Date Text
2006-01-27 00:00:00**** THE EDGE PHASE II ** 17 STORY **
  
 ********** UNSAT ***************
  
 ** PLEASE KNOW, PLANS ARE NOT COMPLETE
 AND REVIEW BELOW IS BASED ON PLANS
 SUBMITTED.
 PLEASE ALSO KNOW, SINCE PLANS ARE NOT
 COMPLETE, THERE MAY OR MAY NOT BE
 FURTHER COMMENTS ON NEXT REVIEW.
  
  
 1)NOTE: PLEASE SEE ADDRESSING NEEDS TO
 BE ADDRESSED AS PERMIT APPLICATION
 MENTIONS 350 S AUST, PCN USED ON
 APPLICATION IS FORRR 300 S AUST.
 PLEASE ALSO SEE PLANS INDICATE 300 S
 AUSTRALIAN AVE.
 PLEASE BE SUREADDRESS IS CORRECTED
 WITH THE ADDRESSING DEPT AND ADJUST
 PLANS IF NEEDED.
  
 2)NOTE: PLEASE SEE MISSING LICENSE
 INFORMATION REQUIRED ON TITLE BLOCKS FOR CONSULTING
 ENGINEERING FIRM AS REQUIRED
 UNDER FLORIDA STATUES 471.023, FLORIDA ADMINISTRATIVE
 CODE 61G15-23.002.
 PLEASE SEE COMPANIES AS LISTED ARE
 PROVIDING ENGINEERING SERVICES" AND NO
 CERTIFICATE OF AUTHORIZATION NUMBER
 COULD BE LOCATED ON STATE WEBSITE OF
 DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION.
 (DBPR).
 PLEASE KNOW AS REQUIRED BY THESAID
 FLORIDA STATUES AND LICENSINGUNDER FS
 468 FOR THIS OFFICE, ONE SET OF MEP
 PLANS ARE BEING RETAINED AND SHALL BE
 FORWARDED TO THE FLORIDA BOARD OF
 PROFESSIONAL ENGINEERS FOR REVIEW OF
 SAID REQUIREMENTS. WE HAVE CONSULTED
 WITH THEFBPE'S ON THE ABOVE. PLEASE
 CONTACT MR. JERRY ONGLEY AND MR. DOUGLAS
 SUNSHINE IF THERE ARE ANY QUESTIONS.
 ** PLEASE KNOW, THESE REQUIREMENTS ARE
 ALSOFOR THE OTHER CONSULTING COMPANIES
 AS LISTED ON SAID TITLE BLOCKS.
  
 3)NOTE: PLEASE SEE SPECS SUBMITTED FOR
 FIRE PUMP CONTAIN THE TITLE AND THE
 RESPONSIBLE ENGINEER AS STEVEN FELLER OF
 FELLER ENGINEERING. STEVEN FELLER AND
 FELLER ENGINEERING IS THE CONSULTING
 ENGINEERS OF PHASE-ONE.
 PLEASE CORRECT ALL SUBMITTALS FOR FIRE
 PUMP, FIRE PUMP CONTROLLER ETC.
  
 4)NOTE: PLEASE BE SURE PLANS REFERENCE
 ALL CURRENT CODE IN EFFECT FOR THIS
 PROJECT. PLEASE KNOW WE ARE CURRENTLY
 UNDER THE 2003 NFPA-101, 2002 NFPA-72
 AND 2002 NFPA-70 ETC.
  
 5)NOTE: PLEASE KNOW, ENTRANCE TO MAIN
 ELECTRICAL ROOM SHALL BE DETERMINED BY
 THIS OFFICE AND FIRE MARSHAL'S OFFICE
 FOR ACCESSIBILITY. PLANS INDICATE ACCESS
 GRANTED THROUGH GARAGE AREA AND TRAVEL
 DISTANCE IN BLDG MAY REQUIRED A MORE
 ACCESSIBLE MEANS TO MAIN ELECTRICAL
 ROOM.
 ** PLEASE SEE POSSIBLE FIRE REVIEW
 COMMENTS.
  
 6)NOTE: PLEASE SEE 110.26 FOR MIN
 DOOR(S) REQUIRED FOR MAIN ELECTRICAL
 ROOM. PLEASE SEE ONE MAIN/EQUIPMENT
 LOCATED DIRECTLY IN-FRONT OF THE EGRESS
 PATH/DOOR.
 PLEASE SEE PANIC HARDWARE SHALL BE
 REQUIRED AND DOORS MUST OPEN IN THE
 DIRECTION OF TRAVEL.PLEASE PROVIDE A
 NOTE ON PLANS FOR THIS.
 A NOTE ON E4.00 STATES "DOOR NEEDS TO BE RELOCATED" ,
 HOWEVER THIS WAS NOT DONE
 AND IS SHOWN THE SAME IN A-SHEETS AND
 E-SHEETS.
 PLEASE ADD NOTE(S) TO PLANS FOR ALL
 CLEARANCES PER 110.26 SHALL BE MET.
 4.00 ETC
  
 7)NOTE: PLEASE VERIFY WHERE LIGHTING IS
 FOR ELECTRICAL RMS ON FLRS
 2,5,6,7,10,16?
 215.5, LS1017.8,7.9 ETC
  
 8)NOTE: PLEASE SEENFPA-72 WHICH
 REQUIRES BATTERY BACK UP FIXTURES IN
 STAIR TOWERS AND OTHER AREAS WHERE EM
 LTS ARE REQUIRED FOR MIN EGRESS PATHS.
 PLEASE SEE 7.9.2.2 WHICH STATES NO
 SINGLE MEANS OF OVERCURRENT PROTECTION
 OR SWITCHING ETC SHALL LEAVE ANY EGRESS
 PATHS IN TOTAL DARKNESS AS SHOWN ON
 PLANS.
 PLEASE KNOW AS REQUIRED BY THE AHJ AND
 THE FIRE MARSHAL'S OFFICE A BATTERY
 BACK-UP FIXTURE OF SOME SORT WILL BE
 REQUIRED FOR THESE EGRESS PATHS TO
 ALLEVIATE THE ABOVE.
  
 9)NOTE: PLEASE PROVIDE COMPLETE
 PHOTO-METRICS FOR FOR ALL STAIR-TOWERS
 AND EGRESS PATHS. PLEASE SEE LS 101
 7.8.1.3 WHICH REQUIRES A MIN OF
 10FT/CANDLES (108 LUX) FOR STAIR TOWERS
 UNDER NORMAL CONDITIONS AND A MIN OF
 1FT/CD UNDER EMERGENCY CONDITIONS.
 7.9.2.2
  
 10)NOTE: PLEASE INDICATE BY SOME MEANS
 THE IDENTIFICATION OF ALL LIGHTING
 FIXTURES ON PLANS. PLEASE SEE LIGHTING
 IN STAIRS, TYPE OF FIXTURE COULD NOT BE
 FOUND AND CORRELATION TO THE SUBMITTED
 FIXTURE SCHEDULE COULD NOT BE DONE.
  
 11)NOTE: PLEASE PROVIDE A NOTE ON ROOF
 PLANS:
 " ALL PROPOSED LIGHTNING PROTECTION
 SYSTEMS SHALL MEET NFPA-780" OR WORDS TO
 THAT AFFECT.
 ** PLEASE KNOW, THERE ARE MANY "LIGHTING PREVENTION
 SYSTEMS" ON THE MARKET WHICH
 ARE NOT ACCEPTABLE IN THIS JURISDICTION
 OR BY NFPA.
  
 12)NOTE: PLEASE SUBMIT A LETTER FROM THE
 FLORIDA POWER AND LIGHT REPRESENTATIVE
 ON THE ACCEPTANCE OF FPL VAULT AS SHOWN.
  
 13)NOTE: PLEASE COMPLETE PLANS WITH ALL
 CIRCUITINGAND CORRELATE WITH SUBMITTED
 PANEL SCHEDULES. REVIEW FOR CODE
 COMPLIANCE CAN NOT BE DONE AT THIS TIME.
 PLEASE BE SURE TO SEE
 210.52B1,210.52D,210.11C3 ETC.
  
 14)NOTE: PLEASE SEE 424.3B WHICH
 REQUIRES OCP FOR AHU/HEAT TO BE SIZED AT
 A MIN OF 125%. PLEASE SEE SOME OCP AS
 INDICATED WILL NEED TO BE ADJUSTED.**
 PLEASE BE SURE TO ADJUST AND CONDUCTOR
 SIZES AS NEEDED. PER 310.16,240.4 ETC
  
 15)NOTE: PLEASE SEE 210.52D,210.11C3 FOR
 BATH RECEPTS. PLEASE SEE SOME UNITS ,
 B2, B1 ETC.
  
 16)NOTE: PLEASE PLACE ALL AREA AND ROOM DESIGNATIONS ON
 PLANS.
 PLEASE SEE PREVIOUS COMMENTS WITH
 RESPECT TO COMPLIANCE WITH CIRCUITING.
  
 17)NOTE: PLEASE INDICATE THE KITCHEN
 CIRCUITS AS SMALL APPLIANCE.
 210.52B
  
 18)NOTE: PLEASE SEE NFPA-72 11.8.3.5,
 11.5.1.1 FOR SMOKE DETECTORS REQUIRED
 INSIDE AND OUTSIDE ALL SLEEPINGRMS.
 PLEASE SEE UNIT D1, PLEASE ALSO SEE
 OTHER UNITS WHERE SD'S DO NOT APPEAR TO
 BE "OUTSIDE" SLEEPING AREAS OR
 CORRIDORS. PLEASE SEE A DOOR SEPARATES
 BEDRM HALLWAYS FROM LIVING/COMMON AREA
 OF UNIT. THIS SEEMS TO SHOW NO SD
 COVERAGE FOR AREAS OUTSIDE BEDROOMS.
 PLEASE FIRE REVIEW COMMENTS.
 ** PLEASE PLACE NOTE ON PLANS WITH
 REFERENCE TO THE MIN PLACEMENT
 REQUIREMENTS OF ABOVE NFPA. PLEASE SEE
 THAT SD'S ARE LOCATED A MIN OF 3' FROM BATH,KITCHEN
 DOORS , 3' FROM SUPPLY
 REGISTERS , ETC :WITH EXCEPTIONS AS
 LISTED FOR LOCATIONS WITHIN 20' OF
 COOKING APPLIANCES.
 ** PLEASE SEE SPECS/LISTING FROM SD
 MANUFACTURE AS MANY REQUIRED SD'S TO BE
 FURTHER THAN LISTED ABOVE AND MOST
 REQUIRED SD'S TO BE 5' FROM THE RETURN
 AIR GRILLE.
 ** PLEASE KNOW, ANY CEILING HEIGHT
 VARIATIONS MAY CHANGE LOCATION OF SD'S,
 AS THEY ARE REQUIRED TO BE LOCATED
 WITHIN 12" OF THE HIGHEST POINT OF A
 FLAT CEILING.
  
 19)NOTE: PLEASE SHOW AND LABEL ALL
 PANELS, ELECTRICAL AND PANELS WHICH
 APPEAR TO BE LOW VOLTAGE?
 PLEASE KNOW, ANY PLUG-IN TYPE
 TRANSFORMERS MAY NOT BE LOCATED IN CLOSE
 PROXIMITY OF EASILY IGNITABLE MATERIALS
 IN CLOTHES CLOSETS.
 PLEASE KNOWIN MANY LOCAL JURISDICTIONS
 AS A RESULT OF THE HEATING OF THESE TYPE TRANSFORMER A
 FIRE HAS OCCURRED. IN THE
 INTEREST OF LIFE SAFETY AND PROPERTY
 PLEASE ADJUST LOCATIONS.
 110.26,240.24D, 408.7 ETC.
 PLEASE ALSO SEE UNIT(S) WHICH INDICATE A
 PANEL OF SOME SORT "INSIDE " THE BATHTUB
 LOCATION. PLEASE SEE 240.24 FOR
 PERMITTEDLOCATIONS OF PANELS.
 PLEASE SEE REDLINED PLANS.
 PLEASE SEE UNIT "G" FOR WHAT APPEARS TO
 BE TWO PANELS?
 PLEASE SEE D2, PLEASE SEE A1, PANEL NOT
 LOCATED ON WALL, SEE P3, P2 MISSING
 PANEL.
 PLEASE VERIFY ALL OF THE ABOVE AS MANY
 OF THESE HAVE BEEN REDLINED ON ONE SET
 OF PLANS.
  
 20)NOTE: PLEASE SEE 210.52 FOR MISSING
 RECEPTS FOR 2',6'AND 12 RULE. PLEASE SEE
 SOME MISSING FOR 2' OF WALL SPACE.
  
 21)NOTE: PLEASE SEE 210.52C2, 210.8A16
 FOR WHAT APPEARS TO BE SHOWN AS AN
 ISLAND KITCHEN. B2
  
 22)NOTE: PLEASE SEE SEE UNIT UNIT A-2
 LAYOUT OF WALLS AND DOORS.PLEASE SEE
 AREA WHERE THERE SEEMS TO BE A ROOM?
  
 23)NOTE: PLEASE CORRELATE ELECTRICAL
 ROOMS AND RISER DIAGRAM. PLEASE SEE E4.0
 SHOWS ELECTRICAL RM ON EVERY FLR,
 HOWEVER RISER DOES NOT.
 PLEASE SEE OTHER COMMENTS WITH RESPECT
 TO ELECTRICAL RMS.
 215.5
  
 24)NOTE: PLEASE PROVIDE A CURB DETAIL
 FOR FLR PENETRATIONS OF BUS-DUCT PER
 368.6 WHERE A VERTICAL RISER PENETRATES
 TWO OR MORE DRY FLOORS, A MINIMUM 100 MM
 (4 IN.) HIGH CURB SHALL BE INSTALLED
 AROUND ALL FLOOR OPENINGS FOR RISER
 BUSWAYS TO PREVENT LIQUIDS FROM ENTERING
 THE OPENING. THE CURB SHALL BE INSTALLED
 WITHIN 300 MM (12 IN.) OF THE FLOOR
 OPENING. ELECTRICAL EQUIPMENT SHALL BE
 LOCATED SO THAT IT WILL NOT BE DAMAGED
 BY LIQUIDS THAT ARE RETAINED BY THE
 CURB.
  
 25)NOTE: PLEASE CORRELATE MAIN
 ELECTRICAL ROOM EQUIPMENT WITH RISER
 DIAGRAM. PLEASE SEE ONE SHOWS 3000A
 MAIN, THEOTHER 4000A, PLEASE SEE
 ELECTRICAL PANELSSHOWN ON 4.00 ALSO DO
 NOT CORRELATE WITH RISER.
 PLEASE SEE MANY OF THESE ITEMS/LOCATIONS
 WERE REDLINED ON ONE SET.
  
 26)NOTE: PLEASE SEE METER CENTERS ON
 ELECTRICAL ROOMS SHOWN ON E4.00 DO NOT
 CORRESPOND TO THE METER CENTERS ON 5.02
 215.5
  
 27)NOTE: PLEASE SEE METER CENTER(S),
 PLEASE SEE THERE ARE MANY UNIT
 IDENTIFICATIONS WHICH DO NOT CORRELATE
 TO THE UNITS ON PLANS.
 PLEASE SEE UNITS TYPES ON RISER.
 215.5
  
 28)NOTE: PLEASE SEE RISER WHICH
 INDICATES THE ELEVATOR'S ELECTRICAL
 EQUIPMENT LOCATED ON FIRST FLR, HOWEVER
 PLEASE SEE PLANS FOR ROOF AS ELEVATOR
 EQUIPMENT ROOM IS SHOWN AT THAT
 LOCATION. PLEASE CORRELATE.
 215.5
  
 29)NOTE: PLEASE PROVIDE OCP LOCATED AT
 GENERATOR WHICH IS PART OF THE PHASE 1
 HIGH-RISE BLDG.
 PLEASE SEE EQUIPMENT SPECS INDICATE THE
 GEN AT 1000KW.
 215.5
  
 30)NOTE: PLEASE PROVIDE A MEANS OF
 DISCONNECT FOR THE FEEDERS COMING FROM
 GEN.225.31-225.39
 PLEASE SEE A MAIN CIRCUIT BRKR LOCATED
 IN EDPH2 WOULD BE ACCEPTABLE.
 SHALL ALSO REQUIRE SIGNAGE.
 230.2E,700.8 ETC.
  
 31)NOTE: PLEASE SEE PANEL "GH" AS SHOWN
 ON RISER WHICH IS SHOWN FROM ANOTHER
 BLDG AND ANOTHER SERVICE, MAY NOT BE
 LOCATED IN THIS BLDG.230.3
 *****PLEASE KNOW AS CONDITION SET FORTH
 BY THE DESIGN TEAM ON PHASE ONE, A
 COMPLETE SEPARATION OF ALL ELECTRICAL
 SYSTEMS WILL TAKE PLACE AND A COMPLETE 4
 HR SEPARATION WILL BE PROVIDED BETWEEN
 PARKING GARAGE AND PHASE II HIGH RISER
 BLDG. PLANS DO NOT SEEM TO CORRELATE
 WITH THIS. PLEASE KNOW, GARAGE IS NOW
 SHOWING ELECTRICAL DEVICES/SYSTEMS FED
 FROM TWO SEPARATE SERVICES WHICH WILL
 NOT BE PERMIT. A DEFINITIVE SEPARATION
 WILL BE PROVIDE AND CROSSING OVER OF
 SYSTEMS WILL NOT BE ACCEPTABLE.
 230.2,230.3 ETC, 90.4
  
 32)NOTE: PLEASE PLACE NOT ON PLANS AS NO
 EQUIPMENT GROUNDING CONDUCTORS MAY BE
 ALUMINUM, AND NO FEEDERS SMALLER THAN
 #2. PER CITY OF WEST PALM BEACH LOCAL
 AMENDMENTS TO THE 2001 FBC.250.62,310.2
  
 33)NOTE: PLEASE PLACE NOTE ON PLANS FOR
 COLOR CODING OF 277/480V SYSTEMS PER
 LOCAL AMENDMENTS, 215.2
 BROWN, PURPLE, YELLOW.
 ** PLEASE KNOW SPECIFIC COLOR CODING PER
 277/480V IS NOT PROVIDED IN THE NEC AND
 ONLY A "HIGH-LEG" SHALL HAVE "ORANGE" AS
 THE COLOR.
  
 34)NOTE: PLEASE PROVIDE A COMPLETE
 GROUNDING ELECTRODE RISER IN BLDG AND
 PROVIDE THIS LINE DIAGRAM ON ELECTRICAL
 RISER. THIS SHOULD INCLUDE ALL GROUNDING
 FOR TRANSFORMER(S)/SEPARATELY DERIVED SYSTEMS.250.58
  
 35)NOTE: PLEASE INDICATE THE ATTACHMENT
 FOR TRANSFORMERS AS SHOWN AS REQUIRED
 PER ABOVE NOTE #34 AND 250.30, 250.66
  
 36)NOTE: PLEASE SEE NO LOAD CALCULATIONS
 WERE SUBMITTED FOR MAINS, SERVICES,
 METER CENTERS ETC. MC1?
 PLEASE SEE SOME CONNECTED LOADS DO NOT
 INDICATE LOADS AND HOW THEY WERE
 DERIVED.?
 PLEASE KNOW VERIFICATION OF CODE
 COMPLIANCE FOR SERVICE SIZES, FEEDERS,
 SEC'S ETC CAN NOT BE VERIFIED OR
 REVIEWED AT THIS TIME.
 310.16.240.4,220, 215.5
 PLEASE BE SURE ALL CONTINUOUS LOADS ARE
 SHOWN AND FIGURED AT 125%,
 215.3,230.42 ETC.
  
 37)NOTE: PLEASE VERIFY AND SUBMIT SPECS
 FO BUS-DUCT AS LOCAL AMENDMENT DOES NOT
 PERMIT ALUM AS THE EQUIPMENT GROUNDING
 METHOD. 250.62 SEE PREVIOUS NOTES.
  
 38)NOTE: PLEASE SEE SPEC BOOKS SUBMITTED
 ARE FOR EQUIPMENT AND SPEC BOOK FOR
 JOB-SITE WAS NOT SUBMITTED AT THIS TIME.
 PLEASE SEE SOME OF THE ABOVE COMMENTS
 WHICH MAY AFFECT PAGES IN THE JOB-SITE
 SPEC BOOKS. THESE SHOULD BE REVIEWED AND
 MAKE ANY CHANGES AS NEEDED.
  
 39)NOTE: PLEASE SEE 230.95,240.13 WHICH
 REQUIRES GROUND FAULT PROTECTION FOR
 SYSTEMS WITH A VOLTAGE MORE THEN 150V TO
 GRND AND OVER 1000A'S.
 PLEASE SEE "MSBH2.
  
 40)NOTE: PLEASE VERIFY SIZING OF
 EMERGENCY DISTRIBUTION SYSTEM AS ONE
 SHEET SHOWS 800A ATS AND SPECS FOR ATS
 INDICATE THIS AS 1000A'S?
 PLEASE SEE NOTE BELOW AS PANEL
 SCHEDULES ALSO INDICATE 1000A'S.
 PLEASE KNOW, IF 1000A'S, GFP SENSING
 WILL BE REQUIRED ON SECONDARY SIDE,GFP
 WILL BE REQUIRED ON MAIN ALSO AS NOTED
 PER 240.13,230.95.
 PLEASE SEE 700.7D, 700.26, 701.9D
 PLEASE SEE TEXT TAKEN DIRECTLY FROM ASCO
 AS A 4-POLE ATS MAY BE REQUIRED FOR THE
 CORRECT COORDINATION OF ELECTRICAL
 SYSTEMS.
 "WHERE GROUND FAULTPROTECTION IS
 TRIGGERED BY THE CODE AND AN ALTERNATE
 POWER SUPPLY IS INCLUDED,SWITCHING OF
 THE NEUTRAL BECOMES NECESSARY. THE
 CIRCUIT SHOWN ABOVE ILLUSTRATESSUCH A CIRCUMSTANCE.
 THE SERVICE IS LARGER THAN
 1,000 AMPS. CONSEQUENTLY, GROUNDFAULT
 PROTECTION IS REQUIRED AT THE MAIN
 SERVICE DISCONNECT AT A MINIMUM. IF IT
 IS INSTALLED THERE AND THE GENERATOR
 NEUTRAL GROUNDING WAS THROUGH A SOLID
 CONNECTION TO THE MAIN SERVICE NEUTRAL,
 A GROUND FAULT WHEN THE GENERATOR IS
 FEEDING THE LOAD WILL CAUSE THE MAIN
 SERVICE DISCONNECT TO OPEN. THIS WILL
 NOTDISCONNECT THE ARCING FAULT FROM
 THE GENERATOR. COORDINATION IS THUS
 LOST."
 PLEASE VERIFY AS SYSTEM IN EXISTING BLDG
 ONE MAY BE A SEPARATELY DERIVED
 GENERATOR AND SEEING HOW BOTH BLDGS EM
 POWER IS COMING FROM THE SAME GENERATOR,
 A 4-POLE SWITCH MAY BE REQUIRED. PLEASE
 ALSO KNOW, BOTH OF THESE MAIN
 DISTRIBUTION SYSTEMS ARE COMING FROM TWO
 SEPARATE FPL VAULTS AND TRANSFORMERS.
  
 41)NOTE: PLEASE SEE MISSING FIRE PUMP
 AND EQUIPMENT NOT INDICATED ON RISER
 DIAGRAM.
 PLEASE SEE 695.4B1 FOR OCP REQUIRED FOR
 LOCKED ROTOR. PLEASE ALSO SEE NFPA-20
 FOR ELECTRICAL REQUIREMENTS FOR MEANS-OF
 DISCONNECT, LOCATION ETC. PLEASE SEE
 SPECS SUBMITTED APPEAR TO SHOW THIS ,
 HOWEVER NONE OF THESE ITEMS ARE SHOWN ON
 RISER. UNABLE TO VERIFY CODE COMPLIANCE
 FOR FIRE PUMP, FIRE PUMP CONTROLLER,
 FEEDERS, SEC'S ETC.
 ** PLEASE SEE SPECS WHICH CONTAIN THE
 TITLE FROM STEVEN FELLER'S OFFICE
 INDICATE THE PUMP AS 277/480V, 125HP.
 215.5
  
 42)NOTE: PLEASE CORRELATE ALL
 TRANSFORMERS WITH SCHEDULE(S). PLEASE
 SEE 112.5?, 150? KVA
 PLEASE ALSO CONFIRM KVA AS MAX OCP FOR
 TRANSFORMER MAY NOT EXCEED 125% AS 450.3
 TABLES.
 215.5
  
 43)NOTE: PLEASE COMPLETE BUS-DUCT RISER
 AND METER CENTERS AS PLANS ONLY INDICATE
 THESE THOUGH FLOOR (8).??
 PLEASE SEE MISSING METER CENTER / MAIN
 DISCONNECT ON 3RD FLR, HOWEVER ONE IS
 SHOWN ON 4.00 PLANS FOR ELECTRICAL RMS.
 ALSO NOTED ABOVE FOR CORRELATION OF ALL
 RMS WITH RISER.
 215.5
  
 44)NOTE: PLEASE PROVIDE THE COMPLETE
 GROUNDING ELECTRODE SYSTEMS DETAIL PER
 250.50, 250.104, 250.64,,,
  
 45)NOTE: PLEASE SEE EDPH2 IS SHOWN AS
 1000A'S ON PANEL SCHEDULES AND SHOWN AS
 800A ON RISER ?? PLEASE CORRELATE.
 215.5
  
 46)NOTE: PLEASE SEE "MSBE2" AS THIS IS
 ALSO SHOWN AS 1000A'S ON PANEL
 SCHEDULE(S), HOWEVER SHOWN AS 800A'S ON
 RISER. PLEASE VERIFY AS 1000A'S OR MORE
 277/480V WILL ALSO REQUIRE GFP ON EM
 MAIN.
 230.95,240.13 ETC
  
 47)NOTE: PLEASE SEE PANEL "SL" IS SHOWN
 AS HAVING "SITE LIGHTING" HOWEVER, SITE
 LIGHTING COULD NOT BE LOCATED ON
 ELECTRICAL PLANS?
 IF SITE LIGHTING CONTAINS LT POLES,
 PLEASE SUBMIT WIND LOAD CALCULATIONS
 FOR FBC 140MPH. THESE WILL BE REVIEWED
 BY A STRUCTURAL REVIEWER. ** PLEASE BE
 SHOULD POLE CONTAIN FIXTURES FOR
 CALCULATION PURPOSES.
  
