| Date |
Text |
| 2006-06-28 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 BUILDING |
| | FBC-2001 CHAPTER 1 |
| | FBC-2001 CHAPTER 11 |
| | FHA-98 DESIGN MANUAL |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | WPB CITY CODE |
| | |
| | FROM PREVIOUS REVIEW. COMMENT NUMBER |
| | SHALL REMAIN THE SAME AS FIRST REVIEW: |
| | |
| | 4. SHTS A-1.7, A-1.8, A-2.6.1 THRU |
| | A-2.6.6, SUBMIT CALCULATIONS FOR PRIMARY |
| | AND SECONDARY ROOF DRAINS FOR ALL ROOFS. |
| | SHOW THE LOCATION OF ALL SECONDARY ROOF |
| | DRAINS FOR ALL ROOFS/DECKS. |
| | ***RESPONSE NOTED, BUT SCUPPER SCHEDULE |
| | CALCULATIONS & ROOF DRAIN SF ARE |
| | DIFFERENT. PLEASE CORRELATE INFORMATION. |
| | SECTION 104.2.1. |
| | 5. ALL UNIT TYPES SHALL COMPLY WITH |
| | FHA-98 DESIGN MANUAL REQUIREMENTS ONE |
| | THRU SEVEN. SUBMIT DETAILS. |
| | ***RESPONSE NOTED, BUT BATH #2 IN UNITS |
| | B-1, C-1, C-2, C-2.1, C-2.2, C-3, C-4, |
| | C-5, C-6, C-7, C-8, & D-1, AS WELL AS |
| | THE M/B OF UNITS C-9 & C-9.1. SHOW THE |
| | OPENING FOR THE W/C'S. OPENINGS SHALL BE |
| | A MINIMUM 33" WIDE WITH THE W/C BEING |
| | 18" OFF THE WALL TO THE CENTERLINE OF |
| | THE FIXTURE & 15" TO ADJACENT FIXTURE OR |
| | VANITY CABINET. W/C'S BETWEEN FIXTURES |
| | SHALL BE 18" OFF ONE FIXTURE AND 15" OFF |
| | THE OTHER WITH A MINIMUM 33" OPENING. |
| | SEE PAGES 7.43, 7.44 & 7.45. - |
| | REINFORCING FOR FOLDING GRAB BARS MUST |
| | BE SUBSTANTIAL BECAUSE OF THEIR |
| | CANTILEVERED DESIGN. 20 GAUGE SHEET |
| | METAL BACKING DOES NOT APPEAR TO BE |
| | SUBSTANTIAL. PLEASE INDICATE WITH |
| | CALCULATIONS HOW THIS WILL BE CONSIDERED |
| | SUBSTANTIAL. (SEE PAGE 28). |
| | |
| | 9. SHTS A-2.7.5 & A-10.1 MORE |
| | INFORMATION IS REQUIRED FOR THE |
| | FOUNTAINS. PLEASE INDICATE IF THERE WILL |
| | BE WATER SUPPLY LINES AND OR DRAINAGE |
| | LINES FOR FOUNTAINS. IF WATER SUPPLY |
| | LINES ARE INSTALLED, BACKFLOW PREVENTION |
| | IS REQUIRED. IF DRAINS ARE INSTALLED, |
| | THEY SHALL CONNECT TO THE SANT. SYSTEM |
| | AND THE OVERFLOW SHALL DRAIN TO STORM. |
| | PLEASE CLARIFY. SECTIONS 104.2.1 & 608. |
| | ***RESPONSE NOTED, BUT NO BACKFLOW |
| | PREVENTORS ARE SHOWN ON PLANS. PLEASE |
| | INDICATE WHERE THESE CAN BE FOUND AS |
| | THERE IS NO WATER RISER DIAGRAM FOR THE |
| | COOLING TOWER WATER. PLEASE SUBMIT A |
| | WATER RISER DIAGRAM SHOWING ALL PIPE |
| | SIZE, VALVES, BACKFLOWS ETC. FOR THE |
| | COOLING TOWER SYSTEM. SECTION 104.3.1.1. |
| | - FOUNTAIN AT PORTE-COCHERE PLAZA TO BE |
| | BY SEPARATE PERMIT, BUT WILL THE DRAIN |
| | LINE, OVERFLOW LINE AND WATER SUPPLY TO |
| | THE FOUNTAIN BE RUN TO FOUNTAIN AT THAT |
| | TIME? SECTION 104.2.1. |
| | |
| | 18. SHT P-4 SUBMIT CALCULATIONS FOR |
| | PRIMARY AND SECONDARY ROOF DRAINS. SHOW |
| | SF OF EACH DRAINED AREA PLUS 1/2 AREA OF |
| | ALL VERTICAL WALLS INCLUDING PARAPETS, |
| | PLUS THE AREA OF ROOFS THAT DRAIN ONTO |
| | THE ROOF/DECK AREA FROM ABOVE. |
| | ***RESPONSE NOTED, BUT P-6 SCUPPER |
| | SCHEDULE CALCULATIONS TOTAL AREA SERVED |
| | BY DRAIN ON SCHEDULE DOES NOT REFLECT |
| | THE TOTAL SHOWN ON SHT P-5 DECK DRAINS & |
| | PLANTER DRAINS. MANY TOTAL AREAS ARE NOT |
| | CORRECT. PLEASE RECHECK THE ADDITION. |
| | SECTION 104.2.1 AND TABLE 1106.3. |
| | |
| | 22. SHT P-7 SUBMIT CALCULATION FOR |
| | PRIMARY AND SECONDARY ROOF DRAINS. (SEE |
| | COMMENT #18). SECTIONS 1106 & 1107. |
| | ***RESPONSE NOTED, BUT SCUPPER SCHEDULE |
| | CALCULATIONS TOTAL AREA SERVED BY DRAIN |
| | DOES NOT REFLECT SF ON ROOF PLAN. PLEASE |
| | CORRELATE INFORMATION. SECTION 104.2.1. |
| | |
| | 33. SHT P-18 RISERS 86, 87, 81, 80 LOWER |
| | OFFSET VENTS REQUIRED. (SHOW AT LOWEST |
| | OFFSET) SECTION 915.3. |
| | ***RESPONSE NOTED, BUT THE LOWER OFFSET |
| | VENTS ARE STILL NOT SHOWN ON RISERS 80, |
| | 81, AND 87A. |
| | |
| | 36. THE FOLLOWING INFORMATION IS |
| | REQUIRED FOR GAS PERMIT APPLICATION: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | ***RESPONSE NOTED, BUT THE ISOMETRIC |
| | INDICATES THE POOL/SPA HEATERS ARE ON |
| | THE 8TH FLOOR, BUT THE FLOOR PLAN SHOWS |
| | THE HEATERS ON THE 9TH FLOOR. PLEASE |
| | CORRELATE RISER WITH FLOOR PLAN. - SOME |
| | CUT SECTIONS SHOW NO LENGTH AS REQUIRED. |
| | SEE FROM THE METER TO THE FIRST RISER, |
| | THE OFFSET ON THE RUN TO THE WATER |
| | HEATERS, AND THE DROP TO THE WATER |
| | HEATERS IS NOT SHOWN. |
| | |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3) |
| | ***RESPONSE NOTED, BUT NOT ALL CUT |
| | SECTIONS ARE GIVEN TO VERIFY DEVELOPED |
| | LENGTH. |
| | |
| | H. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2001 FUEL GAS CODE |
| | SECS. 502 THRU 506. |
| | ***RESPONSE NOTED, BUT NO VENTING |
| | INFORMATION INDICATED. |
| | |
| | I. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2. |
| | ***RESPONSE NOTED, BUT MANUF. |
| | SPECIFICATION SHEETS FOR ALL GAS |
| | EQUIPMENT SHALL BE SUBMITTED FOR REVIEW. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUM- |
| | BER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICA |
| | TION PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. THANK |
| | YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | **************NEW COMMENTS************** |
| | |
| | 1B. SHT A-2.7.5 MORE INFORMATION IS |
| | REQUIRED FOR THE SCUPPERS. SUBMIT A |
| | DETAIL INDICATING WHERE THE SCUPPER WILL |
| | BE PIPED TO. SHOW SCUPPER HEIGHT & |
| | WIDTH, AND INDICATE THE DISTANCE FROM |
| | THE DECK TO THE FLOW LINE. SHOW THE AREA |
| | TO BE DRAINED BY EACH EOS AND INDICATE |
| | THE SQUARE FOOTAGE BEING DRAINED BY EACH |
| | EOS. - INDICATE THE TERMINATION POINT |
| | FOR EACH EOS. SECTION 104.2.1. |
| | |
| | 2B. EMERGENCY OVERFLOW SCUPPERS SHALL BE |
| | LOCATED AS CLOSE AS PRACTICABLE TO THE |
| | REQUIRED VERT LEADERS, AND SHALL BE A |
| | MINIMUM 4" IN HEIGHT. SECTION 1503.4.2. |
| | |
| | 3B. SUBMIT A EMERGENCY OVERFLOW SCUPPER |
| | ISOMETRIC RISER DIAGRAM SHOWING ALL PIPE |
| | SIZES. SECTION 1O3.1.1. |
| | |
| | 3B. SHT P-1 RELIEF VENT REQUIRED FOR |
| | AAV'S, (STUDOR VENTS). SECTION 917.3.2. |
| | |
| | 4B. SHT P-1 SANITARY RISERS 44A, & 51A |
| | ARE NOT SHOWN ON THE FLOOR PLAN. PLEASE |
| | CLARIFY. SECTION 104.2.1. |
| | |
| | 5B. SHT P-1 CONDENSATE LINE IS CONNECTED |
| | TO THE SANITARY BUILDING DRAIN BETWEEN |
| | RISERS 43 & 39. THIS IS NOT APPROVED. |
| | MUNICIPAL CODE SECTION 90-125(5). |
| | |
| | 6B. SHT P-1 10 DD'S SHOWN AS RWL'S. |
| | PLEASE CORRELATE INFORMATION. SECTION |
| | 104.2.1. |
| | |
| | 7B. SHT P-2 RWL DESIGNATIONS COVERED UP |
| | BY RECTANGLE GRID REFERANCES AT COL. |
| | LINES 57.1-R.1, 57.1-N.1, 57.1-C.1 AND |
| | OVER A SANT. RISER DESIGNATION AT COL. |
| | LINE 57.1-B.2. PLEASE MOVE REFERENCES. |
| | SECTION 104.2.1. |
| | |
| | 8B. SHT P-2 10 3" DD'S ARE SHOWN AS |
| | RWL'S. PLEASE CORRELATE INFORMATION. |
| | SECTION 104.2.1. |
| | |
| | 9B. SHT P-2 6"RWL 3500SF UP & DOWN IS |
| | SHOWN AS 3200SF AT ROOF DRAIN. PLEASE |
| | CORRELATE INFORMATION. SECTION 104.2.1. |
| | |
| | 10B. SHT P-3 3RD FLOOR AND 7TH FLOOR ARE |
| | DIFFERENT FROM FLOORS 4, 5, & 6 AND EACH |
| | OTHER, SO HOW CAN ALL FLOORS BE TYPICAL? |
| | PLEASE CLARIFY. SECTION 104.2.1. |
| | |
| | 11B. SHT P-3 PLEASE INDICATE THE SQUARE |
| | FOOTAGE FOR ALL DECK DRAINS. SECTION |
| | 104.2.1 AND TABLE 1106.3. |
| | |
| | 12B. SHT P-36"RWL 3500SF UP & DOWN IS |
| | SHOWN AS 3200SF @ THE ROOF DRAIN. PLEASE |
| | CORRELATE INFORMATION. SECTION 104.2.1. |
| | |
| | 13B. SHT P-4RWL'S INDICATED AS PD'S OR |
| | DD'S ON STORM RISERS. PLEASE CLARIFY. |
| | SECTION 104.2.1. |
| | |
| | 14B. SHT P-6 SCUPPER SCHEDULE |
| | CALCULATIONS, CHECK ADDITION OF SF ON |
| | AREAS 22, 62, 79, & 106. SECTION |
| | 102.1.1. |
| | |
| | 15B. SHT P-7 WHITE-OUT IS NOT APPROVED |
| | ON SIGNED/SEALED SETS OF PLANS SUBMITTED |
| | FOR RECORD. SECTION 104.2.1.3. |
| | |
| | 16B. SHT P-7 SUBMIT A WATER RISER |
| | DIAGRAM ISOMETRIC FOR PIPING IN BOILER |
| | ROOM THAT REFLECTS THE LAYOUT ON THE |
| | FLOOR PLAN. SHOW ALL PIPE SIZES, VALVES, |
| | VACUUM RELIEF VALVES, CIRCULATION PUMPS, |
| | THERMAL EXPANSION CONTROL, THERMOMETERS, |
| | ETC. FOR THE DOMESTIC WATER HEATER & |
| | STORAGE TANK. SECTION 104.3.1.1. |
| | |
| | 17B. SHT P-7 BOILER ROOM DETAIL THE COLD |
| | WATER SUPPLY APPEARS TO BE PASSING THRU |
| | THE HOT WATER STORAGE TANK. PLEASE |
| | CLARIFY. SECTION 104.2.1. |
| | |
| | 18B. SHT P-13 PLEASE INDICATE WHAT IS AT |
| | THE TOP OF ALL COLD WATER RISERS. NO |
| | REFERENCE SYMBOL IS SHOWN ON SHT P-2 |
| | PLUMBING LEGEND. IF THEY ARE AIR |
| | CHAMBERS, THEY ARE NOT APPROVED. |
| | SECTIONS 104.2.1, 604.9, & PDI-WH 201. |
| | |
| | 19B. SHT P-16 RISER 44A/51A MAXIMUM 20 |
| | FIXTURE UNITS ON 4" STACK PER TABLE |
| | 912.3. |
| | |
| | 20B. SHT P-17 RISERS 52A, & 84AARE NOT |
| | FOUND ON THE HORIZONTAL BUILDING |
| | SANITARY DRAIN ISOMETRIC RISER DIAGRAM. |
| | SHTP-22. PLEASE CLARIFY. SECTION |
| | 104.2.1. |
| | |
| | 21B. SHT P-18 RISER 87A NOT FOUND ON THE |
| | HORIZONTAL BUILDING SANITARY DRAIN |
| | ISOMETRIC RISER DIAGRAM. SHT P-22 PLEASE |
| | CLARIFY. SECTION 104.2.1. |
| | |
| | 22B. SHT P-19 RISER 34/57 SHOWS NO |
| | CONNECTION TO STACK FOR FLOORS 15, 17, & |
| | 19. PLEASE CLARIFY. SECTION 104.2.1. |
| | |
| | 23B. SHT P-20 SPRINKLER DRAIN DETAIL. A |
| | TRAP AND A VENT ARE REQUIRED FOR THIS |
| | LINE. SECTIONS 901.2.1. & 1002.1. |
| | |
| | 24B. SHT P-22 HORIZONTAL SANITARY RISER |
| | DOES NOT REFLECT THE FLOOR PLAN. NO |
| | DRAIN LINES FOR THE FIRE SPRINKLER |
| | DRAINS. - FUTURE LINE, (4" 20FU), |
| | UPSTREAM OF RISER 68,69,70,72,73,74 NOT |
| | SHOWN. - FLOOR DRAIN UPSTREAM OF RISER |
| | 59-67 & 71 NOT SHOWN. - OFFSET FOR RISER |
| | 6 NOT SHOWN. - 2ND FLOOR OFFSET FOR |
| | RISER 22-26, 33-36, & 41 NOT SHOWN. |
| | SECTION 104.2.1. |
| | |
| | 25B. SHT P-22 RELIEF VENTS REQUIRED FOR |
| | ALL AAV'S, (STUDOR VENTS). SECTION |
| | 917.3.2. |
| | |
| | 26B. SHT P-22 SHOW THE VENT PIPING FOR |
| | ALL FUTURE LINES SHOWING ALL PIPE SIZES, |
| | AND INDICATE WHICH STACK THE VENTS |
| | CONNECT INTO. SECTION 104.2.1 AND TABLE |
| | 916.1. |
| | |
| | 27B. SHT P-22 RECHECK ALL DFU'S ADDITION |
| | IN SANITARY RISER. SOME ADDITION IS NOT |
| | CORRECT AND THIS AFFECT THE PIPE SIZING |
| | IN SOME CASES. (SEE RED LINE CORRECTIONS |
| | ON ONE SET OF PLANS. SECTION 104.2.1 AND |
| | TABLE 710.1(1). (NOTE: BATHROOM GROUP |
| | CONSISTING OF W/C, LAV, BIDET, AND TUB |
| | OR SHOWER IS 5FU, AND WITH AN EXTRA LAV |
| | AND SHOWER IS 8FU. - SOME RISERS APPEAR |
| | TO INDICATE MORE FIXTURE UNITS THAN ARE |
| | ACTUALLY SHOWN. - TRAPS FOR FIXTURES |
| | OVER 2" SHALL BE SIZED PER TABLE 709.2. |
| | (EXAMPLE: 3" FLOOR DRAIN IS 5FU). |
| | |
| | 28B. SHT P-22 RISER 22,23,24 DOES NOT |
| | SHOW PIPING FROM POOL EQUIPMENT ROOM, |
| | NOR FROM THE 2 FOUNTAINS AS INDICATED ON |
| | SHT P-3. PLEASE CORRELATE. SECTION |
| | 104.2.1. |
| | |
| | 29B. SHT P-22 SHOW THE CLEANOUTS WHERE |
| | REQUIRED PER SECTIONS 708.3.1, 708.3.3 & |
| | 708.3.5. (ALSO SHOW ON SHT P-1). |
| | |
| | 30B. SHT P-22 SHOW TRAPS AND VENTING FOR |
| | THE FIRE SPRINKLER DRAIN LINES AS |
| | REQUIRED IN SECTIONS 901.2.1 & 1002.1. |
| | |
| | 31B. SHT P-23 STORM RISER DIAGRAM, SHOW |
| | SF DRAINED BY EACH DD. - 4" RD(2000SF) |
| | DOES NOT REFLECT THE ROOF PLAN, NOR |
| | CALCULATIONS (1900SF). - 6" DD (4350SF) |
| | DOES NOT REFLECT 9TH FLOOR PLAN. (SHTS |
| | P-1 & P-3 4450SF) PLEASE CORRELATE |
| | SECTION 104.2.1. - CLEANOUTS REQUIRED |
| | PER SECTION 1101.8. (ALSO SHOW ON SHT |
| | P-1. |
| | |
| | 32B. SHT P-23A STORM RISER DIAGRAM DOES |
| | NOT REFLECT THE FLOOR PLAN. FOUNTAIN |
| | OVERFLOWS ARE NOT SHOWN. - OFFSET ON THE |
| | 9TH FLOOR FOR ROOF DRAIN 3200SF IS SHOWN |
| | ON THE 8TH FLOOR ON THE FLOOR PLAN. - |
| | SHOME SF FOR SOME DRAINS DO NOT REFLECT |
| | THE FLOOR PLAN AND/OR CALCULATIONS. |
| | PLEASE CORRELATE. - NO SF SHOWN FOR MANY |
| | DD'S AND CAN NOT VERIFY PIPE SIZE UNTIL |
| | SF FOR ALL DD'S IS SHOWN. SECTION |
| | 104.2.1 AND TABLE 1106.3. |
| | |
| | 33B. SHT P-32A CLEANOUTS REQUIRED PER |
| | SECTION 1101.8 SHALL BE SHOWN. (ALSO ON |
| | SHT P-1). |
| | |
| | 34B. BACKFLOW PREVENTION REQUIRED FOR |
| | IRRIGATION ON THE 9TH FLOOR. SECTION |
| | 608.13. |
| | |
| | 35B. A SEPARATE RPZV BACKFLOW IS |
| | REQUIRED FOR THE COOLING TOWER WATER |
| | SUPPLY LINE. (NOT SHOWN ON CIVIL SHEETS) |
| | |
| | 36B. SEE ATTACHED SHEET CONCERNING THE |
| | DESIGN PROFESSIONALS AND FS 53.80(2)(B). |
| | THIS IS GIVEN AS A NOTICE ONLY. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |