| 2006-11-05 16:34:06 | **** THE EDGE PHASE II ** 17 STORY ** |
| | |
| | ********** UNSAT 2ND REVIEW *************** |
| | |
| | ** PLEASE KNOW PLANS ARE NOT COMPLETE AT THIS TIME FOR |
| | CODE COMPLIANCE. |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS REVIEW ARE STILL |
| | IN NEED OF ADDRESSING ALONG WITH NEW COMMENTS BASED ON |
| | PLANS SUBMITTED. |
| | ** PLEASE SEE NOTE BELOW ARE TAKEN DIRECTLY FROM |
| | PREVIOUS REVIEW WITH NEW NOTES ADDED TO THE BOTTOM OF |
| | THE REVIEW. |
| | |
| | |
| | 1) NOTE: OK. |
| | |
| | 2) NOTE:NO, PLEASE SEE TITLE BLOCKS FOR |
| | MECHANICAL/PLUMBING COMPANY DOES NOT CONTAIN THE |
| | CORRECT LICENSURE INFORMATION AS REQUIRED. PLEASE ALSO |
| | KNOW IT IS KNOWN TO THIS OFFICE THAT CEASE AND DESIST |
| | LETTERS WERE SENT TO THE COMPANY AND ENGINEERS AS SHOWN |
| | ON RECORD. PLEASE SEE NEW PLANS WERE SUBMITTED EVEN |
| | AFTER THIS WAS ISSUED BY THE STATE FLORIDA BOARD OF |
| | PROFESSIONAL ENGINEERS. PLEASE KNOW THAT ONE COMPLETE |
| | SET OF PLANS WILL BE FORWARDED TO THE BOARD AS |
| | REQUESTED BY THE STATE ONCE ALL REVIEWS ARE COMPLETED. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE MISSING LICENSE INFORMATION REQUIRED ON |
| | TITLE BLOCKS FOR CONSULTING ENGINEERING FIRM AS |
| | REQUIRED UNDER FLORIDA STATUES 471.023, FLORIDA |
| | ADMINISTRATIVE CODE 61G15-23.002. |
| | PLEASE SEE COMPANIES AS LISTED ARE PROVIDING |
| | ENGINEERING SERVICES" AND NO |
| | CERTIFICATE OF AUTHORIZATION NUMBER COULD BE LOCATED ON |
| | STATE WEBSITE OF DEPARTMENT OF BUSINESS AND |
| | PROFESSIONAL REGULATION. (DBPR). |
| | PLEASE KNOW AS REQUIRED BY THE SAID FLORIDA STATUES AND |
| | LICENSING UNDER FS |
| | 468 FOR THIS OFFICE, ONE SET OF MEP PLANS ARE BEING |
| | RETAINED AND SHALL BE FORWARDED TO THE FLORIDA BOARD OF |
| | PROFESSIONAL ENGINEERS FOR REVIEW OF SAID REQUIREMENTS. |
| | WE HAVE CONSULTED WITH THE FBPE'S ON THE ABOVE. PLEASE |
| | CONTACT MR. JERRY ONGLEY AND MR. DOUGLAS SUNSHINE IF |
| | THERE ARE ANY QUESTIONS. |
| | ** PLEASE KNOW, THESE REQUIREMENTS ARE ALSO FOR THE |
| | OTHER CONSULTING COMPANIES AS LISTED ON SAID TITLE |
| | BLOCKS. |
| | |
| | 3) NOTE:NO, PLEASE SUBMIT ALL AS PREVIOUS REQUESTED. |
| | PLEASE SEE REVIEW OF CODE COMPLAINT ITEMS CAN NOT BE |
| | VERIFIED AS THERE HAVE BEEN CHANGES SINCE PHASE ONE |
| | PLANS PER RESPONSE AND REVIEW OF THESE DO NOT |
| | CORRELATE.110.3, 90.7, NFPA-20 ETC. |
| | FBC ADMIN SECTION 104.2.1 |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE SPECS SUBMITTED FOR FIRE PUMP CONTAIN THE |
| | TITLE AND THE RESPONSIBLE ENGINEER AS STEVEN FELLER OF |
| | FELLER ENGINEERING. STEVEN FELLER AND FELLER |
| | ENGINEERING ARE THE CONSULTING ENGINEERS OF PHASE-ONE. |
| | PLEASE CORRECT ALL SUBMITTALS FOR FIRE PUMP, FIRE PUMP |
| | CONTROLLER ETC. |
| | |
| | 4) NOTE: NO, RESPONSE MENTIONS THIS PROJECT IS UNDER |
| | THE 2001 FBC WHICH WAS NOT THE REQUEST. PLEASE LIST THE |
| | FOLLOWING CODES ON PLANS RELEVANT TO DESIGN AS THE |
| | FOLLOWING CODES ARE IN EFFECT FOR THIS PROJECT UNDER |
| | THE 2001 FBC. |
| | |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE BE SURE PLANS REFERENCE ALL CURRENT CODE IN |