 48)NOTE: PLEASE VERIFY OCP FOR LARGER
 A/C SYSTEMS SHOWN ON PANEL SCHEDULES,
 PLEASE SEE 424.3B AS NOTED ABOVE FOR MIN
 OCP OF 125%.ADJUST WHERE NEEDED.
 RTU#1, #2, #3. PLEASE ALSO ADJUST AWG AS
 NEEDED.310.16,240.4
  
 49)NOTE: PLEASE LABEL ALL TRANSFORMERS
 ON RISER AS INDICATED ON PANEL
 SCHEDULES.
 215.5
  
 50)NOTE: PLEASE VERIFY THE USE OF WHAT
 APPEARS TO BE TANDEM BRKRS IN PANELS IN
 THIS NEW CONSTRUCTION PROJECT??
 THIS IS ONLY A NOTE.
  
 51)NOTE: PLEASE PROVIDE A DISCONNECT
 DETAIL INCLUDING SIZE ETC FOR ROOF TOP
 UNITS. THIS MAY BE A "TYPICAL" DETAIL
 FOR EACH SIZE IF NOT ALL THE SAME.
 215.5,440.11
  
 52)NOTE: PLEASE SEE A BATTERY BACK UP LT
 FIXTURE WILL BE REQUIRED IN THE MAIN
 ELECTRICAL RM(S), PUMP RMS, FIRE COMMAND
 RM, ELEVATOR EQUIPMENT RMS.
 700.16,700.12E,
  
 53)NOTE: PLEASE SEE FAIR HOUSING ACT
 REGULATIONS, 24 CFR 100.205 WITH RESPECT
 TO THE LOCATIONS OF "ALL" ELECTRICAL
 DEVICES, CONTROLS.
 A NOTE IS LOCATED ON "GEN NOTES" WHICH
 MENTIONS THE HEIGHTS FO RECEPTS AND
 SWITCHES, HOWEVER THIS SHOULD REFLECT
 FHAR ETC AS NOTED ABOVE.
  
 54)NOTE: PLEASE SEE THE AMENITY DECK
 DETAILS COULD NOT BE LOCATED IN SETS.
 PLEASE SEE E2.06 WHICH ONLY SEEMS TO
 INDICATE A PARTIAL AREA SHOWN.
 PLEASE SEE NO ELECTRICAL SHOWN FOR
 LIGHTING ETC?
 PLEASE SEE LS 101 7.8 AND 7.9 WHICH
 REQUIRES MEANS OF EGRESS LIGHTING TO THE
 PUBLIC RIGHT OF WAY.; THIS WOULD INCLUDE
 EMERGENCY LIGHTING AS REQUIRED.
 PLANS NOW SHOW A SEPARATE PHASE LINE, AS
 GARAGE WAS TO BE BUILT WITH PHASE ONE
 BLDG AND DID NOT SHOW GARAGE WITH PHASE
 LINE DOWN THE CENTER OF THE GARAGE.
  
 ** NOTE: PLEASE SEE MANY OF THE ABOVE
 ITEMS WERE REDLINED ON ONE SET FOR AREAS
 OF NOTES ABOVE.
  
 ** NOTE: PLEASE SEE POSSIBLE NOTES FROM
 OTHER REVIEWER(S) WHICH MAY AFFECT
 ELECTRICAL PLANS AND DESIGN.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW ONCE ALL REVIEWS ARE COMPLETED.
 IF THERE ARE NAY QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  
  
  
  
  
2006-01-26 00:00:00IN PROGRESS
2006-01-25 00:00:00REVIEW STARTED, IN PROGRESS.
 PLANS REVIEW STOPPED. NOTES TO FOLLOW,
 AS REVIEW IS NOT COMPLETE.
2006-01-24 00:00:00 
  
 I ROLL OF MEP'S AND I SUBMITTAL BOOK IN
 ELECTRICAL FOR REVIEW.