| 2006-06-09 00:00:00 | ****UNSAT **** |
| | |
| | ** PLEASE KNOW, ANY WORK DONE UNDER |
| | EARLY WORK RELEASE WAS AT CONTRACTORS |
| | RISK AND ANY CHANGES WILL BE THE |
| | RESPONSIBILTY OF THE CONTRACTORS ETC. |
| | PLEASE SEE NOTES BELOW AS COMMENTS WITH |
| | RESPECT THE 2004 FBC CHAPTER 13. |
| | |
| | PLEASE SEE THE OLD PLANS SUBMITTED BACK |
| | FOR REFERENCE FOR THIS PROJECT WERE FROM |
| | THE 1661 WORTHINGTON SITE AND OLD PLANS |
| | CAN NOT BE VERIFIED AT THIS TIME. |
| | |
| | 1) NOTE: PLEASE SEE REQUIREMENTS FOR FBC |
| | CHAPTER 13 ARE REQUIRED TO BE MET FOR |
| | ALL LIGHTING. |
| | 13-415.1.ABC.1.1, 13-415.1.ABC.1.2 ETC |
| | PLEASE CLARIFY AS SOME OF THIS IS BEING |
| | SHOWN, BUT UNCLEAR AS MANY LIGHTING |
| | CIRCUITS DO NOT INDICATE ANY CONTROL? |
| | PLEASE ALSO SEE THE OVER RIDE SWITCHES |
| | MUST STATE A MAXIMUM OF 4HRS AND A MAX |
| | OF 30 MINS FOR MOTION SENSORS. |
| | PLEASE SEE THE OVER RIDING SWITCHES |
| | SHALL BE LOCATED IN THE AREAS FO |
| | LIGHTING WHICH CAN BE SEEN BY THE |
| | OCCUPANT. |
| | PLEASE SHOW LOCATIONS OF ALL OVER RIDES |
| | AND OCC SENSORS. |
| | ** PLEASE SEE A WORST CASE SCENARIO |
| | SHALL BE SHOWN FOR VOLTAGE DROP PER 13-413.1.ABC.1 |
| | **PLEASE ALSO SEE 13-415.1.ABC.1.3 FOR |
| | OTHER LIGHTING IN AREAS. |
| | ** PLEASE SEE CALCS FOR 13-415.1.AB.1 |
| | |
| | 2) NOTE: PLEASE SEE RISER SEEMS TO SHOW |
| | NEW FEEDERS FROM GUTTER TO METER ON THE |
| | EXISTING RISER AND THE NEW RISER SEEMS |
| | TO INDICATE EXISTING FEEDERS ?? |
| | SEEMS TO BE A MISPRINT? |
| | 215.5 |
| | |
| | 3) NOTE: PLEASE CLARIFY IT ROOM AND |
| | PLEASE SEE PART WALLS THAT DO NOT SEEM |
| | TO INDICATE THE 1 HR RATING ALL THE WAY |
| | AROUND? THIS SHOULD BE IN BUILDING |
| | REVIEW COMMENTS ALSO. |
| | PLEASE SEE NEC 645 FOR MEANS OF |
| | DISCONNECTS AND DETECTION SYSTEMS WHICH |
| | NEED TO BE SHOWN FOR THE IT ROOM. |
| | PLEASE INDICATE THE SHUT OFF DEVICE AND |
| | SHUT OFF FOR AHU. |
| | PLEASE INDICATE ANY RAISED FLR AND SD'S |
| | ABOVE AND BELOW. |
| | PLEASE SEE NFPA-75 , CHAPTER 6 ETC. |
| | |
| | 4) NOTE: PLEASE CLARIFY EXISTING |
| | TRANSFORMER ON RISER AND THE LOCATION OF |
| | THIS TRANSFORMER. IT IS IN THE MAIN |
| | ELECTRICAL ROOM ? AS PLANS DO NOT SHOW. |
| | PLEASE SEE 450.13B, 450.21 |
| | IF IN THE MAIN ELECTRICAL ROOM THIS |
| | SHOULD BE OK. |
| | |
| | 5) NOTE: PLEASE SUBMIT THE SPECS ON THE |
| | WATT STOPPER EQUIPMENT WHICH WILL BE |
| | INSTALLED. |
| | |
| | IF THERE ARE ANY QUESTIONS, PLEASE CALL. |
| | |
| | DEWEY PALMER |