| Date |
Text |
| 2006-05-08 00:00:00 | REVIEW IN PROGRESS |
| | *********** UNSAT ************ |
| | |
| | ** 2ND REVIEW, 1ST REVIEW UNDER PERMIT. |
| | PLEASE KNOW, WILL ALSO HAVE ONE FREE |
| | RESUB FOR NEXT REVIEW. |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS |
| | REVIEW AND SOME NEW NOTES WHICH NEED TO |
| | BE ADDRESSED. |
| | PLEASE SEE NOTES BELOW ARE TAKEN |
| | DIRECTLY FROM PREVIOUS REVIEW AND NEW |
| | NOTES ARE ADDED TO THE LOWER PORTION OF |
| | REVIEW COMMENTS. |
| | |
| | *** UNSAT *** |
| | |
| | CITY PALMS |
| | 10-STORY CONDO |
| | |
| | 1)NOTE: NOTE #1, NO, PLEASE SEE NEW NOTE |
| | PERTAINING TO THE NEW 2004 FBC AND |
| | CHAPTER 13. |
| | |
| | ** PREVIOUS REVIEW ** |
| | PLEASE KNOW, PLANS WERE SUBMITTED FOR |
| | "PLAN REVIEW" ONLY AND WERE NOT |
| | SUBMITTED FOR PERMIT BEFORE THE CODE |
| | CHANGE OF OCT 1ST, 2005 TO THE NEW |
| | 2004 FBC. |
| | PLEASE SEE THAT ANY CHANGES WILL BE |
| | NEEDED WHEN SUBMITTING FOR PERMIT. |
| | |
| | 2)NOTE: NOTE #2 OK. |
| | |
| | 3)NOTE: NOTE #3 OK, HOWEVER SEE NOTE |
| | WITH RESPECT TO 110.26 AND ELECTRICAL |
| | ROOMS AND SOME ELECTRICAL EQUIPMENT AND |
| | REQ'D CLEARENCE. |
| | |
| | 4)NOTE: NOTE #4 OK |
| | |
| | 5)NOTE: NOTE #5 NO, PLEASE KNOW, PLANS |
| | SHALL BE SPECIFIC TO THE CODE IN EFFECT |
| | AND THE DESIGN IN WHICH THE BUILDING IS |
| | BUILT. |
| | PLEASE REFERENCE THE FOLLOWING CODES, AS |
| | THESE CODES WERE NOT FOUND ON THE |
| | ARCHITECTURAL PLANS. |
| | 2002 NFPA-70, 2003 NFPA-101, 2002 |
| | NFPA-110, 1999 NFPA-20. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE BE SURE PLANS ARE SPECIFIC TO |
| | THE 2002 NEC WHICH IS CURRENTLY IN |
| | EFFECT. |
| | PLEASE KNOW: DEPENDING ON WHEN PLANS ARE |
| | SUBMITTED FOR PERMIT, A CODE CHANGE TO |
| | THE 2005 NEC SHOULD BE COMING ABOUT IN |
| | MID 2006. |
| | |
| | 6)NOTE: NOTE #6 OK. |
| | |
| | 7)NOTE: NOTE #7NO, PLEASE SEE SOME |
| | WERE SUBMITTED FOR GARAGE AND CORRIDORS, |
| | HOWEVER STAIRWAYS COULD NOT BE LOCATED. |
| | PLEASE ALSO KNOW, LEVELS UNDER EM POWER |
| | SHALL BE PROVIDED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE COMPLETE "PHOTO-METRICS" |
| | FOR ALL CORRIDORS, STAIRWELLS AND EGRESS |
| | AREAS PER 2003 NFPA-101 7.8 AND 7.9. |
| | PLEASE SEE A MIN OF 10 FT CANDLES IS NOW |
| | REQUIRED FOR STAIR TOWERS UNDER NORMAL |
| | EGRESS CONDITIONS. |
| | |
| | 8)NOTE: NOTE #8 OK, PLEASE SEE NEW |
| | COMMENTS FOR GEN RM. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE BE SURE THERE ARE EMERGENCY |
| | BATTERY BACK UP TYPE FIXTURES LOCATED IN |
| | ALL ELECTRICAL ROOMS, ELEVATOR EQUIPMENT |
| | ROOMS, FIRE PUMP, GENERATOR, AND FIRE |
| | COMMAND ROOM. |
| | PLEASE KNOW, SOME OF THESE ARE ALREADY |
| | SHOWN ON PLANS, HOWEVER SOME AREAS MAY |
| | BE REDLINED FOR THESE. |
| | NFPA-101 7.8,7.9, NEC 700.16 ETC. |
| | |
| | 8)NOTE: NOTE #8 ( # MISPRINT)NO, PLEASE |
| | SEE STAIRS INDICATE A BATTERY ABCK UP AT |
| | EVERY OTHER LEVEL WHICH IS OK. PLEASE |
| | SEE CORRIDORS AND GARAGES EGRESS PATHS |
| | ARE TO CONTAIN A MININUM OF SOME SORT OF |
| | BATTERY BACK UP TYPE FIXTURE TO PROVIDE |
| | A MINIMAL AMOUNT OF LIGHT TO ACCESS THE |
| | EGRESS TOWERS . LOCATIONS CAN BE GONE |
| | OVER IN A MEETING WHICH IS MOST CERTAIN |
| | FORTH COMING AFTER ALL REVIEWS ARE |
| | COMPLETED. PLEASE SEE COMMENT FOR |
| | FIXTURES AS THIS COMMENT MAY ALREADY BE |
| | ADDRESSED HOWEVER IS UNCLEAR DUE TO SOME |
| | FIXTURES SHOWN ON PLANS WHICH ARE NOT |
| | LISTED ON FIXTURES SCHEDULE. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE THAT EGRESS CORRIDORS, AND |
| | STAIR TOWERS WILL BE REQUIRED TO CONTAIN |
| | A MIN BATTERY BACK UP TYPE OF FIXTURE |
| | FOR EMERGENCY EGRESS OF 1 FT CANDLE. |
| | 7.9 LS 101 THE TRIPPING OF A SINGLE |
| | SWITCH OR BREAKER SHALL NOT LEAVE ANY |
| | ONE AREA IN TOTAL DARKNESS. |
| | |
| | 9)NOTE: NOTE #9 OK. |
| | |
| | 10)NOTE: NOTE #10 OK. |
| | |
| | 11)NOTE: NOTE #11 OK. |
| | |
| | 12)NOTE:NOTE #12 NO, THIS NOTE COULD |
| | NOT BE LOCATED, ONLY A NOTE WITH |
| | REFERENCE TO POOL PERMIT. |
| | PLEASE PLACE NOTE ON PLANS FOR ALL MIN |
| | CLEARENCES 10' FOR 120V W/ GFI |
| | PROTECTION AND 5' FOR LV. 680.22,411.4. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE NOTE ON PLANS THE MIN |
| | CLEARNECES FOR LT FIXTURES IN PROXIMITY |
| | OF POOL AND WATER FEATURES WATER'S EDGE. |
| | PLEASE SEE A MINOF 10' IS REQUIRED FOR |
| | FIXTURES OVER 30V.411.4 |
| | PLEASE SEE 680.22 FOR A MIN OF 5' FROM |
| | WATER'S EDGE WITH EXCEPTIONS. |
| | |
| | 13)NOTE: NOTE #13 OK. |
| | |
| | 14)NOTE: NOTE #14 OK, REMOVED FROM |
| | PLANS. SEE NEW NOTES. |
| | |
| | 15)NOTE: NOTE #17 OK. MOST ALL FLR |
| | SUBMITTED. PLEASE SEE HOWEVER THERE |
| | STILL APPEARS TO BE A MISSING SHEET FOR |
| | INTERMEDIATE ROOF LAYOUT EAST/ SOUTHEAST |
| | LAYOUT. |
| | |
| | 16)NOTE: NOTE #16 NO, COULD NOT LOCATE |
| | ANY NOTES ON ANY OF THE ROOF TOP PLANS. |
| | NOTE MUST BE ON PLANS. |
| | PLEASE KNOW, THERE ARE MANY "SYSTEMS" |
| | ON THE MARKET BEING PROPOSED AND |
| | ADVERISED AS BEING ACCEPTABLE AND |
| | MEETING CODE ETC. PLEASE KNOW, ONLY |
| | SYSTEMS CONTAINING THE RECOGNIZED UL |
| | LISTINGS/CERTIFICATIONS WHICH ARE UNDER |
| | NFPA-780 WILL BE PERMITTED TO BE |
| | INSTALLED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE NOTE ON ROOF-TOP |
| | PLANS WHICH WILL STATE THAT ANY |
| | LIGHTNING PROTECTION SYSTEMS MUST BE IN |
| | COMPLIANCE WITH NFPA-780. (OR WORDS TO |
| | THAT AFFECT). |
| | |
| | 17)NOTE: NOTE #17 OK. |
| | |
| | 18)NOTE: NOTE #18 NO, PLEASE SEE THERE |
| | ARE AREAS OF PLANS WHICH ARE STILL |
| | MISSING CIRCUITING AND SOME AREAS WHERE |
| | FIXTURES SEEM TO BE "LIGHT" ALTHOUGH AND |
| | CIRCUITING LINE IS SHOWN TO THESE |
| | FIXTURES. |
| | PLEASE SEE REDLINED PLANS. |
| | |
| | **PREVIOUS NOTE ** |
| | PLEASE SEE NO CIRCUITING SHOWN FOR SOME |
| | "HOUSE AREAS". PLEASE SEE REDLINED PLANS |
| | ON 2.32, STORAGE RM ETC. |
| | |
| | 19)NOTE: NOTE #19 NO, PLEASE SEE SOME |
| | ROOMS WHERE RECEPT CIRCUITS FEED MORE |
| | THAN ONE ROOM. |
| | PLEASE SEE REDLINED PLANS. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE 680.23 AND 680.24 WHICH |
| | REQUIRES "NO OTHER" LIGHTING OR RECEPTS |
| | ON ELEVATOR MACHINE RMS CIRUITS OR ELEV |
| | PITS. PLEASE SEE 2.34,2.35 AND ANY OTHER |
| | ARES WHICH MAY BE FED FROM ANY OF THESE |
| | CIRCUITS. |
| | |
| | 20)NOTE: NOTE 320 OK, HOWEVER SEE SOME |
| | NEW NOTES FOR CIRCUITING NOW THAT |
| | CIRCUITS ARE SHOWN. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SHOW CIRCUITING FOR ALL UNITS AND |
| | CORRELATE WITH THE PANEL SCHEDULES |
| | SUBMITTED. PLEASE KNOW, CODE COMPLIANCE |
| | FOR SOME ITEMS CAN NOT BE DONE AT THIS |
| | TIME. |
| | |
| | 21)NOTE: NOTE #21 NO/YES, PLEASE SEE |
| | MOST WERE ADDRESSED, HOWEVER PLEASE SEE |
| | NOW UNTI B2 INDICATES 60A OCP FOR 5KW |
| | UNIT. |
| | PLEASE ALSO CORRELATE ALL KW HEAT STRIPS |
| | WITH MECHANICAL PLANS AND ADJUST LOADS |
| | AS ALL UNITS ON "M" SHEETS ARE SHOWN W/ |
| | 5KW HEAT. |
| | |
| | ** PREVIOSU NOTE ** |
| | PLEASE SEE 424.3B FOR MIN OCP FOR AHU'S |
| | AND HEAT. |
| | PLEASE SEE MANY PANEL SCHEDULES INDICATE |
| | LOADS AT 11KW ETC @65%?? PLEASE CLARIFY |
| | AS 11KW SI SHOWN AS THE DERATED LOAD. |
| | PLEASE SEE IF 11KW IS THE DE-REATED |
| | LOAD, THEN THE ACTUAL KW RATING FOR AHU |
| | WOULD BE ALMOST 15KW?? |
| | |
| | |
| | 22)NOTE: NOTE #22 OK. |
| | |
| | 23)NOTE: NOTE #23 OK. |
| | |
| | 24)NOTE: NOTE #24 OK,HOWEVER SEE NOTES. |
| | |
| | 25)NOTE: NOTE #25 OK. |
| | |
| | 26)NOTE: NOTE #26 NO, PLEASE SEE PLANS |
| | STILL MENTIONS TO USE 310.15B, HOWEVER |
| | PLEASE KNOW, "B6" CAN NOT BE SUED IN |
| | DERATING. |
| | PLEASE ALSO SEE NEW NOTE MENTIONS THE |
| | CONTRACTOR MAY SUBSTITUTE W/ ALUM. |
| | PLEASE KNOW, THE CONTRACTOR MAY NOT MAKE |
| | THIS DECISION OR REVISION. PLEASE KNOW |
| | ONLY THE DESIGNER AND ENGINEER OF RECORD |
| | CAN MAKE ANY CHANGES TO CONDUCTORS WHICH |
| | MUST BE PROPOSED IN A REVISION, SIGNED |
| | DATED, SEALED AND SUBMITTED FOR REVIEW |
| | BEFORE CHANGES CAN BE MADE ON THE |
| | JOBSITE. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE NOTE #8, ON PANEL SCHEDULE |
| | NOTES. PLEASE SEE 310.15B6, WHICH DOES |
| | NOTES INLCUDE 120/208V SYSTEMS.THIS IS |
| | FOR INFORMATION ONLY. |
| | |
| | 27)NOTE: NOTE #27 OK. |
| | |
| | 28)NOTE: NOTE #28 OK. |
| | |
| | 29)NOTE: NOTE #29 OK, HOWEVER SEE NOTES |
| | FOR 210.52/210.52C1 REDLINED |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE UNIT A-8 FOR MISSING RECEPT |
| | PER 210.52. PLEASE BE SURE TO CHECK |
| | REDLINED PLANS FOR ANY OTHER POSSIBLE |
| | LOCATIONS WHICH MAY REQUIRE A RECEPT. |
| | |
| | 30)NOTE: NOTE #30 OK. |
| | |
| | 31)NOTE: NOTE #31 OK. |
| | |
| | 32)NOTE: NOTE #32 OK. |
| | |
| | 33)NOTE: NOTE #33 OK, HOWEVER SEE NEW |
| | NOTES FOR CORRELATION OF NOTES AND |
| | RISER. |
| | |
| | 34)NOTE: NOTE #34 OK, HOWEVER SEE NEW |
| | NOTES DUE TO CHANGES IN RISER/PLANS. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE COMPLETE RISER DIAGRAM WITH |
| | LABELING OF FEEDERS FOR FEEDER SCHEDULE |
| | AND CORRELATING ALL NUMERCICAL |
| | IDENTIFICATION. |
| | |
| | 35)NOTE: NOTE #35 OK. |
| | |
| | 36)NOTE: NOTE #36 NO, NO SUBMITTIALS |
| | WERE SUBMITTED FOR REVIEW. PLEAS EKNOW, |
| | SPECS FOR THESE ITEMS MUST BE SUBMITTED |
| | TO REVIEW FOR CODE COMPLIANCE. PLEASE |
| | SEE THERE ARE MANY ITEMS IN NFPA-20 |
| | CHAPTER 6 AND NFPA-110 WHICH CAN NOT BE |
| | VERIFIED AT THIS TIME AND FURTHER |
| | COMMENTS MAY ARISE AS CODE COMPLIANCE |
| | CAN NOT BE DONE AT THIS TIME. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT ALL INFORMATION |
| | FOR FIRE PUMP AND FIRE PUMP CONTROLLER. |
| | PLEASE ALSO PROVIDE MANUFACTURES |
| | SPECS/CUT SHEETS FOR ABOVE. |
| | |
| | 37)NOTE: NOTE #37 NO, PLEASE SEE NO |
| | SPECS WERE SUBMITTED. PLEASE ALSO SEE |
| | RISER INDICATES THE 4-POLE ATS, HOWEVER |
| | NOTES MENITON THIS IS NOT A SEPARATELY |
| | DERIVED GENERATOR? PLEASE SEE AS A |
| | 4-POLE ATS, THE GEN IS "SEP DERIVED" AND |
| | GROUNDING SHALL BE DONE ACCORDINGLY. |
| | PLEASE SEE MISSING BONDING AT FIRST |
| | MENAS OF DISCONNECT , EQUIPMENT GROUNDD |
| | ETC. PLEASE SEE NFPA-110 6.2.15*. PLEASE |
| | VERIFY WITH MANUFACTURE OF EQUIPMENT. |
| | PLEASE SEE NEW NOTES FOR ATS AND MAIN. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT ALL INFORMATION |
| | FOR GENERATOR/ ATS. PLEASE SUBMIT THE |
| | SPECS/CUT FROM MANUFACTURE. |
| | PLEASE VERIFY OF THE ATS WILL BE A |
| | 4-POLE SWITCH. |
| | PLEASE SEE 700.7D AND IF YOU HAVE THE |
| | HANDBOOK, SEE EXPLANATION OF ARTICLE. |
| | I HAVE ATTACHED BOTH, JUST IN CASE. |
| | |
| | (D) GROUND FAULT. TO INDICATE A GROUND |
| | FAULT IN SOLIDLY GROUNDED WYE |
| | EMERGENCY SYSTEMS OF MORE THAN 150 VOLTS |
| | TO GROUND AND CIRCUIT-PROTECTIVE |
| | DEVICES RATED 1000 AMPERES OR MORE. THE |
| | SENSOR FOR THE GROUND-FAULT SIGNAL |
| | DEVICES SHALL BE LOCATED AT, OR AHEAD |
| | OF, THE MAIN SYSTEM DISCONNECTING |
| | MEANS FOR THE EMERGENCY SOURCE, AND THE |
| | MAXIMUM SETTING OF THE SIGNAL |
| | DEVICES SHALL BE FOR A GROUND-FAULT |
| | CURRENT OF 1200 AMPERES. INSTRUCTIONS |
| | ON THE COURSE OF ACTION TO BE TAKEN IN |
| | EVENT OF INDICATED GROUND FAULT |
| | SHALL BE LOCATED AT OR NEAR THE SENSOR |
| | LOCATION. |
| | |
| | ALTHOUGH 700.26 INDICATES THAT |
| | GROUND-FAULT PROTECTION OF EQUIPMENT IS |
| | NOT |
| | REQUIRED ON THE ALTERNATE SOURCE FOR |
| | EMERGENCY SYSTEMS, GROUND FAULTS CAN |
| | OCCUR ON SUCH SYSTEMS, AND THEY CAN |
| | RESULT IN EQUIPMENT BURNDOWN. BECAUSE |
| | OF THE EMERGENCY NATURE OF SUCH SYSTEMS, |
| | AUTOMATIC DISCONNECT IN THE EVENT |
| | OF A GROUND FAULT IS INAPPROPRIATE. |
| | DETECTION OF SUCH A FAULT, HOWEVER, IS |
| | DESIRABLE SO THAT THE CONDITION CAN BE |
| | CORRECTED. |
| | IN MY READING AND THE INFORMATION FROM A |
| | COULE OF MANUFACURES OF ATS SWITCHES, A |
| | 4-POLE ATS IS REQUIRED. PLEASE RESERCH |
| | THE INFORMATION AND ADJUST. |
| | |
| | 38)NOTE: NOTE #38, OK.P |
| | |
| | 39)NOTE: NOTE #39 YES/ NO, PLEASE NOW |
| | SEE TWO SETS OF DRAWING KEYNOTES, WHICH |
| | AS NOTED IN ONE SET MOST DO NOT |
| | CORRELATE WITH RISER DIAGRAM. PLEASE SEE |
| | SOME COMMENTS FOR OTHER. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE COMPLETE DRAWING KEYNOTES TO |
| | CORRELATE WITH PLANS. |
| | |
| | 40)NOTE:NOTE #40 OK, PLEASE SEE SEC'S |
| | ARE NOW SHOWN AS UNDER GROUND. SEE NEW |
| | NOTES FOR ROOM LAYOUT. |
| | |
| | **PREVIOUS NOTE **PLEASE VERIFY RISER |
| | DIAGRAM SEC'S AND CONDUITS FOR FIRE |
| | PUMP, RISER APPEARS TO SHOW FEED |
| | OVERHEAD? |
| | PLEASE SEE NFPA-20, 70 WHICH REQUIRES |
| | COMPLETE ENCASEMENT OF FEEDS. |
| | |
| | 41)NOTE: NOTE #41 OK, PLEASE SEE MORE |
| | INFORMATION ON PLANS WAS COMPLETED AND |
| | SUBMITTED FOR REVIEW, PLEASE SEE ANY NEW |
| | COMMENTS FOR REVIEW. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE COMPLETE ALL PANELS, WITH |
| | INFORMATION ON PANELS, SIZE, MLO, |
| | MCB ETC. |
| | PLEASE COMPLETE LOAD CALCULATIONS FOR |
| | REVIEW. |
| | |
| | 42)NOTE: NOTE #42 ?? NO?, PLEASE SEE |
| | PLANS NOTE WIND LOAD PRESSURES TO MEET |
| | 140 MPH, HOWEVER IT IS NOT KNOWN WHERE |
| | THESE ARE FOR REVIEW. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE WIND LOAD |
| | CALCUALTIONS FOR BLDG REVIEW OF ANY SITE |
| | LIGHTING/ROOF TOP LT POLES. |
| | |
| | ************************************** |
| | ************************************* |
| | ********* NEW NOTES ***************** |
| | |
| | |
| | 43) NOTE: PLEASE KNOW, A FULL AND |
| | COMPLETE TYPE WRITTEN RESPONSE FROM THE |
| | DESIGN TEAM WHICH RESPONSES TO THE PLANS |
| | REVIEWERS COMMENTS WILL HELP IN |
| | EXPEDITING THE PLAN REVIEW PROCESS. THIS |
| | NUMERICAL REPONSE WILL HELP TO |
| | ALLEAVIATE ANY BACK AND FORTH QUESTIONS |
| | OR CONFUSION. |
| | NO, RESPONSE LETTERS WERE SUBMITTED WHEN |
| | PLANS WERE BROUGHT BACK FOR REVIEW. |
| | |
| | 44) NOTE: PLEASE SEE ALL PLANS, SHEETS, |
| | DOCUMENTS BEING SIGNED, DATED OR SEALED |
| | BY A LICENSED PE, SHALL ONLY CONTAIN A |
| | SEAL WITH THE WORDING OF "LICENSE". |
| | PLEASE SEE A RULING BY THE FLORIDA BOARD |
| | OF PROFESSINAL ENGINEERS DATED IN |
| | FEBUARY "04", RULED IN 61G15-23.001, |
| | THAT ALL SEALS SHALL NO LONGER USE |
| | "CERTIFICATE" IN SAID SEAL. PLEAS KNOW, |
| | AN EXTENSION WAS GIVEN TO THE DATE OF |
| | DEC. 31ST , 2005.PLEASE SEE THIS IS |
| | NOT A COMMENT FOR STEVEN FELLER AS SEAL |
| | IS CORRECT. PLEASE SEE OTHER DOCUMENTS |
| | SUBMITTED DO CONTAIN THE SEAL WHICH IS |
| | NO LONGER ACCEPTABLE. |
| | PLEASE SEE DE LOS REYES ENG.AND ANY |
| | OTHERS WHICH MAY STILL BE UTILIZING OLD |
| | SEAL. |
| | PLEASE KNOW, THIS COMMENT IS MADE FOR |
| | ALL PLANS AND DOCUMENTS WHETHER OR NOT |
| | COMMENT IS MADE BY OTHER REVIEWER(S). |
| | |
| | 45) NOTE: PLEASE SEE FBC 2004 CHAPTER |
| | 13, 13-415.1.ABC.1.1, &.2, &.3. |
| | PLEASE SHOW AND PROVIDE DEVICES, |
| | CONTROLS ETC FOR ALL AREAS NOW REQUIRED |
| | TO CONTAIN ENERGY CONSERVATION MEASURES. |
| | PLEASE SEE 13-413.1ABC.1 AND PROVIDE |
| | NOTES/WORST CASE FOR VOLTAGE DROP. |
| | PLEASE SEE 13-415.1.ABC.2 FOR AREA |
| | LIGHTING. |
| | PLEASE SEE THESE CHANGES ARE COMPLETELY |
| | DIFFERENT FORM THE 2001 FBC. |
| | THESE CHANGES BECAME FEDERALLY MANDATED |
| | FOR ALL STATES TO COMPLY IN THE NEXT |
| | CODE CYCLE/CHANGE. THIS FEDERAL MANDATE |
| | WAS PASSED JULY 2004 |
| | PLEASE SEE NOTE #1 FROM PREVIOUS REVIE |
| | MENTIONED TO SEE ALL 2004 FBC FOR ALL |
| | CHANGES IN DESIGN AS PROJECT WAS NOT |
| | SUBMITTED FOR PERMIT UNDER THE 2001 FBC. |
| | |
| | 46) NOTE: PLEASE SEE NFPA-110,7.3.3 FOR |
| | MIN LIGHTING LEVELS IN GENERATOR ROOM TO |
| | BE 30FT CANDLES. PLEASE SEE |
| | PHOTO-METRICS FOR THIS AREA SHOULD BE |
| | SHOWN. |
| | |
| | 47) NOTE: |
| | A) PLEASE SEE NFPA-110, 7.9.3.1, |
| | GALVANIZED LINES SHALL NOT BE USED FOR |
| | PIPNG TO GENERATOR. THIS IS NOTED FOR |
| | PLUMBING/ ENGINEERING AS SOME LOCATIONS |
| | IN THE JURISDICTION HAS INSTALLED THESE |
| | AND HAVE HAD TO CHANGE TYPES OF PIPING. |
| | PLEASE KNOW THIS IS A NOTE AT THIS TIME |
| | FOR INFORMATIONAL PURPOSE ONLY. |
| | B) PLEASE ALSO SEE NFPA-20, NFPA-110 , |
| | NOTES AND SPECS FOR FUEL TYPE AND |
| | STORAGE WAS NOTE SUBMITTED, PLEASE SEE |
| | MIN RUNNING TIME CAN NOT BE VERIFIED. |
| | PLEASE SEE 6-6.2 FOR A MIN OF 8 HRS |
| | @100% ALONG WITH ALL OTHER MIN REQUIRED |
| | LIFE SAFETY LOADS. |
| | THE AMOUNT OF FUEL, AND GPH SHOULD BE |
| | NOTED ON PLANS. ONE OF THE DRAWING KEY |
| | NOTES MENTIONS 500 GAL TANK?TBD. |
| | |
| | 48) NOTE: PLEASE SEE THERE ARE FIXTURES |
| | ON PLANS WHICH ARE NOTE ON FIXTURE |
| | SCHEDULE? R-1, R-2, W-1,, |
| | |
| | 49) NOTE: PLEASE SEE SOME FIXTURES ON |
| | PLANS DO NOT CONTAIN FIXTURE |
| | DESIGNATIONS. |
| | "REDLINED ON PLANS" |
| | |
| | 50) NOTE: PLEASE SEE LAYOUT ON MEZZ LVEL |
| | FOR DOM PUMP RM AND FIRE PUMP RM. PLEASE |
| | SEE THESE SEEM TO BE MISSING |
| | WALLS/SEPARATION FROM GARAGE/RAMP |
| | AREAS.? 2.05 |
| | 215.5 |
| | |
| | 51) NOTE:PLEASE INDICATE IF GHB |
| | CONTAINS "FEED-THRU LUGS" OR DOES THIS |
| | PANEL CONTAIN OCP TO FEED "GHB2"? |
| | 215.5 |
| | |
| | 52) NOTE: PLEASE SEE "LA", DOES THIS |
| | PANEL ALSO CONTAIN "FEED-THRU LUGS" OR |
| | DOES IT CONTAIN OCP TO FEED"LA2"? |
| | IF SO, PLEASE INDICATE THE OCP AND AWG |
| | SIZES. |
| | 215.5 |
| | |
| | 53) NOTE: PLEASE SEE CORRELATION FOR |
| | "KEYNOTES" AS RISER CONTAINS #11,10, |
| | 12,13 ETC WHICH DO NOT MATCH AS NOTED |
| | ABOVE. |
| | |
| | 54) NOTE: PLEASE SEE PANELS "HB", LB", |
| | AND TRANSFORMER, AS LAYOUT DOES NOT SEEM |
| | TO MEET 110.26 |
| | 4.01 |
| | |
| | 55) NOTE: PLEASE SEE PREVIOUS NOTE WITH |
| | RESPECT TO THE ATS AND 4-POLE, |
| | SEPARATELY DERIVED SYSTEM. |
| | PLEASE SEE 250.6,250.24B AND 250.122 FOR |
| | SIZING ANY EQUIPMENT GORUNDING |
| | CONDUCTORS. |
| | |
| | 56) NOTE: PLEASE SEE DINING AREAS IN |
| | A4A, A5, C1 WHICH SHOW RECEPT ON LIVING |
| | RM CIRCUIT. |
| | 210.52B1 |
| | PLEASE VERIFY ALL DINING AREAS AS SHOWN |
| | AS IDENTIFY AS NEEDED FOR AREA |
| | DESIGNATIONS. MOST ARE OK. |
| | SEE REDLINED. |
| | |
| | 57) NOTE: PLEASE SEE AREA IN UNIT "B3" |
| | WHICH SEEMS TO SHOW COUNTERSPACE AND |
| | WALL AREA ? |
| | PLEASE SEE 210.52 IF WALL , AND 210.52C1 |
| | IF COUNTER SPACE. (GFI)210.8A6 |
| | |
| | 58) NOTE: PLEASE SEE LOAD SUMMARY FOR |
| | FIRE PUMP ON RISER WHICH CONTAINS AN "*" |
| | ASTERISK FOR NOTE OF MAGNETIC ONLY 6X |
| | LR, HOWEVER THIS "*" IS NOT ABOVE FOR |
| | FIRE PUMP. SEE REDLINES THIS IS NOTED AS |
| | PLANS ARE COMING BACK FOR COMMENTS. |
| | |
| | 59) NOTE: PLEASE SEE EM MAIN SHOLD NOT |
| | BE LOCATED DIRECTLY NEXT TO EXISTING |
| | MAIN DISTRIBTUTION EQUIPMENT. THIS MAY |
| | BE IN THE SAME ROOM, HOWEVER SHOULD BE |
| | LOCATED ON THE OTHER SIDE OF ROOM. |
| | PLEASE SEE IF THE ATS IS 4-POLE AND |
| | SERVICE ENTRANCE RATED, THE MSBE WOULD |
| | NOT BE NEEDED, THE EDPH COULD CONTAIN A |
| | MCB AND WOULD MEET THE NEC. |
| | PLEASE KNOW, IN EITHER CASE A MEANS OF |
| | DISCONNECT ON THE LOAD OR LINE SIDE OF |
| | ATS FOR FEED COMING FROM GENERARATOR |
| | WOULD BE NEEDED GROUPED IN CLOSE |
| | PROXIMITY TO THE ATS, EM MAIN. PLEASE |
| | CALL TO GO OVER. SOME ITEMS ARE NOT |
| | KNOWN AT THIS TIME. |
| | |
| | 60) NOTE: PLEASE SEE RISER AND OTHER |
| | PANELS INDICATE PANELS "HP AND LP" , |
| | HOWEVER NEITHER OF THESE ARE SUBMITTED |
| | TO VERIFY AT THIS TIME. PLEASE SHOW. |
| | 215.5 |
| | |
| | 61) NOTE: PLEASE PROVIDE ELEVATION FOR |
| | EPSS. PLEASE SEENFPA-110 7.2.3*,THE |
| | ELEVATION OF THE EPSS SHALL BE 6" ABOVE |
| | THE "SLOSH" PREDICATION LEVELS. |
| | "SEA, LAKE, OVERLAND SURGES BY |
| | HURRICANCES. CHARTS BASED ON SURGES FROM |
| | A CAT 4 STORM. |
| | |
| | 62) NOTE: WHEN AND BEFORE RESUBMITTING |
| | PLANS, PLEASE COMPLETELY REMOVE ANY AND |
| | ALL OLD/VOIDED SHEETS FROM SETS. PLEASE |
| | ONLY INSERT ONLY NEW REVISED SHEETS INTO |
| | COMPLETE SETS FOR REVIEW AND STMAPING. |
| | PLEASE KNOW, THIS WAS DONE ON THIS |
| | SUBMITTAL. |
| | |
| | ** PLEASE SEE LOCATIONS ON PLANS IN |
| | WHICH MANY OF THE ABOVE ITEMS HAVE BEEN |
| | REDLINED AT LOCATIONS OF COMMENTS. |
| | |
| | ** PLEASE BE AWARE OF ANY COMMENTS FROM |
| | OTHER REVIEWER(S) WHICH MAY HAVE AN |
| | AFFECT ON ELECTRICAL PLANS. |
| | |
| | ** PLEASE SUBMIT COMPLETED PLANS FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | ** |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| 2006-05-04 00:00:00 | ROLLS OF MEP IN ELEC FOR REVIEW TO |
| | COMMENCE. |