| 2005-11-14 00:00:00 | MECHANICAL PERMIT NOT BEING APPLIED FOR |
| | AT THIS TIME. PLEASE NOTE THE FOLLOWING |
| | REGUARDING YOUR MECHANICAL PLANS. |
| | AHU #1 ( 1ST. FLOOR ) |
| | 1) NEED TO SHOW RETURN AIR DUCT SIZE. |
| | 2) TRANSFER DUCT IN STUDY MUST BE 1 1/2 |
| | TIMES LARGER THAN SUPPLY AIR DUCT (8" |
| | SUPPLY AIR DUCT REQUIRES A 10" RETURN |
| | AIR TRANSFER DUCT). PER 2004 FBC/R |
| | M1602.4 . |
| | 3)RAG IN MASTER VESTIBULE IS TO SMALL, |
| | TRANSFER GRILLS MUST BE 50 SQ. IN. PER |
| | 100 CFM'S (300 SQ. IN.). PER FBC/R |
| | M1602.4 . |
| | 4) COMBUSTION AIR LOUVERS, PLEASE SEE |
| | 2004 FBC/R M1701.5 . |
| | 5) WILL NEED DETAILED MANUFACTURE'S |
| | SPECIFICATION'S ON GAS FIREPLACE AND |
| | COMBUSTION AIR CALCULATIONS. |
| | 6) WILL NEED DETAILED MANUFACTURE'S |
| | SPECIFICATION'S ON GAS BBQ UNDER COVERED |
| | LOGGIA, OR AN APPROVED HOOD. |
| | 7) PLANS CALL FOR 109,400 TOTAL BTU'S |
| | ENERGY CALCULATIONS CALL FOR 68,000 |
| | BTU,S THE TO MUST COINCIDE. |
| | 8) PLEASE ADDRESS GENERATOR EXHUST. |
| | 9) WILL NEED DETAILED MANUFACTURE'S |
| | SPECIFICATION'S AND INSTALLATION |
| | INSTRUCTIONS ON GENERATOR. |
| | AHU #2 (2ND. FLOOR) |
| | 10) RAG IN BEDROOM #5 NOT SIZED. |
| | 11) TRANSFER DUCT IN BEDROOM #3 & 4 NEED |
| | TO BE 10" . |
| | 12) TRANSFER DUCT IN BEDROOM # 2 NOT |
| | SIZED. |
| | 13) RETURN AIR DUCT FROM 24X24 RAG TO |
| | AHU #2 NOT SIZED. |
| | IF YOU HAVE ANY QUESTIONS PLEASE CALL |
| | TOM GORDON 805-6729 OR PATTY KRAUSS |