| 2006-06-26 00:00:00 | PROVISO:2001 FBC/BUILDING 10/4 UNIT |
| | PLEASE REVISE PLANS TO REFLECT THE |
| | IMPLEMENTATION OF THE PROVISO'S. |
| | |
| | COMMENT #6:SPECIFIC DRYER TO BE |
| | INSTALLED WHICH WILL ELIMINATE THE NEED |
| | OF THE BOOSTER FAN.PLEASE NOTE, |
| | SPECIFIC DRYER IS TO BE INSTALLED FOR |
| | FINAL INSPECTION 2001 FMC 504.6. |
| | |
| | COMMENT #7:PLAN SHEET M0.1 THE OUTSIDE |
| | AIR CALCULATIONS ARE BASED ON |
| | "INFILTRATION RATES".THE INFILTRATION |
| | RATES ARE "MAXIMUM RATES" ALLOWED BY |
| | CODE AND MAY NOT ACTUALLY EXIST.THE |
| | "ACTUAL" RATE IS NOT KNOWN UNLESS |
| | TESTED.OUTSIDE AIR CALCULATIONS ARE TO |
| | BE PER 2001 FMC 402.2, 402.2.1 OR TABLE |
| | 403.3.PLEASE PROVIDE CALCULATIONS. |
| | PLEASE NOTE, PLAN SHEET M2 INDICATES 6" |
| | OUTSIDE AIR DUCT, PLEASE REMOVE FROM THE |
| | PLANS IF THIS DUCT IS NOT GOING TO BE |
| | INSTALLED. |
| | |
| | COMMENT #8:AHU CLOSET IS USED AS A |
| | RETURN AIR PLENUM.PLAN SHEET M0.1 AHU |
| | DETAIL 15 ANNOTATES "NO COMBUSTIBLES |
| | ALLOWED IN THE RETURN AIR PLENUM". |
| | HOWEVER, PLAN SHEETS A-4.0.2 THROUGH |
| | A-4.5.3, THE DOOR SCHEDULE INDICATES THE |
| | AHU CLOSET DOOR WILL BE A WOOD LOUVERED |
| | DOOR.PLEASE NOTE, THE DOOR AND FRAME |
| | ARE REQUIRED TO MEET THE 25 FLAME/50 |
| | SMOKE INDEX WHEN TESTED UNDER ASTM 84. |
| | PLEASE VERIFY THE DOOR & FRAME MEET THIS |
| | REQUIREMENT PER 2001 FMC 602.2.1. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |