| 2007-09-22 18:53:16 | ** DENIED REVISIONS ** |
| | |
| | |
| | ** PLEASE SEE REVISIONS DATED THE SAME DATE OF 9/22/07 |
| | WHICH NOTES WERE PROVIDED ON REVISIONS SUBMITTED ON |
| | 8/23/07. |
| | PLEASE SEE SOME ITEMS BELOW FOR REVISIONS SUBMITTED |
| | 9/20/07 NEED TO BE ADDRESSED. |
| | |
| | 1) NOTE: PLEASE SEE THESE REVISIONS INDICATE A NEW 2500 |
| | GALLON CON-VAULT YET NO PLANS OR SUBMITTALS COULD BE |
| | FOUND REVISING THESE ITEMS. |
| | PLEASE KNOW ANY MANUFACTURES SPECS/CUT SHEETS FOR FUEL |
| | TANK WILL BE REQUIRED TO BE REVIEWED BY FIRE AND |
| | MECHANICAL REVIEWERS. |
| | PLEASE ALSO KNOW REVISED PLANS FOR LOCATION ETC WILL |
| | NEED TO BE SUBMITTED. |
| | |
| | 2) NOTE: THE NEW PLANS INDICATE THE GENERATOR WILL BE |
| | OPERATING AT A REDUCED LOAD FOR THE EXTENDED TIMES AS |
| | LISTED. THERE ARE SEVERAL ITEMS ON PANELS WHICH |
| | INDICATE A REDUCED LOAD HOWEVER NO DETAILS ON HOW THESE |
| | LOADS WILL BE SHED FROM THE PANEL(S) OR THE GENERATOR |
| | WAS SUBMITTED. |
| | HOW WILL LOADS BE TAKEN FROM THE PANELS? |
| | HOW WILL FANS, EXHAUST ETC BE SHED AND WILL THESE |
| | SYSTEMS FOR VENTILATION STILL BE OPERABLE IN THE EVENT |
| | OF LEVELS OF AIR GO INTO HIGH LEVELS ETC. |
| | PLEASE PROVIDE MORE INFORMATION ON SYSTEMS, WIRING, |
| | DETAILS, SHEDDING OF LOADS DOWN TO THE 255 AS NOTED |
| | ETC. |
| | FBC 106.1.2 ADMIN SECTION FOR INFORMATION NEEDED. |
| | |
| | 3) NOTE: PLEASE SEE THE FEEDERS ON FEEDERS SCHEDULE FOR |
| | F-9 ARE NOT OF SUFFICIENT SIZE FOR THE 800AMP BREAKER |
| | AS SHOWN FROM GENERATOR. |
| | 240.4, 310.16. |
| | PLEASE ALSO VERIFY THE NEW ALUM FEEDERS FOR F-8 WHICH |
| | IS ONLY RATED FOR 205AMPS PER 310.16 AND BREAKER OVER |
| | CURRENT PROTECTION IS 250AMPS. |
| | |
| | 4) NOTE: PLEASE SEE THE EQUIPMENT GROUNDING CONDUCTOR |
| | AS SHOWN FOR THE FEEDERS FROM MSBE TO EDPH IS SHOWN AS |
| | 2/0 ON RISER AND 1/0 ON MSBE SCHEDULE. |
| | PLEASE SEE THE 2/0 ON RISER IS OK, HOWEVER THE 1/0 IS |
| | NOT LARGE ENOUGH PER 250.122. |
| | PLEASE ADJUST. |
| | |
| | |
| | ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| | COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| | THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| | NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| | REVIEWER. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |