| 2008-04-18 13:37:50 | ** DENIEDREVIEW OF REVISIONS ** |
| | |
| | THE FOLLOWING IS FOR ELECTRICAL REVISIONS SUBMITTED |
| | 3/19/08 AND 4/7/08. |
| | |
| | 1) NOTE: PLEASE COORDINATE ALL REVISIONS ALONG WITH |
| | REVISED TITLE BLOCKS AND REVISIONS ON PLANS. |
| | FOR EXAMPLE: |
| | PLEASE SEE SHEETS E0.01, E5.1 ETC WHICH ARE SIGNED, |
| | DATED AND SEALED ABOUT 3WEEKS APART YET THE PLANS ARE |
| | THE SAME. THESE SHEETS SHOW THE SAME EXACT REVISIONS. |
| | SHEET E0.01 DATED 3/17/08 ARE SHOWING REVISIONS 16 AND |
| | 17 AND REVISED SHEET E0.01 DATED 4/3/08 SHOW THE SAME. |
| | |
| | THIS IS THE SAME FOR SOME OF THE OTHER SHEETS AS WELL. |
| | PLEASE GO THOUGH BOTH SETS, REVISE PLANS, TITLE BLOCKS |
| | AND SUBMIT COMPLETED SETS FOR REVIEW. |
| | ** PLEASE KNOW ANY OTHER REVIEW COMMENTS FOR FEEDERS |
| | ETC SHOULD BE INCORPORATED INTO CHANGES. |
| | |
| | 2) NOTE: PLEASE SEE THIS REVIEWER'S PREVIOUS COMMENT |
| | WITH RESPECT TO GROUND FAULT PROTECTION ON MAINS AND |
| | OTHER EQUIPMENT WAS THAT THE EDPH WAS NOT TO CONTAIN |
| | GFP. NOW THE MSBE HAS THE GROUND FAULT PROTECTION |
| | REMOVE WHICH WAS LOCATED ON ORIGINAL PLANS. |
| | PLEASE SEE 240.13, 230.95 ETC WHICH DOES REQUIRE GFP ON |
| | THE MAIN. THE CODE DOES NOT REQUIRE GFP ON THE |
| | EQUIPMENT AFTER THE MAIN IN THIS SITUATION. THERE ARE |
| | SOME CIRCUMSTANCES IN THE CODE WHICH DOES REQUIRE GFP |
| | ON THE EQUIPMENT AFTER THE MAIN HOWEVER NOT ON THE |
| | EMERGENCY SIDE AND NOT IN THIS OCCUPANCY. |
| | PLEASE PLACE THE GFP BACK ON MSBE AND PLEASE BE SURE |
| | GFP IS NOT ON EDPH. |
| | IF THERE ARE ANY QUESTIONS ON THIS PLEASE CONTACT THIS |
| | OFFICE. |
| | |
| | 3) NOTE: PLEASE KNOW THE REVISED ENERGY CALCULATIONS |
| | SUBMITTED WERE NOT REVIEWED. THESE ARE CONSIDERED A |
| | REVISION AND WOULD BE SUBMITTED ACCORDINGLY. |
| | BASED ON THE FACT THAT THERE ARE CHANGES BEING MADE TO |
| | PLANS AND PROJECT THE REVISED CALCULATIONS SHOULD ONLY |
| | BE SUBMITTED FOR FINAL REVIEW ONCE *ALL* CHANGES TO |
| | PROJECT ARE KNOWN AND WILL BE THE FINAL REVISION BEFORE |
| | FINAL/CO. |
| | PLEASE CALL IF THERE ARE ANY QUESTIONS ON THIS. |
| | ** PLEASE ALSO KNOW THAT ANY REVISED ENERGY |
| | CALCULATIONS WILL ALSO BE REVIEWED BY MECHANICAL, |
| | BUILDING AND POSSIBLY PLUMBING. PLEASE BE SURE ALL |
| | PLANS FOR OTHER TRADES HAVE BEEN UPDATE TO THE POINT |
| | FOR FINAL REVIEW SO THE PLANS ON FILE WILL COORDINATE |
| | WITH CALCULATIONS. |
| | |
| | |
| | |
| | ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY |
| | COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE |
| | DO NOT HESITATE IN CONTACTING THIS OFFICE. |
| | PLEASE SEE BELOW FOR CONTACT INFORMATION. |
| | |
| | ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR |
| | CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL |
| | OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS |
| | INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT |
| | LEAVE ANY OLD/VOIDED SHEETS IN SETS. |
| | PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY |
| | ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS, |
| | SPEC/CUT SHEETS, CALCULATIONS ETC SHOULD BE PLACED INTO |
| | TWO SETS/FOLDERS/BINDERS ETC. |
| | PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS |
| | SHOULD BE SUBMITTED FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY |
| | DELAYS. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |