| 2005-11-22 00:00:00 | DENIED:BUILDING #14 |
| | 1.PLAN SHEET A-0.0.0 PROJECT |
| | INFORMATION INDICATES TYPE VI, |
| | UNPROTECTED SPRINKLERED.PLEASE |
| | INDICATE WHICH SPRINKLERED SYSTEM WILL |
| | BE UTILIZED - (13, 13R, 13D, ETC). |
| | PLEASE NOTE ADDITIONAL COMMENTS MAY BE |
| | GENERATED BY THE RESPONSES GIVEN. |
| | |
| | 2.PLEASE CLARIFY DUCT PENETRATION |
| | THROUGH THE SEPARATION WALL BETWEEN THE |
| | GARAGE & THE RESIDENCE.PLAN SHEET |
| | A-4.0.2 & A-10.0.0, INDICATES THIS |
| | SEPARATION AS 1 HR.PLAN M1 ONLY |
| | INDICATES A FIRE DAMPER AT THE CEILING |
| | PENETRATION.DUCTS LESS THAN 100 SQ |
| | INCHES SHALL COMPLY WITH 2001 FMC |
| | 607.1.3 #3 ITEMS 1 THROUGH 4. |
| | |
| | 3.PLAN SHEET M2 DRYER EXHAUST EXCEEDS |
| | 25FT REQUIREMENT WITH REDEUCTIONS FOR |
| | 90'S PER 2001 FMC 504.6.PLAN SHEET |
| | E2.2.4 INDICATES "BF" (BOOSTER FAN?). |
| | PLEASE NOTE, INSTALLATION OF BOOSTER |
| | FANS WILL BE REVIEWED BY THE BUILDING |
| | OFFICIAL UNDER "ALTERNATE MATERIALS & |
| | MEDTHODS" 2001 FMC 103.7.1.PLEASE |
| | PROVIDE THE DFOLLOWING INFORMATION FOR |
| | REVIEW:1) A LETTER FROM AN ENGINEER |
| | EMPLOYED BY THE DRYER MANUFACTURER |
| | STATING THE INSTALLLATION OF THE DRYER |
| | BOOSTER FAN IS ACCEPTABLE & WILL NOT |
| | VOID THE WARRANTY OF THE DRYER. 2) MEANS |
| | OF NOTIFYING THE OWNER SHOULD THE |
| | BOOSTER FAN FAIL.3) MANUFACTURER'S |
| | SUBMITTAL & INSTALLATION DATA FOR THE |
| | BOOSTER FANS.4) PROVIDE ALL PERTINENT |
| | INFORMATION FOR ALL TRADES MECHANICAL, |
| | ELECTRICAL, FIRE, ETC. |
| | |
| | 4.PLAN SHEET M2 THE O.A. INTAKE IS |
| | WITHIN 10 FT OF THE TOILET & DRYER |
| | EXHAUST TERMINATIONS.EXHAUST |
| | CONTAMINANTES SHALL NOT BE RECIRCULATED |
| | PER 2001 FMC 501.3. |
| | |
| | 5.PLEASE PROVIDE OUTSIDE CALCULATIONS |
| | IN ACCORDANCE WITH 2001 FMC TABLE 403.3. |
| | |
| | 6.PLEASE NOTE RETURN AIR TRANSFER |
| | GRILLES ARE NOT SIZED PROPERLY, SEE 2001 |
| | FMC 601.4 EXCEPTION 2 & 3.PLEASE SIZE |
| | TRANSFER GRILLES ACCORDINGLY. |
| | |
| | 7.PLEASE PROVIDE DETAIL FOR THE AHU |
| | LOCATED IN THE CLOSET.PLEASE NOTE, |
| | MECHANICAL CLOSET SHALL BE CONSTRUCTED |
| | PER 2001 FMC 603.9 & 610.1.ABC.3.7 OF |
| | CHAPTER 13 OF THE 2001 FBC. |
| | |
| | 8.NO COMBUSTIBLES ALLOWED IN THE |
| | MECHANICAL CLOSET PER 2001 FMC 602.2.1. |
| | |
| | 9.CONDENSATE DRAIN SHALL TERMINTE A |
| | MINIMUM OF 12" FROM THE BUILDING |
| | STRUCTURE PER 2001 FBC 1503.4.4. |
| | |
| | 10. AUXILIARY DRAIN PAN WITH OVERFLOW |
| | PROTECTION REQUIRED PER 2001 FMC |
| | 307.2.3. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |