| 2006-01-18 00:00:00 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | |
| | A. PLANS TO BE DESIGNED & REVIEWED PER |
| | THE FBC-2004 EDITION. PLEASE INDICATE ON |
| | PLANS. |
| | 1. SHTS S-7, S-8, S-9 ROOF CALCULATIONS |
| | ARE NOT CLEAR AND CAN NOT BE VERIFIED. |
| | INDICAE THE SQUARE FEET OF EACH BAY ROOF |
| | AREA, SHOW 1/2 AREA OF THE VERTICAL |
| | WALLS INCLUDING PARAPETS ADDED TO EACH |
| | AREA. THE ROOF INDICATES SLOPE ON SOME |
| | BAYS, BUT NOT ALL. INDICATE SLOPE OF |
| | EACH BAY. SOME BAYS SHOW DRAINS ON |
| | EITHER SIDE OF THE BUILDING SO PLEASE |
| | INDICATE IF THE ROOF SLOPES TO EITHER |
| | SIDE OF THE BUILDING. IF SO PLEASE SHOW |
| | THE HIGH SPOT OF THE ROOF AND INDICATE |
| | THE SQUARE FOOTAGE DRAINING TO EACH |
| | DRAIN. NOTE INDICATES GUTTERS, BUT |
| | GUTTERS ARE NOT SHOWN ON THE ROOF PLANS |
| | NOR ARE THEY SHOWN ON THE BUILDING |
| | ELEVATIONS. CALCULATIONS INDICATE 6" |
| | GUTTERS & 7" DOWNSPOUTS, BUT ROOF PLAN |
| | SHOWS NO GUTTERS AND 5" CAST IRON |
| | DOWNSPOUTS AND ALSO 5" PVC DOWNSPOUTS. |
| | PLEASE CLARIFY. - GUTTER SIZING |
| | CALCULATIONS ONLY POINT TO BAYS 5, 14, |
| | 20 & 28. WHAT ARE THE CALCULATIONS FOR |
| | THE OTHER BAYS? PLEASE CLARIFY. NO BAYS |
| | SHOWN FOR BUILDING 3. - NO SECONDARY |
| | ROOF DRAINS OR SCUPPERS ARE SHOWN. |
| | PLEASE CLARIFY. SECTIONS 106.1.1, 1106 & |
| | 1107. |
| | 2. SHTS A-4, A-5, & A-6, INDICATE THE |
| | ELEVATION OF THE ROOF LEVEL. THE TOP OF |
| | THE PARAPET FOR EAST ELEVATIONS |
| | BUILDINGS 1 & 2 AND WEST ELEVATION DOES |
| | NOT INDICATE THE HEIGHT OF THE HIGH |
| | PARAPET SECTIONS.- NO GUTTERS SHOWN. |
| | SECTION 106.1.1. |
| | 3. SHT A-7 DETAIL "A" SHOW THE FLUSH |
| | CONTROLS. 11-4.16.5 FOR THE W/C AND |
| | FAUCET TYPE 11-4.19.5 FOR THE LAV. |
| | 4. SHT P-1 PLUMBING RISER FOR BUILDING 1 |
| | DOES NOT REFLECT THE FLOOR PLAN. |
| | BUILDING 1 SHOWS 12 BAYS ON SHT A-1, BUT |
| | RISER DIAGRAM SHOWS ONLY 10 BAYS. BAYS |
| | 1, 3, 5, 7, & 10 STACK IS SHOWN ON THE |
| | OPPOSITE SIDE OF THE TOILET ROOM THAN |
| | THE LAV & L/T. SHOW ALL PIPE SIZES, SHOW |
| | THE LAV STACKS VENTING THE W/C'S. - L/T |
| | SHALL NOT DRAIN THROUGH THE WET VENT OF |
| | THE BATHROOM FIXTURES, BUT SHALL CONNECT |
| | DOWNSTREAM OF THE BATHROOM GROUP. |
| | SECTION 909.1. (SEE RED LINE EXAMPLE ONE |
| | SET OF PLANS). |
| | 5. SHT P-1 PLUMBING RISER DIAGRAM FOR |
| | BUILDING 2 DOES NOT REFLECT THE FLOOR |
| | PLAN. (SEE PREVIOUS COMMENT AND ADJUST |
| | RISER TO FLOOR PLAN AND PIPE PER CODE. |
| | SECTIONS 106.1.1 & 909.1. |
| | 6. SHT P-1 PLUMBING RISER DIAGRAM FOR |
| | BUILDING 3 DOES NOT REFLECT THE FLOOR |
| | PLAN. (SEE COMMENT #4 AND ADJUST RISER |
| | TO REFLECT THE FLOOR PLAN, AND PIPE PER |
| | CODE. SECTIONS 106.1.1 & 909.1. |
| | 7. SHT P-1 TYPICAL COLD RISER DOES NOT |
| | REFLECT THE FLOOR PLANS. SUBMIT A WATER |
| | RISER DIAGRAM FOR EACH BUILDING THAT |
| | REFLECT THE FLOOR PLAN OF THAT BUILDING. |
| | SHOW ALL PIPE SIZES, VALVES, INDICATE |
| | BAY NUMBER, INDICATE PIPING MATERIAL. |
| | INDICATE IF WATER IS UNDERGROUND OR |
| | ABOVE GROUND. - AN RPZV BACKFLOW IS |
| | REQUIRED FOR EACH BUILDING. SECTIONS |
| | 106.1.1, 606.1, 606.2, 608.13.2. |
| | 8. SUBMIT A HORIZONTAL PIPING LAYOUT |
| | FLOOR PLAN SHEET FOR EACH BUILDING |
| | SHOWING ALL PIPE SIZES. SECTION |
| | 106.3.5.1.3(3)(4)(8)(9)(10) - SHOW WHERE |
| | THE SANT., STORM EXIT THE BUILDING AND |
| | WHERE THE WATER ENTERS THE BUILDING. - |
| | SUBMIT A STORM BUILDING DRAIN ISOMETRIC |
| | AND STORM RISER DIAGRAM. SHOW ALL PIPE |
| | SIZES, OFFSETS SQUARE FOOTAGE OF EACH |
| | RISER AND SHOW SQUARE FOOTAGE AS IT |
| | ACCUMULATES IN THE SYSTEM. INDICATE THE |
| | TERMINATION POINT OF STORM SYSTEM. |
| | SECTION 106.3.5.1.3. |
| | |