| | EFFECT FOR THIS PROJECT. PLEASE KNOW WE ARE CURRENTLY |
| | UNDER THE 2003 NFPA-101, 2002 NFPA-72 AND 2002 NFPA-70 |
| | ETC. |
| | |
| | 5) NOTE:NO, PLEASE SEE NOW DOORS ARE EVEN MISSING |
| | FROM ELECTRICAL FLOOR PLANS? PLEASE KNOW THE ENTRANCE |
| | LOCATION FOR ACCESS IS ALSO A MAIN CONCERN. RESPONSE |
| | SPEAKS OF EGRESS WHICH IS ALSO IMPORTANT, HOWEVER |
| | OBTAINING ACCESS TO THE MAIN ELECTRICAL ROOM IS MOST |
| | IMPORTANT IF THE FIRE DEPT PERSONNEL IS IN NEED OF |
| | SHUTTING DOWN POWER. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE KNOW, ENTRANCE TO MAIN ELECTRICAL ROOM SHALL BE |
| | DETERMINED BY THIS OFFICE AND FIRE MARSHAL'S OFFICE FOR |
| | ACCESSIBILITY. PLANS INDICATE ACCESS GRANTED THROUGH |
| | GARAGE AREA AND TRAVEL DISTANCE IN BLDG MAY REQUIRED A |
| | MORE ACCESSIBLE MEANS TO MAIN ELECTRICAL ROOM. |
| | ** PLEASE SEE POSSIBLE FIRE REVIEW COMMENTS. |
| | |
| | 6) NOTE: NO, PLEASE SEE NOTE ABOVE AS DOORS ARE NOT |
| | SHOWN ON LAYER AS PRINTED FOR FIRST FLR. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE 110.26 FOR MIN DOOR(S) REQUIRED FOR MAIN |
| | ELECTRICAL ROOM. PLEASE SEE ONE MAIN/EQUIPMENT LOCATED |
| | DIRECTLY IN-FRONT OF THE EGRESS PATH/DOOR. PLEASE SEE |
| | PANIC HARDWARE SHALL BE REQUIRED AND DOORS MUST OPEN IN |
| | THE DIRECTION OF TRAVEL. PLEASE PROVIDE A NOTE ON PLANS |
| | FOR THIS. |
| | A NOTE ON E4.00 STATES "DOOR NEEDS TO BE RELOCATED", |
| | HOWEVER THIS WAS NOT DONE AND IS SHOWN THE SAME IN |
| | A-SHEETS AND E-SHEETS. |
| | PLEASE ADD NOTE(S) TO PLANS FOR ALL CLEARANCES PER |
| | 110.26 SHALL BE MET. |
| | 4.00 ETC |
| | |
| | 7) NOTE: OK. |
| | |
| | 8) NOTE: NO, SAME NOTE, A BATTERY BACK UP FIXTURE IN |
| | STAIRS WILL BE REQUIRED MIN AT EVERY OTHER LANDING. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE NFPA-72 WHICH REQUIRES BATTERY BACK UP |
| | FIXTURES IN STAIR TOWERS AND OTHER AREAS WHERE EM LTS |
| | ARE REQUIRED FOR MIN EGRESS PATHS. |
| | PLEASE SEE 7.9.2.2 WHICH STATES NO SINGLE MEANS OF OVER |
| | CURRENT PROTECTION OR SWITCHING ETC SHALL LEAVE ANY |
| | EGRESS PATHS IN TOTAL DARKNESS AS SHOWN ON PLANS. |
| | PLEASE KNOW AS REQUIRED BY THE AHJ AND THE FIRE |
| | MARSHAL'S OFFICE A BATTERY BACK-UP FIXTURE OF SOME SORT |
| | WILL BE REQUIRED FOR THESE EGRESS PATHS TO ALLEVIATE |
| | THE ABOVE. |
| | |
| | 9) NOTE: NO/YES, PLEASE PROVIDE THE STAIRS SEPARATELY; |
| | THE CALCULATIONS SEEM TO FIGURE IN ALL OTHER AREAS. THE |
| | STAIR MINIMUM LIGHTING LEVELS ARE THE MOST IMPORTANT. |
| | |
| | ** PREVIOUS REVIEW NOTE **PLEASE PROVIDE COMPLETE |
| | PHOTO-METRICS FORALL STAIR-TOWERS AND EGRESS PATHS. |
| | PLEASE SEE LS 101 7.8.1.3 WHICH REQUIRES A MINIMUM OF |
| | 10FT/CANDLES (108 LUX) FOR STAIR TOWERS UNDER NORMAL |
| | CONDITIONS AND A MIN OF 1FT/CD UNDER EMERGENCY |
| | CONDITIONS. |
| | 7.9.2.2 |
| | |
| | 10) NOTE: OK, HOWEVER PLEASE KNOW FIXTURE TYPE FOR |
| | STAIR TOWERS WILL BE REVISED. |
| | |
| | 11) NOTE: OK. |
| | |
| | 12) NOTE: NO, COULD NOT LOCATE IN PACKAGE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SUBMIT A LETTER FROM THE |
| | FLORIDA POWER AND LIGHT REPRESENTATIVE ON THE |
| | ACCEPTANCE OF FPL VAULT AS SHOWN. |
| | |
