| 2006-06-06 00:00:00 | PROVISO:2001 FBC/BUILDING 9/5 UNITS |
| | |
| | PLEASE REVISE PLANS TO REFLECT THE |
| | IMPLEMENTATION OF PROVISO'S. |
| | |
| | 1.PLAN SHEET M0.1 THE AHU MOUNTING |
| | DETAIL, NOTE 15 STATES "NO COMBUSTIBLES |
| | ALLOWED IN MECHANICAL CLOSET" AS THIS IS |
| | USED AS A RETURN AIR PLENUM.THE DOOR |
| | SCHEDULE INDICATED ON A-4.7.1 SHOWS A |
| | WOOD LOUVERED DOOR TO THE AHU CLOSET. |
| | PLEASE VERIFY WITH THE DOOR MANFACTURE |
| | THAT THIS MEETS THE 25 FLAME/50 SMOKE |
| | INDEX SPECIFIED IN 2001 FMC 602.21. |
| | |
| | 2.OUTSIDE AIR CALCULATIONS INDICATED |
| | ON PLAN SHEET M0.1 ARE BASED ON |
| | INFILTRATION RATES.THE INFILTRATION |
| | RATES ARE THE "MAXIMUM" ALLOWED BY CODE |
| | & MAY NOT BE A "TRUE/ACTUAL" RATE. |
| | PLEASE PROVIDE CALCS IN ACCORDANCE WITH |
| | 2001 FMC 402.2., 402.2.1 OR TABLE 403.3. |
| | PLEASE NOTE, 6" O.A. DUCT IS INDICATED |
| | ON PLAN SHEET M2.PLEASE REMOVE FROM |
| | THE PLAN IF THIS IS NOT BEING INSTALLED. |
| | |
| | 3.SPECIFIC DRYERS ARE TO BE INSTALLED |
| | BY FINAL INSPECTION. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |