG.M2-00 AHU 1 DOES NOT SHOW ANY
 RETURN AIR FROM LOBBY OR MAIL ROOM AREAS.
  
 21. PG.M2-00 6" ROUND SUPPLY TO MAIL ROOM
 SHOWS A FIRE DAMPER IN-LINE.HOW WILL FIRE
 DAMPER ACCESS BE PROVIDED IN FLEXIBLE DUCT?
  
 22. PG.M2-00 AHU 2 DOES NOT SHOW ANY
 RETURN AIR FROM SUNDRIES SHOP.
  
 23. PG.M3-00 - M3-02 UNITS C,D1,D2,D3,
 E,F,G,P1,P2,P3 SHOW TRANSFER GRILLS LOW ON
 ONE SIDE OF WALL AND HIGH ON OTHER SIDE. IS
 THE INTENTION TO USE THE STUD WALL CAVITY TO
 CONVEY RETURN AIR FROM BEDROOMS? IF SO,
 PLEASE PROVIDE DETAIL SHOWING COMPLIANCE
 WITH BOTH FBC,M 602.3(5) AND FBC CH.13
 SECTION 610.1.ABC.3.6.
  
 24. PG.M4-00 NO INFORMATION IS PROVIDED
 AS TO TYPE OF DUCT TO BE USED IN SHAFTS OR
 THE REQUIRED THICKNESS/R-VALUE OF DUCT
 INSULATION. ENSURE DIMENSIONS OF SHAFTS ARE
 LARGE ENOUGH TO ACCOMODATE DUCT INSULATION
 DIMENSIONS WITH SUPPORTS AND STANDING
 SEAMS AT DUCT JOINTS.
  
 25. PG.M4-00 RTU SYSTEMS 1,2,3 SHOW
 24X24 DIFFUSERS IN CORRIDORS. WHAT SIZE
 NECKS AND DUCT CONNECTIONS ARE NEEDED
 TO ACHIEVE DESIRED CFM?
  
 26. PG.M4-00 PLEASE GIVE DETAILS AS TO HOW
 DESIGN CFM IS TO BE ACHIEVED DURING
 CORRIDOR PRESSURIZATION MODE. EXAMPLE:
 RTU 1 IS RATED FOR 8,600 CFM. IF ALL SMOKE
 DAMPERS EXCEPT TWO (FLOOR ABOVE AND FLOOR
 BELOW) ARE CLOSED, WILL FAN SPEED BE ADJUSTED
 TO PROVIDE CFM CALLED FOR ON PLAN DURING THIS
 MODE? WILL CORRIDOR DUCT BE CONSTRUCTED SO
 AS TO WITHSTAND THE ADDITIONAL
 VOLUME/PRESSURE?
  
 27. PG.M4-00 RTU SYSTEMS 2,3 SHOW ONE
 24X24 DIFFUSER ON EACH FLOOR BUT THERE IS A
 NOTE AT THE LOCATION WHICH SAYS "(QTY 2)".
 PLEASE CLARIFY.
  
 28. PG.M4-01 RD-1 AND RD-2 REMOVE FIRE
 DAMPERS FROM THESE LOCATIONS AS A CLOSED
 FIRE DAMPER BLADE WILL ADVERSELY EFFECT THE
 PERFORMANCE OF THE STAIRWELL PRESSURIZATION
 SYSTEM.
  
 29. PG.M4-01 SPF-1 AND SPF-2 REQUIRE DUCT
 SMOKE DETECTORS PER FBC,M 606.2.1 AS
 THEY EXCEED 2,000 CFM.
  
 30. PG.M5-00 PLEASE PROVIDE ALL RELEVANT SUB-
 MITTAL DATA FOR EXHAUST FANS AND RTUS.
  
 31. PG.M5-01 DETAIL 4 AND 9, PLEASE PROVIDE
 DETAILS FOR ATTACHING CURBS, STANDS, DUCTS AND
 EQUIPMENT ON ROOF PER FBC,M 301.13.NOTE:
 THE CITY OF WEST PALM BEACH IS IN THE 140 MPH
 ZONE PER FBC 1606.
  
 32. PG.M5-01 ALL FIR OR FIRE/SMOKE DAMPERS ARE
 TO BE UL 555 LISTED AND INSTALLED PER MANUFACTURER'S
 INSTALLATION INSTRUCTIONS PER FBC,M 607.1.2.
  