| | 13) NOTE:NO, PLEASE SEE THERE ARE STILL SOME COMMON |
| | AREAS WHICH ARE MISSING CIRCUITING AND SOME MINOR |
| | CIRCUITS IN UNITS. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE COMPLETE PLANS WITH ALL CIRCUITING AND CORRELATE |
| | WITH SUBMITTED PANEL SCHEDULES. REVIEW FOR CODE |
| | COMPLIANCE CAN NOT BE DONE AT THIS TIME. |
| | PLEASE BE SURE TO SEE 210.52B1,210.52D,210.11C3 ETC. |
| | |
| | 14) NOTE:NO, PLEASE SEE SOME HEAT STRIP UNITS ARE NOT |
| | INDICATING THIS. PLEASE SEE SOME OF THESE ARE SHOWN |
| | ABOVE THE NORMAL? |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE 424.3B WHICH REQUIRES OCP FOR AHU/HEAT TO BE |
| | SIZED AT A MIN OF 125%. PLEASE SEE SOME OCP AS |
| | INDICATED WILL NEED TO BE ADJUSTED. |
| | ** PLEASE BE SURE TO ADJUST AND CONDUCTOR SIZES AS |
| | NEEDED. PER 310.16,240.4 ETC |
| | |
| | 15) NOTE: OK. |
| | |
| | 16) NOTE: OK, HOWEVER SEE NEW NOTES WITH RESPECT TO |
| | PANEL SCHEDULES NOW THAT ROOMS AND AREAS ARE SHOWN. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PLACE ALL AREA AND ROOM DESIGNATIONS ON PLANS. |
| | PLEASE SEE PREVIOUS COMMENTS WITH RESPECT TO COMPLIANCE |
| | WITH CIRCUITING. |
| | |
| | 17) NOTE: OK. |
| | |
| | 18) NOTE: NO,/ OK, PLEASE SEE THE DETECTORS ARE NOW |
| | SHOWN HOWEVER AS THESE ACT ON A INDIVIDUAL UNIT BASIS, |
| | PLEASE SEE NFPA-72 DEFINITIONS AS SMOKE DETECTORS DO |
| | ONLY THAT, DETECT. PLEASE ADJUST NOTES TO READ AS SMOKE |
| | ALARMS AS THESE ARE DEVICES WHICH ACTUALLY DETECT AND |
| | SOUND AN ALARM WHICH IS WHAT IS BEING STATED IN THE |
| | NOTES. |
| | PLEASE ALSO SEE 11.8.3. AS INSTALLATION ALSO INCLUDES |
| | ANY DEVICES WITHIN 20FT OF COOKING APPLIANCES WHICH |
| | REQUIRE A DIFFERENT TYPE OF DEVICE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE NFPA-72 11.8.3.5, 11.5.1.1 FOR SMOKE |
| | DETECTORS REQUIRED INSIDE AND OUTSIDE ALL SLEEPING |
| | RMS. |
| | PLEASE SEE UNIT D1, PLEASE ALSO SEE OTHER UNITS WHERE |
| | SD'S DO NOT APPEAR TO BE "OUTSIDE" SLEEPING AREAS OR |
| | CORRIDORS. PLEASE SEE A DOOR SEPARATES BEDRM HALLWAYS |
| | FROMLIVING/COMMON AREA OF UNIT. THIS SEEMS TO SHOW |
| | NO SD COVERAGE FOR AREAS OUTSIDE BEDROOMS. PLEASE FIRE |
| | REVIEW COMMENTS. |
| | ** PLEASE PLACE NOTE ON PLANS WITH REFERENCE TO THE MIN |
| | PLACEMENT REQUIREMENTS OF ABOVE NFPA. PLEASE SEE THAT |
| | SD'S ARE LOCATED A MIN OF 3' FROM BATH, KITCHEN DOORS, |
| | 3' FROM SUPPLY REGISTERS, ETC: WITH EXCEPTIONS AS |
| | LISTED FOR LOCATIONS WITHIN 20' OF COOKING APPLIANCES. |
| | ** PLEASE SEE SPECS/LISTING FROM SD MANUFACTURE AS MANY |
| | REQUIRED SD'S TO BE FURTHER THAN LISTED ABOVE AND MOST |
| | REQUIRED SD'S TO BE 5' FROM THE RETURN AIR GRILLE. |
| | ** PLEASE KNOW, ANY CEILING HEIGHT VARIATIONS MAY |
| | CHANGE LOCATION OF SD'S, AS THEY ARE REQUIRED TO BE |
| | LOCATED WITHIN 12" OF THE HIGHEST POINT OF A FLAT |
| | CEILING. |
| | |
| | 19) NOTE: OK. |
| | |
| | 20) NOTE: OK, SEEM TO BE OK.. |
| | |
| | 21) NOTE: OK. |
| | |
| | 22) NOTE: OK, HOWEVER SEE NOTE FOR FIRST FLR AREA IN |
| | NEW NOTE. |
| | |
| | 23) NOTE:NO, PLEASE SEE 3RD FLOOR. ALSO SEE OTHER |
| | NOTES. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE CORRELATE ELECTRICAL ROOMS AND RISER DIAGRAM. |
| | PLEASE SEE E4.0 SHOWS ELECTRICAL RM ON EVERY FLR, |
| | HOWEVER RISER DOES NOT. |
| | PLEASE SEE OTHER COMMENTS WITH RESPECT TO ELECTRICAL |
| | RMS. |
| | 215.5 |
| | |
| | 24) NOTE: OK. |
| | |
| | 25) NOTE: NO, PLEASE SEE ONE STILL SHOWN AS 2500A'S AND |
| | THE OTHER 3200A'S. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE CORRELATE MAIN ELECTRICAL ROOM EQUIPMENT WITH |
| | RISER DIAGRAM. PLEASE SEE ONE SHOWS 3000A MAIN, THE |
| | OTHER 4000A, PLEASE SEE ELECTRICAL PANELS SHOWN ON 4.00 |
| | ALSO DO NOT CORRELATE WITH RISER. |
| | PLEASE SEE MANY OF THESE ITEMS/LOCATIONS WERE REDLINED |
| | ON ONE SET. |
| | |
| | 26) NOTE: NO, SEE 3RD FLR. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE METER CENTERS ON ELECTRICAL ROOMS SHOWN ON |
| | E4.00 DO NOT CORRESPOND TO THE METER CENTERS ON 5.02 |
| | |
| | 27) NOTE: OK. |
| | |
| | 28) NOTE: OK. |
| | |
| | 29) NOTE:NO, PLEASE SEE LETTER RESPONSE MENTIONS THIS |
| | IS IN PHASE ONE PLANS, HOWEVER THIS BUILDING OF PHASE |
| | II IS BEING DONE UNDER ITS OWN RECORD AND SHALL |
| | INDICATE ALL INFORMATION PERTINENT TO THE DESIGN, LIFE |
| | SAFETY OF CONDUCTORS OVER CURRENT PROTECTION ETC. |
| | PLEASE SEE RESPONSE LETTER MENTIONS OCP IS AT 800A'S?, |
| | HOWEVER PLEASE SEE THE FEEDERS AS SHOWN ON THIS RISER |
| | ONLY INDICATE CONDUCTORS RATED FOR 680A'S. PLEASE SEE |
| | 240.4B, AND 240.6. AS THE FEEDERS ARE ONLY RATED AT |
| | 680A'S AND THE LOAD ITSELF SHOWN IS 708A'S, PLEASE MAKE |
| | NEEDED ADJUSTMENTS WITH THE CONDUCTORS AS SHOWN. |
| | 310.16, 110.14 |
| | PLEASE STILL BE SURE TO CORRELATE ALL WITH THE PHASE I |
| | ENGINEERING DESIGN TEAM. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE OCP LOCATED AT GENERATOR WHICH IS PART |
| | OF THE PHASE 1 HIGH-RISE BLDG. |
| | PLEASE SEE EQUIPMENT SPECS INDICATE THE |
| | GEN AT 1000KW. |
| | 215.5 |
| | |
| | 30) NOTE: OK, HOWEVER NOTES FOR SIGNAGE NOT SHOWN. |
| | PLEASE ALSO SEE RISER SHOWS EDPH2 AND MCB, YET EDPH2 IS |
| | BEING SHOWN AS MLO ON PANEL SCHEDULE. |
| | PLEASE SEE NEW NOTES WITH RESPECT TO THE LOCATION OF |
| | SUCH EQUIPMENT. |
| | |
| | ** PREVIOUS REVIEW NOTE **] |
| | PLEASE PROVIDE A MEANS OF DISCONNECT FOR THE FEEDERS |
| | COMING FROM |
| | GEN.225.31-225.39 |
| | PLEASE SEE A MAIN CIRCUIT BRKR LOCATED IN EDPH2 WOULD |
| | BE ACCEPTABLE. |
| | SHALL ALSO REQUIRE SIGNAGE. |
| | 230.2E,700.8 ETC. |
| | |
| | 31) NOTE:NO, PLEASE SEE PLANS AND CIRCUITS IN THIS |
| | BUILDING STILL INDICATE ELECTRICAL BEING IN THIS |
| | BUILDING FROM A PANEL IN THE PHASE I BUILDING WHICH IS |
| | NOT AND WILL NOT BE PERMITTED. THESE ARE SEPARATE |
| | BUILDINGS AND NO ELECTRICAL IN THIS PHASE II BLDG MAY |
| | BE FED FROM THE PHASE II. |
| | PLEASE SEE FBC DEFINITIONS OF BUILDINGS, WHICH WOULD |
| | REQUIRE A FIREWALL, PLEASE SEE FIREWALL DEFINITION. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE PANEL "GH" AS SHOWN ON RISER WHICH IS SHOWN |
| | FROM ANOTHER BLDG AND ANOTHER SERVICE, MAY NOT BE |
| | LOCATED IN THIS BLDG.230.3 |
| | *****PLEASE KNOW AS CONDITION SET FORTH BY THE DESIGN |
| | TEAM ON PHASE ONE, A COMPLETE SEPARATION OF ALL |
| | ELECTRICAL SYSTEMS WILL TAKE PLACE AND A COMPLETE 4 HR |
| | SEPARATION WILL BE PROVIDED BETWEEN PARKING GARAGE AND |
| | PHASE II HIGH RISER BLDG. PLANS DO NOT SEEM TO |
| | CORRELATE WITH THIS. PLEASE KNOW, GARAGE IS NOW SHOWING |
| | ELECTRICAL DEVICES/SYSTEMS FED FROM TWO SEPARATE |
| | SERVICES WHICH WILL NOT BE PERMIT. A DEFINITIVE |
| | SEPARATION WILL BE PROVIDED AND CROSSING OVER OF |
| | SYSTEMS WILL NOT BE ACCEPTABLE. |
| | 230.2, 230.3 ETC, 90.4 |
| | |
| | 32) NOTE: OK. |
| | |
| | 33) NOTE: OK. |
| | |
| | 34) NOTE: NO/, PLEASE SEE RISER OF THE 3/0 SHALL EXTEND |
| | THROUGH OUT BUILDING. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE A COMPLETE GROUNDING ELECTRODE RISER IN |
| | BLDG AND PROVIDE THIS LINE DIAGRAM ON ELECTRICAL RISER. |
| | THIS SHOULD INCLUDE ALL GROUNDING FOR |
| | TRANSFORMER(S)/SEPARATELY DERIVED SYSTEMS.250.58 |
| | |
| | 35) NOTE: OK. |
| | |
| | 36) NOTE:NO, THE LOADS SHOWN AS CONNECTED LOADS ON |
| | PANELS ARE NOT THE LOAD CALCULATIONS NEEDED FOR ALL |
| | MAINS AND BUILDING SERVICES AS SHOWN. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE NO LOAD CALCULATIONS WERE SUBMITTED FOR |
| | MAINS, SERVICES, METER CENTERS ETC. MC1? |
| | PLEASE SEE SOME CONNECTED LOADS DO NOT INDICATE LOADS |
| | AND HOW THEY WERE DERIVED? |
| | PLEASE KNOW VERIFICATION OF CODE COMPLIANCE FOR SERVICE |
| | SIZES, FEEDERS, |
| | SEC'S ETC CAN NOT BE VERIFIED OR REVIEWED AT THIS |
| | TIME. |
| | 310.16.240.4, 220, 215.5 |
| | PLEASE BE SURE ALL CONTINUOUS LOADS ARE SHOWN AND |
| | FIGURED AT 125%, |
| | 215.3, 230.42 ETC. |
| | |
| | 37) NOTE: NO, NOT SUBMITTED, PLEASE KNOW THIS IS |
| | REQUIRED AT THIS TIME IF PERMIT IS GOING TO BE ISSUED. |
| | PLEASE KNOW, ANY MANUFACTURE CAN BE CHOSEN WHICH MEETS |
| | THE SIZES AND LISTINGS AS NEEDED. PLEASE KNOW AT ANY |
| | TIME AT A LATER DATE THIS MAY BE REVISED. |
| | 90.7, 110.3 |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE VERIFY AND SUBMIT SPECS FOR BUS-DUCT AS LOCAL |
| | AMENDMENT DOES NOT PERMIT ALUM AS THE EQUIPMENT |
| | GROUNDING METHOD. 250.62 SEE PREVIOUS NOTES. |
| | |
| | 38) NOTE: NO, SAME NOTE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE SPEC BOOKS SUBMITTED ARE FOR EQUIPMENT AND |
| | SPEC BOOK FOR JOB-SITE WAS NOT SUBMITTED AT THIS TIME. |
| | PLEASE SEE SOME OF THE ABOVE COMMENTS WHICH MAY AFFECT |
| | PAGES IN THE JOB-SITE SPEC BOOKS. THESE SHOULD BE |
| | REVIEWED AND MAKE ANY CHANGES AS NEEDED. |
| | |
| | 39) NOTE: OK, THE MAINS HAVE NOW BEEN DECREASED FROM |
| | 1000A?S DOWN TO 800A?S; HOWEVER AS LOAD CALCULATIONS |
| | HAVE NOT YET BEEN SUBMITTED FOR ALL, THIS IS YET TO BE |
| | VERIFIED FULLY. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE 230.95, 240.13 WHICH REQUIRES GROUND FAULT |
| | PROTECTION FOR SYSTEMS WITH A VOLTAGE MORE THEN 150V TO |
| | GROUND AND OVER 1000A'S. |
| | PLEASE SEE "MSBH2. |
| | |
| | 40) NOTE: OK, 4-POLE SHOWN.. |
| | |
| | 41) NOTE:NO, NOT VERIFIED AT THIS TIME. RESPONSE |
| | MENTIONS PART OF PHASE I WHICH IS KNOW, HOWEVER AS THIS |
| | STATES THE FIRE PUMP IS NOW DIESEL AND THE SPECS |
| | SUBMITTED ARE FOR AN ELECTRICAL FIRE PUMP, SOME |
| | COORDINATION NEEDS TO TAKE PLACE WITH THE DESIGN TEAM |
| | FROM PHASE I AND PLEASE KNOW AT THIS TIME CODE |
| | COMPLIANCE WITH NFPA-20 FOR MINIMUM FUEL CONSUMPTION IF |
| | INDEED DIESEL CAN NOT BE CONFIRMED. |
| | 90.7, 110.3, NFPA-20, CHAPTERS 6, 7 AND 8, AT THIS TIME |
| | THERE ARE TOO MANY SECTIONS TO LIST WHEN INFORMATION |
| | PROVIDED DOES NOT CORRELATE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE MISSING FIRE PUMP AND EQUIPMENT NOT |
| | INDICATED ON RISER DIAGRAM. |
| | PLEASE SEE 695.4B1 FOR OCP REQUIRED FOR LOCKED ROTOR. |
| | PLEASE ALSO SEE NFPA-20 FOR ELECTRICAL REQUIREMENTS FOR |
| | MEANS-OF DISCONNECT LOCATION ETC. PLEASE SEE SPECS |
| | SUBMITTED APPEAR TO SHOW THIS, HOWEVER NONE OF THESE |
| | ITEMS ARE SHOWN ON RISER. UNABLE TO VERIFY CODE |
| | COMPLIANCE FOR FIRE PUMP, FIRE PUMP CONTROLLER, |
| | FEEDERS, SEC'S ETC. |
| | ** PLEASE SEE SPECS WHICH CONTAIN THE TITLE FROM STEVEN |
| | FELLER'S OFFICE INDICATE THE PUMP AS 277/480V, 125HP. |
| | 215.5 |
| | |
| | 42) NOTE: NO, PLEASE SEE RISER AND SCHEDULE STILL DO |
| | NOT CORRELATE. |
| | PLEASE SEE "ERL2", PLEASE SEE RISER 45KVA AND PANEL |
| | SHOWS 30 ETC. |
| | PLEASE SEE THE MAXIMUM OCP FOR THE 112 KVA TRANSFORMERS |
| | SHALL BE SIZED PER 450.3. (125%). PLEASE SEE ONLY IF |
| | MEETING ALL THE EXCEPTIONS, OCP CAN BE HIGHER THAN |
| | 125% |
| | **PLEASE ALSO SEE NEW NOTES DUE TO PLANS AND CHANGES |
| | AND PANEL SCHEDULES SUBMITTED. |
| | |
| | |
| | **PLEASE CORRELATE ALL TRANSFORMERS WITH SCHEDULE(S). |
| | PLEASE SEE 112.5?, 150? KVA |
| | PLEASE ALSO CONFIRM KVA AS MAX OCP FOR TRANSFORMER MAY |
| | NOT EXCEED 125% AS 450.3 |
| | TABLES. |
| | |
| | 43) NOTE: OK. |
| | |
| | 44) NOTE: NO, PLEASE ONE OF THE PREVIOUS NOTES ABOVE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE THE COMPLETE GROUNDING ELECTRODE |
| | SYSTEMS DETAIL PER |
| | 250.50, 250.104, 250.64,,, |
| | |
| | 45) NOTE: OK, HOWEVER SEE NOTES AS NOTES ABOVE WITH |
| | RESPECT TO THE MLO AND MCB BEING DIFFERENT ON PANEL AND |
| | RISER. |
| | |
| | ** PREVIOUS REVIEW NOTE** |
| | PLEASE SEE EDPH2 IS SHOWN AS |
| | 1000A'S ON PANEL SCHEDULES AND SHOWN AS 800A ON RISER?? |
| | PLEASE CORRELATE. |
| | 215.5 |
| | |
| | 46 NOTE: OK, AS MSBE HAS NOW CHANGED TO 800A?S. |
| | |
| | 47)NOTE: OK, HOWEVER PLEASE KNOW, IF THIS INFORMATION |
| | IS NOT SUBMITTED, SEPARATE PERMITS PLANS AND FEES WILL |
| | BE REQUIRED BEFORE ANY SITE LIGHTING MAY BE INSTALLED. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE PANEL "SL" IS SHOWN AS HAVING "SITE |
| | LIGHTING" HOWEVER, SITE LIGHTING COULD NOT BE LOCATED |
| | ON ELECTRICAL PLANS? |
| | IF SITE LIGHTING CONTAINS LT POLES, PLEASE SUBMIT WIND |
| | LOAD CALCULATIONS FOR FBC 140MPH. THESE WILL BE |
| | REVIEWED BY A STRUCTURAL REVIEWER. ** PLEASE BE SHOULD |
| | POLE CONTAIN FIXTURES FOR CALCULATION PURPOSES. |
| | |
| | 48) NOTE: OK. |
| | |
| | 49) NOTE:NO, PLEASE SEE RISER SHOWS SOME ITEMS WHICH |
| | ARE STILL NOT LISTED ON PANELS SCHEDULES. PLEASE SEE |
| | 4EH2 TO 4EL2, MISSING ON PANEL SCHEDULE AND MISSING |
| | TRANSFORMER INFORMATION ETC. CAN NOT BE VERIFIED AT |
| | THIS TIME. |
| | |
| | ** PREVIOUS REVIEW NOTE ** PLEASE LABEL ALL |
| | TRANSFORMERS ON RISER AS INDICATED ON PANEL SCHEDULES. |
| | 215.5, 450, ETC |
| | |
| | 50) NOTE: OK. |
| | |
| | 51) NOTE:NO, PLEASE SEE NOTES WERE NOTED, HOWEVER |
| | PLEASE PROVIDE THE DETAIL FOR TYPICAL. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE A DISCONNECT DETAIL INCLUDING SIZE ETC |
| | FOR ROOF TOP UNITS. THIS MAY BE A "TYPICAL" DETAIL FOR |
| | EACH SIZE IF NOT ALL THE SAME. |
| | 215.5, 440.11 |
| | |
| | 52) NOTE: OK. |
| | |
| | 53) NOTE: NO, RESPONSE MENTIONS DEVICES HEIGHTS SHOWN |
| | ON E0.00, HOWEVER THE HEIGHTS ON DEVICES ARE NOT THE |
| | ONLY REQUIREMENTS FOR ELECTRICAL DEVICES. PLEASE LIST |
| | NOTE AS PREVIOUSLY REQUESTED. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE FAIR HOUSING ACT |
| | REGULATIONS, 24 CFR 100.205 WITH RESPECT TO THE |
| | LOCATIONS OF "ALL" ELECTRICAL DEVICES, CONTROLS. |
| | A NOTE IS LOCATED ON "GEN NOTES" WHICH MENTIONS THE |
| | HEIGHTS FOR RECEPTS AND SWITCHES, HOWEVER THIS SHOULD |
| | REFLECT |
| | FHAR ETC AS NOTED ABOVE. |
| | |
| | 54) NOTE:NO? PLEASE KNOW AS THE PHASING OF THIS |
| | PROJECT ANDHOW THIS IS BEING DONE AND HOW THE PLANS |
| | HAVE BEEN SUBMITTED SHOWING PARTS OF PHASE II BEING FED |
| | FROM PHASE I IS UNCLEAR. |
| | THE EGRESS PATH SEEMS TO HAVE BEEN SHOWN, HOWEVER AS |
| | THE BUILDING OF EACH PHASE IS NOT CLEAR, UNABLE TO |
| | REVIEW FOR ACTUAL INSTALLATION. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE THE AMENITY DECK DETAILS COULD NOT BE |
| | LOCATED IN SETS. |
| | PLEASE SEE E2.06 WHICH ONLY SEEMS TO INDICATE A PARTIAL |
| | AREA SHOWN. |
| | PLEASE SEE NO ELECTRICAL SHOWN FOR LIGHTING ETC? |
| | PLEASE SEE LS 101 7.8 AND 7.9 WHICH REQUIRE MEANS OF |
| | EGRESS LIGHTING TO THE PUBLIC RIGHT OF WAY; THIS WOULD |
| | INCLUDE EMERGENCY LIGHTING AS REQUIRED. |
| | PLANS NOW SHOW A SEPARATE PHASE LINE, AS GARAGE WAS TO |
| | BE BUILT WITH PHASE ONE BLDG AND DID NOT SHOW GARAGE |
| | WITH PHASE LINE DOWN THE CENTER OF THE GARAGE. |
| | |
| | |
| | ** NEW NOTES 2ND REVIEW *** |
| | NOTES ARE BASED ON REVISIONS MADE TO PLANS AND |
| | INFORMATION NOW SUBMITTED. PLEASE SEE ALSO NEW NOTES |
| | WHICH WERE NOT COMMENTED ON THE PREVIOUS REVIEW #63 AND |
| | 64 AS THIS WAS NOT PART OF THE ELECTRICAL REVIEW. |
| | |
| | 55) NOTE: PLEASE SEE MSBH2 IS MISSING |
| | CONDUCTORS/FEEDERS FOR H-2 AND SL1. |
| | 310.16, 240.4,215.5 ETC |
| | |
| | 56)NOTE: PLEASE SEE MSBH2 PANEL SCHEDULE FOR OCP |
| | DEVICES FOR EACH PANEL BEING SERVED DOES NOT CORRELATE |
| | WITH THE OCP DEVICES SHOWN ON RISER. PLEASE ALSO |
| | CORRELATE CONDUCTORS/FEEDERS. |
| | 408.4, 310.16, 240.4 |
| | |
| | 57) NOTE: PLEASE SEE FEEDERS ON THE SECONDARY SIDE FOR |
| | RL2 SHOW #6'S WHICH TERMINATE IN 100A OCP. PLEASE SEE |
| | 240.21C, 408.16, 310.16 ETC, |
| | PLEASE SEE THE LOAD ON THIS PANEL EXCEEDS THAT OF THE |
| | RATING OF THE #6'S IN EITHER CASE. |
| | |
| | 58) NOTE: PLEASE SEE PANEL SCHEDULE FOR MSBH2 WHICH |
| | SHOWS 400A OCP FEEDING PANEL H2 WHICH IS ONLY RATED AT |
| | 225A'S? PLEASE SEE CONDUCTORS ON PANEL SCHEDULE ARE |
| | MISSING HOWEVER SHOWN ON RISER. |
| | 240.4, 408, ETC |
| | |
| | 59) NOTE: PLEASE SEE RISER SHOWS FPL SERVICE |
| | TRANSFORMER BEING 120/208V , YET THIS IS BEING SHOWN |
| | FEEDING 277/480V SYSTEMS?? |
| | |
| | 60) NOTE: PLEASE SEE PANEL SCHEDULES FOR UNITS INDICATE |
| | A 1-POLE BREAKER FEEDING EACH OF THE DISHWASHER AND |
| | DISPOSAL RECEPTACLE, HOWEVER PLEASE SEE 210.4B AS THIS |
| | WOULD BE REQUIRED TO BE A 2-POLE BRKR IF FEEDING A |
| | DEVICE ON SAME YOKE. |
| | |
| | 61) NOTE: PLEASE SEE FBC 2001 CHAPTER 13, THE ENERGY |
| | CALCULATIONS SUBMITTED ARE NOT SIGNED, DATED OR SEALED |
| | BY THE RESPONSIBLE DESIGN PROFESSIONAL. |
| | FS 471.025, FAC 61G15-23.002 |
| | |
| | 62) NOTE: PLEASE SEE FIRE SPRINKLER SHEETS ARE BEING |
| | SEALED WITH A SEAL AND STAMP WHICH IS NOT PERMITTED |
| | (RUBBER STAMP) AND SEAL WHICH IS NO LONGER VALID WITH |
| | THE STATE. PLEASE SEE RULING IN THE FAC 61G15-23.001 |
| | WHICH REQUIRED ALL ENGINEERS TO OBTAIN THEIR NEW SEALS |
| | WITH THE WORDING OF "LICENSE" AND "CERTIFICATE" WAS NOT |
| | LONGER PERMITTED. THIS RULE WAS PAST IN 2/04, HOWEVER |
| | AN EXTENSION WAS GRANTED TO 12/31/05 ONLY. |
| | |
| | 63) NOTE: PLEASE SEE FPL VAULT IS SHOWING A STROBE |
| | DEVICE FROM THE BUILDINGS FA SYSTEM WHICH IS NOT |
| | PERMITTED. NO EQUIPMENT OR ELECTRICAL DEVICES OF ANY |
| | KIND ARE PERMITTED IN THE FPL VAULT. |
| | |
| | 64) NOTE:PLEASE SEE ALL AUDIBLE AND VISUAL DEVICES |
| | FOR FA SYSTEMS ARE REQUIRED TO MEET FBC 2001, |
| | 11-4.28.1, PLEASE LIST AND SHOW COMPLIANCE FOR |
| | 11-4.28.2 AND 11-4.28.3(4). PLEASE SEE THERE ARE MANY |
| | LOCATIONS FOR MIN CANDELAS DO NOT SEEM TO HAVE BEEN |
| | MET. |
| | |
| | 65) NOTE: PLEASE SEE E2.01, PLEASE SEE AREAS AND WALL |
| | OUTSIDE UNIT A3, WHICH DO NOT SEEM TO BE COMPLETE? |
| | PLEASE CLARIFY HOW ACCESS TO THE FIRE COMMAND ROOM WILL |
| | TAKE PLACE, COULD NOT LOCATE ANY DOORS ON THIS SHEET |
| | FOR THIS?? |
| | |
| | 66) NOTE: PLEASE BE SURE TO GO BACK AND CHECK ALL |
| | KITCHEN COUNTER SPACES PER 210.52C1, E-2, G1A, ETC. |
| | |
| | 67) NOTE: PLEASE SEE NOW THAT ROOM AND AREA |
| | DESIGNATIONS ARE PLACES ON PLANS, PLEASE REVISE PANEL |
| | SCHEDULES FOR UNITS TO CORRELATE WITH THESE ROOMS AND |
| | AREAS. INSTEAD OF GEN LTS, GEN RECEPTS, IT WOULD |
| | MENTION: BEDRM, #2 LTS, MASTER BDRM RECEPTS ETC. |
| | 408.4. |
| | |
| | 68) NOTE: PLEASE SEE NFPA-110 7.2.2.1. TRANSFER |
| | SWITCHES SHALL BE PERMITTED TO BE INSTALLED IN THE |
| | NORMAL ELECTRICAL SERVICE ROOM WHERE TWICE THE |
| | CLEARANCE REQUIRED BY ARTICLE 110.26(A) OF NFPA 70, |
| | NATIONAL ELECTRICAL CODE, EXISTS BETWEEN EQUIPMENT |
| | ENCLOSURES. |
| | PLEASE ADJUST ROOM AS NEEDED AND REQUIRED. |
| | |
| | |
| | |
| | ** NOTE: PLEASE SEE MANY OF THE ABOVE ITEMS WERE |
| | REDLINED ON ONE SET FOR AREAS OF NOTES ABOVE. |
| | |
| | ** NOTE: PLEASE SEE POSSIBLE NOTES FROM OTHER |
| | REVIEWER(S) WHICH MAY AFFECT ELECTRICAL PLANS AND |
| | DESIGN. |
| | |
| | * ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| 2006-11-05 11:30:44 | REVIEW IN PROGRESS |
| 2006-08-23 00:00:00 | REVIEW STOPPED ON 8/23 , PLANS WILL GO |
| | INTO "F" STATUS ONCE REVIEW IS |
| | COMPLETED. |
| | NOTES WILL FOLLOW. |
| 2006-08-22 00:00:00 | REVIEW IN PROGRESS |
| 2006-08-20 00:00:00 | ** ONE ROLL OF MEP, FP IN ELECTRICAL |
| | FOR REVIEW. |