| 2006-07-30 00:00:00 | ONE ROLL IN ELECTRIC FOR REVIEW. |
| | REVIEW IN PROGRESS. |
| | *********** UNSAT 3RD REVIEW ********** |
| | |
| | |
| | ** THIS OFFICE HAS STATED ON NUMEROUS |
| | OCCASIONS FOR THE DESIGN TEAM TO TAKE |
| | SOME ADDITIONAL TIME BEFORE RESUBMITTING |
| | PLANS AND EVEN AFTER RESUBMITTING PLANS |
| | TO GO OVER PLANS CAREFULLY. THIS OFFICE |
| | HAS STATED IF DESIGN TEAM FINDS ITEMS |
| | BEFORE REVIEWS ARE STARTED THEN THOSE |
| | SHEETS MAY BE CHANGED OUT. PLEASE SEE |
| | THE FOLLOWING COMMENTS BELOW. |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS |
| | REVIEW AND SOME NEW NOTES WHICH NEED TO |
| | BE ADDRESSED. |
| | PLEASE SEE NOTES BELOW ARE TAKEN |
| | DIRECTLY FROM PREVIOUS REVIEW AND NEW |
| | NOTES ARE ADDED TO THE LOWER PORTION OF |
| | REVIEW COMMENTS. |
| | |
| | |
| | CITY PALMS |
| | 10-STORY CONDO |
| | |
| | 1)NOTE: NO. PLEASE SEE COMMENTS. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | NOTE #1, NO, PLEASE SEE NEW NOTE |
| | PERTAINING TO THE NEW 2004 FBC AND |
| | CHAPTER 13. |
| | |
| | ** PREVIOUS REVIEW ** |
| | PLEASE KNOW, PLANS WERE SUBMITTED FOR |
| | "PLAN REVIEW" ONLY AND WERE NOT |
| | SUBMITTED FOR PERMIT BEFORE THE CODE |
| | CHANGE OF OCT 1ST, 2005 TO THE NEW |
| | 2004 FBC. |
| | PLEASE SEE THAT ANY CHANGES WILL BE |
| | NEEDED WHEN SUBMITTING FOR PERMIT. |
| | |
| | 2)NOTE: OK. |
| | |
| | 3)NOTE: OK. |
| | |
| | 4)NOTE: OK. |
| | |
| | 5)NOTE: OK, HOWEVER PLEASE KNOW THE YEAR |
| | STATED ON PREVIOUS NOTE FOR NFPA-20 WAS |
| | 1999 WHICH WAS MIS-STATED. THIS SHOULD |
| | HAVE BEEN 2003. IN EITHER CASE THIS CAN |
| | BE REDLINED AND NOTHING FROM THE 1999 TO |
| | THE 2003 APPEARED TO CHANGE DESIGN OR |
| | AFFECT PLANS. |
| | |
| | |
| | 6)NOTE: OK. |
| | |
| | 7)NOTE: NO, PLEASE SEE PHOTO-METRICS |
| | PROVIDED. PLEASE SEE SHEETS FOR CORIDORS |
| | AND STAIRS SHOW LEVELS 7-8 ONLY. |
| | SEE SHEETS WHICH INDICATE GRND FLOOR AND |
| | 2-5 ONLY CONTAIN SOME AREAS. PLEASE SEE |
| | MSSING OTHER LEVELS ETC. |
| | PLEASE SUBMIT COMPLETE PHOTO-METRICS FOR |
| | ALL COMMON AREA EGRESS PATHS. |
| | IF ALL CORRIDORS GOING UP THROUGH |
| | BUILDIGN ARE THE SAME, THESE CAN BE ON |
| | TYPICAL FLR DETAIL FOR FLRS "X"-"?". |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | NOTE #7NO, PLEASE SEE SOME |
| | WERE SUBMITTED FOR GARAGE AND CORRIDORS, |
| | HOWEVER STAIRWAYS COULD NOT BE LOCATED. |
| | PLEASE ALSO KNOW, LEVELS UNDER EM POWER |
| | SHALL BE PROVIDED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE COMPLETE "PHOTO-METRICS" |
| | FOR ALL CORRIDORS, STAIRWELLS AND EGRESS |
| | AREAS PER 2003 NFPA-101 7.8 AND 7.9. |
| | PLEASE SEE A MIN OF 10 FT CANDLES IS NOW |
| | REQUIRED FOR STAIR TOWERS UNDER NORMAL |
| | EGRESS CONDITIONS. |
| | |
| | 8)NOTE: OK. |
| | |
| | |
| | 8)NOTE: OK. |
| | |
| | 9)NOTE: OK. |
| | |
| | 10)NOTE: OK. |
| | |
| | 11)NOTE: OK. |
| | |
| | 12)NOTE: OK. |
| | |
| | 13)NOTE: OK. |
| | |
| | 14)NOTE: OK. |
| | |
| | 15)NOTE: OK. |
| | |
| | 16)NOTE: OK. |
| | |
| | 17)NOTE: OK. |
| | |
| | 18)NOTE: OK. |
| | |
| | 19)NOTE: OK. |
| | |
| | 20)NOTE: OK, HOWEVER SEE NEW NOTE. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SHOW CIRCUITING FOR ALL UNITS AND |
| | CORRELATE WITH THE PANEL SCHEDULES |
| | SUBMITTED. PLEASE KNOW, CODE COMPLIANCE |
| | FOR SOME ITEMS CAN NOT BE DONE AT THIS |
| | TIME. |
| | |
| | 21)NOTE: OK. |
| | |
| | 22)NOTE: OK. |
| | |
| | 23)NOTE: OK. |
| | |
| | 24)NOTE: OK. |
| | |
| | 25)NOTE: OK. |
| | |
| | 26)NOTE: OK. |
| | |
| | 27)NOTE: OK. |
| | |
| | 28)NOTE: OK. |
| | |
| | 29)NOTE: OK. |
| | |
| | 30)NOTE: OK. |
| | |
| | 31)NOTE: OK. |
| | |
| | 32)NOTE: OK. |
| | |
| | 33)NOTE: OK. |
| | |
| | 34)NOTE: OK. |
| | |
| | 35)NOTE: OK. |
| | |
| | 36)NOTE: OK. |
| | |
| | 37)NOTE: OK, HOWEVER NOTE PERTAINING TO |
| | THE GROUNDING AND THE GENERATOR BEING |
| | SEPARATELY DERIVED WAS REMOVED. THE NOT |
| | SHOULD HAVE REMAINED, ONLY ADJUSTED TO |
| | READ GENERATOR IS SEPARATELY DERIVED. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | NOTE #37 NO, PLEASE SEE NO |
| | SPECS WERE SUBMITTED. PLEASE ALSO SEE |
| | RISER INDICATES THE 4-POLE ATS, HOWEVER |
| | NOTES MENITON THIS IS NOT A SEPARATELY |
| | DERIVED GENERATOR? PLEASE SEE AS A |
| | 4-POLE ATS, THE GEN IS "SEP DERIVED" AND |
| | GROUNDING SHALL BE DONE ACCORDINGLY. |
| | PLEASE SEE MISSING BONDING AT FIRST |
| | MENAS OF DISCONNECT , EQUIPMENT GROUNDD |
| | ETC. PLEASE SEE NFPA-110 6.2.15*. PLEASE |
| | VERIFY WITH MANUFACTURE OF EQUIPMENT. |
| | PLEASE SEE NEW NOTES FOR ATS AND MAIN. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT ALL INFORMATION |
| | FOR GENERATOR/ ATS. PLEASE SUBMIT THE |
| | SPECS/CUT FROM MANUFACTURE. |
| | PLEASE VERIFY OF THE ATS WILL BE A |
| | 4-POLE SWITCH. |
| | PLEASE SEE 700.7D AND IF YOU HAVE THE |
| | HANDBOOK, SEE EXPLANATION OF ARTICLE. |
| | I HAVE ATTACHED BOTH, JUST IN CASE. |
| | |
