Plan Review Notes
Plan Review Notes For Permit 05091265
Permit Number 05091265
Review Stop M
Sequence Number 7
Notes
Date Text
2007-06-26 14:27:42FBC 2004 CODE FAMILY
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 REVISED MECHANICAL PLANS DATED 5/18/07. THE FOLLOWING
 PAGES PASSED REVIEW:
 M2.12, M2.18, M2.21, M2.24, M2.27, M2.30, M2.31, M2.34,
 M2.35
  
 THE BALANCE OF PAGES SUBMITTED FOR REVISION ARE DENIED.
 THE FOLLOWING COMMENTS ARE ORGANIZED BY PAGE NUMBER.
 SOME COMMENTS ARE REFERENCED MORE THAN ONCE IF THE
 ISSUE IS FOUND ON MORE THAN ONE PAGE.
  
 1. M2.01: THE ACCESS DOOR FOR GEF-1 APPEARS TO BE IN
 CONFLICT WITH THE FAN HOUSING AND WILL NOT OPEN
 COMPLETELY. SEE FBC,M 306.5 FOR SERVICE ACCESS
 REQUIREMENTS.
  
 2. M2.01: THE INTAKE LOUVER FOR GEF-1 IS SHOWN ON PLANS
 TO BE APPROXIMATELY 7' WIDE. IN ORDER TO ACHIEVE 94
 SQ.FT., AS NOTED ON PLANS, THE LOUVER WOULD NEED TO BE
 OVER 13 FEET TALL. IS THERE SUFFICIENT CLEARANCE? FBC
 106.1.2
  
 3. M2.01, M2.04, M2.07, M2.10, M2.13, M2.16: WHAT ARE
 THE ACTUAL DIMENSIONS OF THE INTAKE LOUVERS FOR THE
 GEF'S? WHY IS THE FREE AREA OF THE EXHAUST LOUVERS
 (23.375 SQ.FT) LESS THAN HALF THE AREA OF THE INTAKE
 LOUVERS AT THE FANS (51.7 SQ.FT)? ALSO, PLEASE SHOW HOW
 THE REQUIRED MINIMUM VENTILATION RATE (CONTINUOUS) OF
 0.05 CFM PER SQ.FT. IS TO BE PROVIDED IN ACCORDANCE
 WITH FBC,M 404.2.
  
 4. M2.01: GARAGE VENTILATION NOTE ON PLAN STATES "2
 EXHAUST FANS," BUT THIS FLOOR USES ONLY ONE FAN. PLEASE
 REVISE NOTE SHOWING ONE FAN PROVIDING 44,000 CFM. FBC
 106.1.1
  
 5. M2.01: WHAT IS THE ELEVATION OF CU-T1 AND AMF-1?
 APPLIANCES LOCATED IN PUBLIC GARAGES, MOTOR
 FUEL-DISPENSING FACILITIES, REPAIR GARAGES OR OTHER
 AREAS FREQUENTED BY MOTOR VEHICLES, SHALL BE INSTALLED
 A MINIMUM OF 8 FEET ABOVE THE FLOOR. WHERE MOTOR
 VEHICLES EXCEED 6 FEET IN HEIGHT AND ARE CAPABLE OF
 PASSING UNDER AN APPLIANCE, APPLIANCES SHALL BE
 INSTALLED A MINIMUM OF 2 FEET HIGHER ABOVE THE FLOOR
 THAN THE HEIGHT OF THE TALLEST VEHICLE.
 EXCEPTION: THE REQUIREMENTS OF THIS SECTION SHALL NOT
 APPLY WHERE THE APPLIANCES ARE PROTECTED FROM MOTOR
 VEHICLE IMPACT AND INSTALLED IN ACCORDANCE WITH NFPA
 88B.
  
 6. M2.01: PROVIDE WALL MOUNTING DETAIL FOR CU-T1 WHICH
 WORKS IN CONJUNCTION WITH MANUFACTURER'S INSTALLATION
 INSTRUCTIONS, ESPECIALLY RELATED TO REQUIRED CLEARANCES
 FOR AIRFLOW, AND IS PROTECTED FROM MECHANICAL DAMAGE
 PER FBC,M 303.1 AND 303.4.
  
 7. M2.02: FOR CU-T2, CU-T3, CU-G1, CU-G@, CU-SGR1 AND
 AMF-1 PLEASE SEE COMMENTS 5 AND 6.
  
 8. M2.02: PLEASE SHOW HOW SERVICE ROOM 019 IS TO BE
 MAINTAINED AT A POSITIVE PRESSURE IN ACORDANCE WITH
 FBC,M 404.3 AND PROVIDED VENTILATION AS REQUIRED BY
 FBC,M 403.3.
  
 9. M2.02: FUTURE TENANT COMMERCIAL SPACE #14 FRESH AIR
 INTAKE LOUVER IS INSIDE THE PARKING GARAGE. THE AIR
 REQUIRED BY FBC,M 403.3 SHALL NOT BE RECIRCULATED PER
 403.2.1. ALSO, INTAKE OPENING LOCATIONS SHALL BE IN
 COMPLIANCE WITH FBC,M 401.5.1.
  
 10. M2.03: ARE INTAKE LOUVERS FOR THE GENERATOR MINIMUM
 10' FROM EXHAUST LOUVERS ON MEZZANINE LEVEL (M2.06)?
 FBC,M 401.5.1. ALSO, WHAT IS THE HEIGHT OF THE
 GENERATOR EXHAUST OUTLET? IS IT ON GROUND LEVEL OR
 MEZZANINE LEVEL? IT IS SHOWN ON BOTH PLANS. PLEASE
 CLARIFY AND SHOW COMPLIANCE WITH FBC,M 401.5.2 AND
 501.2.
  
 11. M2.03: WHERE IS THE CONTINUATION OF THE 8" ROUND
 EXHAUST DUCT FROM BATHROOMS AND JANITOR'S CLOSET? THERE
 IS NO CONTINUATION ON M2.06 AS THERE WAS ON PREVIOUS
 PLAN. FBC 106.1.1
  
 12. M2.04: FOR AMF-1, PLEASE SEE COMMENT #5.
  
 13. M2.04: PLEASE MARK THE SMOKE EXHAUST RISER SERVING
 THE MAIN LOBBY AREA. ALSO, IS IT THE INTENT OF THIS
 DESIGN TO CONVER THE SUPPLY DUCT SYSTEM FOR AHU-12 INTO
 A SMOKE EXHAUST DUCT WHEN THE AREA GOES INTO SMOKE
 CONTROL MODE? IF SO, THERE ARE SEVERAL ISSUES WHICH
 NEED TO BE ADDRESSED:
 A) SUPPLY DUCT APPEARS TO BE A STANDARD DUCTBOARD AND
 FLEX SYSTEM. THIS TYPE OF DUCT MAY NOT BE USED FOR ANY
 TYPE OF EXHAUST PER FBC,M 501.4 AND MUST BE DESIGNED TO
 MEET THE REQUIREMENTS FOR A SMOKE EXHAUST DUCT PER
 FBC,M 513.10.2.
 B) IF SUPPLY REGISTERS AND DIFFUSERS ARE TO BE USED FOR
 SMOKE EXHAUST, PLEASE PROVIDE SUBMITTAL DATA SHOWING
 THEIR SUITABILITY FOR USE IN A SMOKE EXHAUST SYSTEM. C)
 PLAN SHOWS FIRE DAMPERS IN SUPPLY DUCT WHICH APPEARS TO
 BE INTENDED FOR USE AS SMOKE EXHAUST DUCT. WHERE THE
 INSTALLATION OF A FIRE DAMPER WILL INTERFERE WITH THE
 OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM IN
 ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE
 PROTECTION SHALL BE UTILIZED. FBC,M 607.2.1
 D) WHAT IS THE AIR BALANCE DESIGN FOR THE DUCT SYSTEM
 WHEN IN SMOKE CONTROL MODE? FBC 106.1.2. IS THERE
 MAKE-UP AIR FOR THE 2000 CFM OF EXHAUST?
 E) PLEASE ALSO CHECK SMOKE EXHAUST DUCTS ON M2.05 TO
 VERIFY COMPLIANCE WITH THE ABOVE REQUIREMENTS.
  
 14. M2.05: FOR AMF-1, PLEASE SEE COMMENT #5.
  
 15. M2.05: THERE ARE SOME DUCTS RELATED TO THE SMOKE
 EXHAUST WHICH ARE MISSING SIZES ON PLANS. PLEASE
 CLARIFY. FBC 106.1.1
  
 16. M2.06: THERE IS NO SEPARATION BETWEEN AREAS MARKED
 AS "COMMERCIAL #15 AND "STORAGE." ARE THERE WALLS
 MISSING FROM THE PLAN? THIS MAY IMPACT THE NEED FOR
 FIRE DAMPERS PER FBC,M 607.5.
  
 17. M2.06: WHAT IS THE DESIGNATION, SIZE AND CFM OF
 RETURN GRILL IN THE 18X10 DUCT IN "STORAGE?"
  
 18. M2.07 REGARDING AMF-1 AND CU-E1, PLEASE SEE COMMENT
 #5.
  
 19. M2.07: ACORDING TO THE REFLECTIVE CEILING PLAN, THE
 ELEVATOR LOBBY AND CORRIDOR HAVE THE SAME CEILING
 HEIGHT. HOW IS IT POSSIBLE TO HAVE SIDEWALL GRILLS (TWO
 36X6) FOR SMOKE EXHAUST UNDER THESE CONDITIONS? HOW
 DOES THE FIRE WRAP INTERACT WITH THE RATED
 CORRIDOR/ELEVATOR LOBBY WALLS? HOW ARE THE OPENINGS AT
 THE END OF THE FIRE WRAP PROTECTED AT THE 36X6 GRILLS?
 THIS WOULD ESSENTIALLY BE UNPROTECTED OPENINGS IN A
 2-HOUR SHAFT. THE OVERALL INTENT OF THE DESIGN OF THIS
 AREA IS UNCLEAR AND MAY BE LACKING COORDINATION WITH
 ARCHITECTURAL PLANS.
  
 20. M2.08: REGARDING AMF-1 AND CU-19, PLEASE SEE
 COMMENT #5. REGARDING CU-E2, PLEASE SEE COMMENTS 5 AND
 6.
  
 21. M2.08: FOR SMOKE EXHAUST DUCT IN CORRIDOR ACROSS
 FROM ELECTRICAL ROOM, PLEASE SEE COMMENT #19.
  
 22. M2.08: PLEASE SHOW VENTILATION (OUTDOOR AIR) RATE
 OF 0.05 CFM PER SQ.FT FOR STORAGE AREA AND SHOW HOW THE
 AREA WILL BE MAINTAINED AT A POSITIVE PRESSURE PER
 FBC,M 404.3.
  
 23. M2.09: ARE SHOWN AS BEING REVISED ON PLAN IS
 CLOUDED AND MARKED AS REVISION 6, BUT REVISIONS LISTED
 IN TITLE BLOCK AREA ONLY GO TO REVISION 4. PLEASE
 CLARIFY. FBC 106.1.3.
  
 24. M2.10: PLEASE SEE COMMENTS 5 AND 19.
  
 25: M2.10: ELECTRICAL ROOM IN CORRIDOR SHOWS AN
 UNDERCUT DOOR FOR AIRFLOW. HOWEVER, THERE IS NO
 MECHANICAL EQUIPMENT OR MEANS TO CAUSE AIRFLOW INTO THE
 ELECTRICAL ROOM. ALSO, THE ELCTRICAL ROOM DOOR IS PART
 OF A FIRE AND SMOKE BARRIER (CORRIDOR) AND THEREFORE
 SHOULD NOT BE UNDERCUT OR HAVE ANY GAP WHICH IS NOT
 PART OF A LISTED RATED DOOR ASSEMBLY..
  
 26. M2.11: PLEASE SEE ALL COMMENTS FOR PAGE M2.08
 (20,21,22). ALSO, SEE COMMENT #25 RELATED TO ELECTRICAL
 AND STORAGE ROOMS.
  
 27. M2.13 AND M2.16: PLEASE SEE COMMENTS 5, 19 AND 25.
  
 28. M2.14 AND M2.17: PLEASE SEE COMMENTS 20,21,22.
 ALSO, PLEASE SEE COMMENT #25 FOR ELECTRICAL AND STORAGE
 ROOMS.
  
 29. M2.15: AREA CLOUDED AS REVISED IS MARKED A REVISION
 7, HOWEVER THE REVISION SCHEDULE SHOWN IN TITLE BLOCK
 AREA ONLY GOES TO REVISION 4. PLEASE CLARIFY PER FBC,M
 106.1.3.
  
 30. M2.17: THERE IS A "BOILER ROOM" LOUVER CALCULATION
 BOX ADDED TO PLAN BUT IT IS NOT MARKED AS PART OF THIS
 REVISION. PLEASE CLARIFY. ALSO, THE BOILER/POOL
 EQUIPMENT ROOM HAS A NOTE WHICH STATES "DESIGN
 PENDING." THIS AREA CAN NOT BE FULLY REVIEWED WITH
 INCOMPLETE INFORMATION.
  
 31. M2.17: HOW ARE DUCT PENETRATIONS AT THE BOTTOM OF
 THE SHAFT FOR POOL ROOM VENT DUCT AND BOILER FLUE TO BE
 PROTECTED? FBC 707.11 AND FBC,M 606.5.5.1
  
 32. M2.17: COMBUSTION AIR DUCT FOR BOILER ROOM SHOULD
 BE DESIGNED PER FBC,FG 304.6.1 OR 304.6.2. IF TWO
 OPENINGS ARE USED, THEN BOTH OPENINGS ARE TO
 COMMUNICATE DIRECTLY WITH THE OUTDOORS. SEE FIG.
 304.6.1(3).
  
 33. M2.17: PLEASE PROVIDE INFORMATION ON TYPE OF
 VENTING TO BE USED FOR THE BOILER. THE HORIZONTAL
 LENGTH OF THE VENT CONNECTOR IS PROHIBITED BY FBC, FG
 TABLE 504.2.
  
 34. M2.19: PLEASE SEE COMMENTS 5 AND 19.
  
 35. M2.19: DOES THE RATING OF THE CORRIDOR CONTINUE
 INTO THE DECK LOBBY AREA? IF SO, ALL PENETRATIONS SHALL
 BE PROTECTED PER FBC,M 607.5. ALSO, THE CORRIDOR (EXIT
 ENCLOSURE) VENTILATION SYSTEM SHALL BE INDEPENDENT OF
 OTHER BUILDING VENTILATION SYSTEMS PER FBC,M 401.4.
  
 36. M2.19: WHERE ARE THE REFRIGERANT LINES AND MEANS OF
 CONDENSATE DISPOSAL FOR AHU 17? FBC 106.1.1.
  
 37. M2.19: PLEASE SEE COMMENT #19 RELATED TO SMOKE
 EXHAUST DUCT ACROSS FROM THE ELECTRICAL ROOM.
  
 38. M2.20: PLEASE PROVIDE CONTINUATION OF ROOM ON POOL
 DECK WITH AHU 18. NONE COULD BE FOUND ON PLANS. FBC
 106.1.1.
  
 39. M2.20,M2.23, M2.26, M2.29: PLEASE SEE COMMENT #19
 REGARDING SMOKE EXHAUST DUCT ACROSS FROM ELECTRICAL
 ROOM AND COMMENT #25 REGARDING ELECTRICAL AND STORAGE
 ROOM DOORS.
  
 40. M2.22: PLEASE SEE COMMENT #19.
  
 41. M2.25, M.28: PLEASE SEE COMMENTS 19 AND 25.
  
 42. M2.32: SEF-2 SHOWS A FIRE DAMPER IN THE DUCT. WHERE
 THE INSTALLATION OF A FIRE DAMPER WILL INTERFERE WITH
 THE OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM IN
 ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE
 PROTECTION SHALL BE UTILIZED. FBC,M 607.2.1
  
 43. M2.33: PLEASE PROVIDE SIZE AND OTHER RELEVANT DATA
 FOR INTAKE SIDE DUCT FOR SPF-1 AND SPF-2. FBC 106.1.1
  
 44. M2.33: RELIEF DAMPER APPEARS TO BE INSIDE THE STAIR
 ENCLOSURE. SHOULD IT BE AN AN EXTERIOR WALL?
  
 45. M3.01 THROUGH M3.06: MANY CHANGES ON PAGES, NONE
 ARE MARKED AS REVISIONS. PLEASE CLEARLY MARK ON PLANS
 THE AREAS WHICH ARE BEING REVISED AND INDICATE A DATE
 AND REVISION NUMBER. FBC 106.1.1 AND FBC 106.1.3.
  
 46. M4.01: THERE HAVE BEEN SEVERAL REVISIONS TO THIS
 PAGE SINCE THE PERMITTED SET. PLEASE CLEARLY MARK ALL
 CHANGES WHICH HAVE TAKEN PLACE SINCE THE PERMITTED SET
 OF PLANS. FBC 106.1.3.
  
 47. M4.02: THE DESIGNATED CFM OF EXHAUST ON EACH FLOOR
 DO NOT MATCH THE CFM AS SHOWN ON FLOOR PLANS. PLEASE
 COORDINATE DRAWINGS.
  
 48. M5.01: THIS PAGE GOES FROM REVISION 1 TO REVISION
 3. PLEASE SHOW WHAT CHANGES HAVE BEEN MADE RELATED TO
 REVISION 2. FBC 106.1.3.
  
 49. M5.02: THIS PAGE CONTAINS 2 PAGES OF SCHEDULES AND
 HAVE BEEN REDUCED IN SIZE AND QUALITY TO A POINT WHERE
 MUCH OF THE INFORMATION IS NOT LEGIBLE. PLEASE CORRECT.
 FBC 106.1.3
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]
  