| | (D) GROUND FAULT. TO INDICATE A GROUND |
| | FAULT IN SOLIDLY GROUNDED WYE |
| | EMERGENCY SYSTEMS OF MORE THAN 150 VOLTS |
| | TO GROUND AND CIRCUIT-PROTECTIVE |
| | DEVICES RATED 1000 AMPERES OR MORE. THE |
| | SENSOR FOR THE GROUND-FAULT SIGNAL |
| | DEVICES SHALL BE LOCATED AT, OR AHEAD |
| | OF, THE MAIN SYSTEM DISCONNECTING |
| | MEANS FOR THE EMERGENCY SOURCE, AND THE |
| | MAXIMUM SETTING OF THE SIGNAL |
| | DEVICES SHALL BE FOR A GROUND-FAULT |
| | CURRENT OF 1200 AMPERES. INSTRUCTIONS |
| | ON THE COURSE OF ACTION TO BE TAKEN IN |
| | EVENT OF INDICATED GROUND FAULT |
| | SHALL BE LOCATED AT OR NEAR THE SENSOR |
| | LOCATION. |
| | |
| | ALTHOUGH 700.26 INDICATES THAT |
| | GROUND-FAULT PROTECTION OF EQUIPMENT IS |
| | NOT |
| | REQUIRED ON THE ALTERNATE SOURCE FOR |
| | EMERGENCY SYSTEMS, GROUND FAULTS CAN |
| | OCCUR ON SUCH SYSTEMS, AND THEY CAN |
| | RESULT IN EQUIPMENT BURNDOWN. BECAUSE |
| | OF THE EMERGENCY NATURE OF SUCH SYSTEMS, |
| | AUTOMATIC DISCONNECT IN THE EVENT |
| | OF A GROUND FAULT IS INAPPROPRIATE. |
| | DETECTION OF SUCH A FAULT, HOWEVER, IS |
| | DESIRABLE SO THAT THE CONDITION CAN BE |
| | CORRECTED. |
| | IN MY READING AND THE INFORMATION FROM A |
| | COULE OF MANUFACURES OF ATS SWITCHES, A |
| | 4-POLE ATS IS REQUIRED. PLEASE RESERCH |
| | THE INFORMATION AND ADJUST. |
| | |
| | 38)NOTE: OK. |
| | |
| | 39)NOTE:OK, HOWEVER SEE NOTE ABOVE |
| | ABOUT THE GEN BE SD.PLEASE ALSO SEE THAT |
| | SINCE ONLY ONE "DRAWING KEYNOTE RISER' |
| | IS SUBMITTED FOR REVIEW. PLEASE SEE NOTE |
| | #11 MISPRINTS STATING 230.79 TWICE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | NOTE #39 YES/ NO, PLEASE NOW |
| | SEE TWO SETS OF DRAWING KEYNOTES, WHICH |
| | AS NOTED IN ONE SET MOST DO NOT |
| | CORRELATE WITH RISER DIAGRAM. PLEASE SEE |
| | SOME COMMENTS FOR OTHER. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE COMPLETE DRAWING KEYNOTES TO |
| | CORRELATE WITH PLANS. |
| | |
| | 40)NOTE: OK. |
| | |
| | 41)NOTE: OK. |
| | |
| | 42)NOTE: OK. |
| | |
| | |
| | ************************************** |
| | ************************************* |
| | ******** NEW NOTES 2ND REVIEW ********* |
| | |
| | |
| | 43) NOTE: NO, PLEASE SEEE THE ONLY TYPE |
| | WRITTEN RESPONSE WAS DATED FEB 2006. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE KNOW, A FULL AND |
| | COMPLETE TYPE WRITTEN RESPONSE FROM THE |
| | DESIGN TEAM WHICH RESPONSES TO THE PLANS |
| | REVIEWERS COMMENTS WILL HELP IN |
| | EXPEDITING THE PLAN REVIEW PROCESS. THIS |
| | NUMERICAL REPONSE WILL HELP TO |
| | ALLEAVIATE ANY BACK AND FORTH QUESTIONS |
| | OR CONFUSION. |
| | NO, RESPONSE LETTERS WERE SUBMITTED WHEN |
| | PLANS WERE BROUGHT BACK FOR REVIEW. |
| | |
| | 44) NOTE: NO, SAME NOTE. PLEASE SEE THE |
| | SAME BOOKS AND CALCULATIONS WERE |
| | SUBMITTED BACK WITH ANY CORRECTIONS OR |
| | CHANGES. |
| | PLEASE SEE MOST OF THE BOOKS AND |
| | CALCULATIONS ARE NOT SIGNED, DATED OR |
| | SEALED AND THE ONES THAT ARE SIGN/SEALED |
| | ARE STILL THE SAME. PLEASE SEE THIS SEAL |
| | WITH THE WORDING OF "CERTIFICATE" IS NO |
| | LONGER ACCEPTABLE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE ALL PLANS, SHEETS, |
| | DOCUMENTS BEING SIGNED, DATED OR SEALED |
| | BY A LICENSED PE, SHALL ONLY CONTAIN A |
| | SEAL WITH THE WORDING OF "LICENSE". |
| | PLEASE SEE A RULING BY THE FLORIDA BOARD |
| | OF PROFESSINAL ENGINEERS DATED IN |
| | FEBUARY "04", RULED IN 61G15-23.001, |
| | THAT ALL SEALS SHALL NO LONGER USE |
| | "CERTIFICATE" IN SAID SEAL. PLEAS KNOW, |
| | AN EXTENSION WAS GIVEN TO THE DATE OF |
| | DEC. 31ST , 2005.PLEASE SEE THIS IS |
| | NOT A COMMENT FOR STEVEN FELLER AS SEAL |
| | IS CORRECT. PLEASE SEE OTHER DOCUMENTS |
| | SUBMITTED DO CONTAIN THE SEAL WHICH IS |
| | NO LONGER ACCEPTABLE. |
| | PLEASE SEE DE LOS REYES ENG.AND ANY |
| | OTHERS WHICH MAY STILL BE UTILIZING OLD |
| | SEAL. |
| | PLEASE KNOW, THIS COMMENT IS MADE FOR |
| | ALL PLANS AND DOCUMENTS WHETHER OR NOT |
| | COMMENT IS MADE BY OTHER REVIEWER(S). |
| | |
| | 45) NOTE: NO, PLEASE SEE CALCULATIONS |
| | ARE STILL SHOWING ALL CALCULATIONS FROM |
| | THE 2001 FBC. PLEASE SEE THESE WERE |
| | SIGNED AND SEALED AFTER THE CODE CHANGE |
| | YET STILL WERE DONE UNDER THE 2001 FBC. |
| | PLEASE SEE CALCULATIONS CAN NOT BE |
| | VERIFIED FOR COMPLIANCE OF LIGHTING |
| | LEVELS, CONTROLS ETC. |
| | PLEASE BE SURE THE CALCUALTIONS MEET THE |
| | PERFORMANCE CALCULATIONS PER |
| | 13-415.1.AB.1,13-415.2.ABC.1, TABLES |
| | 415.2.C.1, 415.2.B.1 ETC |
| | PLEASE ALSO SEE NUMEROUS AREAS/ROOMS |
| | WHICH FALL UNDER SEPARATE SPACES ON |
| | MULTIPLE FLOORS WHICHSTIL DO NOT |
| | CONTAIN REQUIRED CONTROL DEVICES. PLEASE |
| | KNOW, IN A MEETING HELD BEFORE PLANS |
| | WERE SUBMITTED THE FUTURE RETAIL |
| | COMMERICAL SPACES WERE SHOWN WITH TIME |
| | CLOCKS AND OVER RIDES DEVICES AND THE |
| | COMMENT WAS MADE BY THIS REVIEWER THAT |
| | ONLY THE TC'S WERE NOT REQUIRED IF AN |
| | TIMED DEVICE OR OCCUPANCY SENSOR WAS |
| | PRESENT. PLEASE SEE ALL LIGHTING |
| | CONTROLS WERE REMOVED COMPLETELY>??? |
| | PLEASE SEE SECTION BELOW FOR SEPARATE |
| | SPCES. |
| | MOST OF THESE AREAS HAVE BEEN REDLINED |
| | AND HIGHLIGHTED FOR MISSING CONTROLS |
| | REQUIRED. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE FBC 2004 CHAPTER |
| | 13, 13-415.1.ABC.1.1, &.2, &.3. |
| | PLEASE SHOW AND PROVIDE DEVICES, |
| | CONTROLS ETC FOR ALL AREAS NOW REQUIRED |
| | TO CONTAIN ENERGY CONSERVATION MEASURES. |
| | PLEASE SEE 13-413.1ABC.1 AND PROVIDE |
| | NOTES/WORST CASE FOR VOLTAGE DROP. |
| | PLEASE SEE 13-415.1.ABC.2 FOR AREA |
| | LIGHTING. |
| | PLEASE SEE THESE CHANGES ARE COMPLETELY |
| | DIFFERENT FORM THE 2001 FBC. |
| | THESE CHANGES BECAME FEDERALLY MANDATED |
| | FOR ALL STATES TO COMPLY IN THE NEXT |
| | CODE CYCLE/CHANGE. THIS FEDERAL MANDATE |
| | WAS PASSED JULY 2004 |
| | PLEASE SEE NOTE #1 FROM PREVIOUS REVIE |
| | MENTIONED TO SEE ALL 2004 FBC FOR ALL |
| | CHANGES IN DESIGN AS PROJECT WAS NOT |
| | SUBMITTED FOR PERMIT UNDER THE 2001 FBC. |
| | |
| | 46) NOTE: OK. |
| | |
| | 47) NOTE: OK, HOWEVER SEE NEW NOTES DUE |
| | TO INFORMATION SUBMITTED FOR GENERATOR. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | A) PLEASE SEE NFPA-110, 7.9.3.1, |
| | GALVANIZED LINES SHALL NOT BE USED FOR |
| | PIPNG TO GENERATOR. THIS IS NOTED FOR |
| | PLUMBING/ ENGINEERING AS SOME LOCATIONS |
| | IN THE JURISDICTION HAS INSTALLED THESE |
| | AND HAVE HAD TO CHANGE TYPES OF PIPING. |
| | PLEASE KNOW THIS IS A NOTE AT THIS TIME |
| | FOR INFORMATIONAL PURPOSE ONLY. |
| | B) PLEASE ALSO SEE NFPA-20, NFPA-110 , |
| | NOTES AND SPECS FOR FUEL TYPE AND |
| | STORAGE WAS NOTE SUBMITTED, PLEASE SEE |
| | MIN RUNNING TIME CAN NOT BE VERIFIED. |
| | PLEASE SEE 6-6.2 FOR A MIN OF 8 HRS |
| | @100% ALONG WITH ALL OTHER MIN REQUIRED |
| | LIFE SAFETY LOADS. |
| | THE AMOUNT OF FUEL, AND GPH SHOULD BE |
| | NOTED ON PLANS. ONE OF THE DRAWING KEY |
| | NOTES MENTIONS 500 GAL TANK?TBD. |
| | |
| | 48) NOTE: OK. |
| | |
| | 49) NOTE: NO, PLEASE SEE SOME FIXTURE |
| | DESIGNATIONS ARE STILL NOT ON PLANS. |
| | PLEASE SEE REDLINED PLANS. EXAMPLE: |
| | PLEASE SEE FIXTURE ON 2.04, COMM #4 |
| | SPACE. PLEASE SEE SOME FIXTURES ON |
| | PLANS DO NOT CONTAIN FIXTURE |
| | DESIGNATIONS. |
| | "REDLINED ON PLANS" |
| | |
| | 50) NOTE: OK. |
| | |
| | 51) NOTE: OK. |
| | |
| | 52) NOTE: OK. |
| | |
| | 53) NOTE: OK. SEE NEW NOTES. |
| | |
| | 54) NOTE: OK. |
| | |
| | 55) NOTE: NO, PLEASE SEE THAT THE |
| | GENERATOR IS A SD SYSTEM AND THE FIRST |
| | MEANS OF DISCONNECT PER 250.24B IS NOW |
| | THE BREAKER(S) LOCATED ON THE GEN. |
| | PLEASE SEE FEEDERS F-8 AND F-9 AS THESE |
| | WILL BOTH REQUIRED "EQUIPMENT GROUNDING |
| | CONDUCTORS". |
| | 210.110,250.24B,250.122 |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE PREVIOUS NOTE WITH |
| | RESPECT TO THE ATS AND 4-POLE, |
| | SEPARATELY DERIVED SYSTEM. |
| | PLEASE SEE 250.6,250.24B AND 250.122 FOR |
| | SIZING ANY EQUIPMENT GORUNDING |
| | CONDUCTORS. |
| | |
| | 56) NOTE: OK. |
| | |
| | 57) NOTE: OK. |
| | |
| | 58) NOTE: NO, SAME COMMENT, THIS WAS |
| | REDLINED ON PLANS ONCE AGAIN. |
| | PLEASE SEE "LOAD SUMMARY" ON E5.01, |
| | PLEASE SE "*" AS NOTE, AND ADDED "*" |
| | NEXT TO THE LINE FOR FIRE PUMP. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE LOAD SUMMARY FOR |
| | FIRE PUMP ON RISER WHICH CONTAINS AN "*" |
| | ASTERISK FOR NOTE OF MAGNETIC ONLY 6X |
| | LR, HOWEVER THIS "*" IS NOT ABOVE FOR |
| | FIRE PUMP. SEE REDLINES THIS IS NOTED AS |
| | PLANS ARE COMING BACK FOR COMMENTS. |
| | |
| | 59) NOTE: OK. |
| | |
| | 60) NOTE: OK. |
| | |
| | 61) NOTE: NO, THIS IS YET TBD. THIS DOES |
| | NOT NEED TO BE DONE OR NOTED ON PLANS |
| | NOW. IF INFORMATION WAS OBTAINED FROM |
| | THE LAST MEETING PLEASE PLACE ON RISER. |
| | PLEASE KNOW THE ARCHITECT WAS GOING TO |
| | CALL TO FIND THIS OUT. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE ELEVATION FOR |
| | EPSS. PLEASE SEENFPA-110 7.2.3*,THE |
| | ELEVATION OF THE EPSS SHALL BE 6" ABOVE |
| | THE "SLOSH" PREDICATION LEVELS. |
| | "SEA, LAKE, OVERLAND SURGES BY |
| | HURRICANCES. CHARTS BASED ON SURGES FROM |
| | A CAT 4 STORM. |
| | |
| | 62) NOTE: OK, HOWEVER PLEASE BE SURE TO |
| | DO THE SAME. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | WHEN AND BEFORE RESUBMITTING |
| | PLANS, PLEASE COMPLETELY REMOVE ANY AND |
| | ALL OLD/VOIDED SHEETS FROM SETS. PLEASE |
| | ONLY INSERT ONLY NEW REVISED SHEETS INTO |
| | COMPLETE SETS FOR REVIEW AND STMAPING. |
| | PLEASE KNOW, THIS WAS DONE ON THIS |
| | SUBMITTAL. |
| | |
| | *************************************** |
| | ****** NEW NOTES 3RD REVIEW ********* |
| | |
| | 63) NOTE: PLEASE KNOW,THIS IS THE FIRST |
| | REVIEW WHERE MANUFACTURE SPECS/CUT |
| | SHEETS HAVE BEEN SUBMITTED FOR A |
| | COMPLETE REVIEW OF THE GENERATOR. PLEASE |
| | SEE THAT PLANS AND DESIGN HAS CHANGED |
| | FROM PREVIOUS PLANS WHICH CONTAINED A |
| | DAY TANK LOCATED IN THE ROOM. PLEASE SEE |
| | NFPA-20 (2003)OR 1999 AS BOTH REQUIRE |
| | THE SAME. |
| | 9.6.2.2 THE FUEL SUPPLY CAPACITY SHALL |
| | BE SUFFICIENT TO PROVIDE 8 HOURS OF FIRE |
| | PUMP OPERATION AT 100 PERCENT OF THE |
| | RATED PUMP CAPACITY IN ADDITION TO THE |
| | SUPPLY REQUIRED FOR OTHER DEMANDS.(2003) |
| | OR |
| | 6-6.2* (1999) |
| | THESE POWER SOURCES SHALL COMPLY WITH |
| | SECTION 6-4 AND SHALL MEET THE |
| | REQUIREMENTS OF LEVEL 1, TYPE 10, CLASS |
| | X SYSTEMS OF NFPA 110, STANDARD FOR |
| | EMERGENCY AND STANDBY POWER SYSTEMS. THE |
| | FUEL SUPPLY CAPACITY SHALL BE SUFFICIENT |
| | TO PROVIDE 8 HOURS OF FIRE PUMP |
| | OPERATION AT 100 PERCENT OF THE RATED |
| | PUMP CAPACITY IN ADDITION TO THE SUPPLY |
| | REQUIRED FOR OTHER DEMANDS. |
| | |
| | ** PLEASE KNOW UPON THE REVIEW OF SPECS, |
| | THE GENERATOR SHOWS A CONSUMPTION OF |
| | 119GPH OR 450LPH. PLEASE SEE BASED ON A |
| | 500 GAL SUB- BASE TANK THIS WOULD ONLY |
| | PROVIDE ENOUGH FUEL FOR 4.20 HRS. PLEASE |
| | ADJUST GENERATOR FOR ONE THAT WILL RUN |
| | ON SUBSTANTIALLY LESS FUEL OR INCREASE |
| | TANK SIZE. |
| | PLEASE SUBMIT SPEC/MANUFACTURE SHEETS ON |
| | FUEL TANK IF GOING TO A LARGER TANK OR |
| | SUBMIT SPECS/MANIFACTURE SHEET IF |
| | CHANGING GENERATOR. |
| | |
| | 64) NOTE: PLEASE SEE UNIT "B1" MISSING |
| | CIRCUIT #22 ON PANEL SCHEDULE. (THIS CAN |
| | BE REDLINED). |
| | |
| | 65) NOTE: PLEASE SEE ATTACHED COPY OF |
| | THE FS 553.80(2)(B) WIHT RESPECT TO |
| | DESIGN PROFESSIONALS AND REPEAT COMMENTS |
| | FOR CODE COMPLIAMCE. |
| | PLEASE KNOW THIS IS ONLY A NOTICE GIVEN |
| | AT THIS TIME. |
| | |
| | 66) NOTE: WHEN RESUBMITTING PACKAGES, |
| | PLEASE PLACE ALL SPEC/MANUFACTURES CUT |
| | SHEETS IN BINDERS WITH TABS/LABELS FOR |
| | EASY LOCATING AND REVIEW. PLEASE SEE |
| | MANY SHEETS ARE ONLY PLACED INDIVIDUALLY |
| | IN BOXES OR IN FOLDERS. |
| | PLACING PRODUCT APPROVALS AND SPEC IN |
| | BINDERS WOULD GREATLY HELP IN THE REVIEW |
| | PROCESS ALSO. |
| | |
| | ** PLEASE SEE LOCATIONS ON PLANS IN |
| | WHICH MANY OF THE ABOVE ITEMS HAVE BEEN |
| | REDLINED AT LOCATIONS OF COMMENTS. |
| | |
| | ** PLEASE BE AWARE OF ANY COMMENTS FROM |
| | OTHER REVIEWER(S) WHICH MAY HAVE AN |
| | AFFECT ON ELECTRICAL PLANS. |
| | |
| | ** PLEASE SUBMIT COMPLETED PLANS FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |
| | |
| | |