Plan Review Notes
Plan Review Notes For Permit 05091265
Permit Number 05091265
Review Stop M
Sequence Number 11
Notes
Date Text
2007-10-21 17:04:17REV.13 AND REV.15
  
 FBC 2004 CODE FAMILY W/ 2005 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 THE FOLLOWING PAGES WERE REVIEWED FOR CODE COMPLIANCE
 WITH ONE COPY RETAINED TO BE INCLUDED IN PERMIT SET OF
 PLANS:
 M2.09
 M2.12
 M2.15
 M2.18
 M2.21
 M2.24
 M2.27
 M2.30
 M6.01
  
 THE REMAINING PAGES FROM REV.13 AND REV.15 ARE DENIED
 AND RETURNED WITH COMMENTS TO FOLLOW. TWO DIFFERENT
 SETS OF REVISIONS WERE SUBMITTED FOR REVIEW: REV.13 AND
 REV.15. PAGES M0.00, 2.01, 2.04, 2.31, 2.32, 5.02 HAVE
 BEEN REMOVED FROM REV.13 SUBMITTAL AND REPLACED BY
 REV.15. ALL CHANGES FROM BOTH REVISIONS WILL BE
 COMPARED TO THE PERMIT PLANS AND BE REVIEWED FOR CODE
 COMPLIANCE AS WELL AS FOR RESPONSES TO PREVIOUS REVIEW
 COMMENTS DATED 6/26/07.
  
 THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH
 PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN
 RESPONSES FOR THE PURPOSE OF CONTINUITY. NEW COMMENTS
 GENERATED BY ADDITIONAL CHANGES IN THESE REVISIONS WILL
 APPEAR AT THE END OF REVIEW AND BE GIVEN LETTER, RATHER
 THAN NUMBER, DESIGNATIONS.
  
 1 THROUGH 4: OK
  
 5. M2.01: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
  
 6. M2.01: PROVIDE WALL MOUNTING DETAIL WHICH WORKS IN
 CONJUNCTION WITH MANUFACTURER'S INSTALLATION
 INSTRUCTIONS RELATED TO AIRFLOW AND SERVICE CLEARANCES.
 FBC,M 303.1 AND 303.4
  
 7. M2.02: A) NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
 B) PROVIDE WALL MOUNTING DETAIL WHICH WORKS IN
 CONJUNCTION WITH MANUFACTURER'S INSTALLATION
 INSTRUCTIONS RELATED TO AIRFLOW AND SERVICE CLEARANCES.
 FBC,M 303.1 AND 303.4
  
 8. M2.02: THE DESIGNATION OF THIS ROOM HAS BEEN CHANGED
 TO "STORAGE 014" ON PG A1.1. PLEASE COORDINATE
 DRAWINGS. FBC 106.1.1.
  
 9 THROUGH 11: OK
  
 12. M2.04: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
  
 13. M2.04: A) WRITTEN RESPONSE FROM DESIGNER (DRAFTED
 8/7/07, PRIOR TO THIS REVISION) INDICATES "NATURAL
 VENTILATION" WILL BE USED FOR THE REMOVAL OF SMOKE IN
 THE LOBBY AREA. HOWEVER, M2.04 SHOWS PORTIONS OF THE
 LOBBY AREA PROVIDED WITH MECHANICAL SMOKE CONTROL
 PROVIDED BY THE EXHAUST METHOD. SMOKE CONTROL NOTE ON
 M0.00 AND M2.01 IS CLAIMING 412.5 OF THE 2001 FBC FOR
 USE OF "NATURAL VENTILATION" AS SMOKE CONTROL. THAT
 CODE SECTION IS NOT APPLICABLE TO THIS PERMIT AS THIS
 JOB IS UNDER THE 2004 FBC W/ 2005 REVISIONS. UNDER THIS
 CODE, FBC 403.15 (HIGH RISE BUILDINGS) REQUIRES SMOKE
 CONTROL BE PROVIDED IN ACCORDANCE WITH FBC SEC.909.
 THIS SECTION ALLOWS FOR THREE POSSIBLE METHODS OF SMOKE
 CONTROL. SEE FBC 909.6 THROUGH 909.8. GIVEN THAT A
 "NATURAL VENTILATION" METHOD IS NOT LISTED IN THE 2004
 FBC, THERE ARE SEVERAL AREAS OF THE BUILDINGWHICH ARE
 NOT PROVIDED WITHSMOKE CONTROL. SHOW ON PLANS HOW
 AREAS PREVIOUSLY COVERED BY "NATURAL" MEANS WILL NOW BE
 COVERED AS REQUIRED BY FBC 909. HAS A RATIONAL ANALYSIS
 FOR THE SYSTEM BEING USED BEEN PREPARED AND SUBMITTED
 AS PART OF THE PERMIT RECORD? PLEASE SEE FBC 909.2 AND
 909.4 FOR SPECIFIC REQUIREMENTS.
 B) IS AHU 12 AND RELATED SUPPLY DUCTWORK TO BE USED AS
 PART OF THE SMOKE CONTROL SYSTEM FOR THE LOBBY AREA?
 DUCTS SHALL BE CONSTRUCTED TO MEET THE REQUIREMENTS OF
 FBC,M 513.10.2 AND FANS SHALL COMPLY WITH FBC,M
 513.10.5. SHOW COMPLIANCE WITH THESE SECTIONS.
  
 14. M2.05: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
  
 15. M2.05: SEE COMMENT 13 ABOVE RELATED TO SMOKE
 CONTROL REQUIREMENTS.
  
 16 AND 17: OK
  
 18. M2.07: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
  
 19. M2.07: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON
 FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 20. M2.08: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5 INCLUDING FOR CU-19. ALSO, PROVIDE WALL
 MOUNTING DETAIL WHICH WORKS IN CONJUNCTION WITH
 MANUFACTURER'S INSTALLATION INSTRUCTIONS RELATED TO
 AIRFLOW AND SERVICE CLEARANCES. FBC,M 303.1 AND 303.4
  
 21. M2.08: SE-2 AND SE-3 INTAKE AND OA-4 OUTLET DUCTS
 ARE SHOWN WITH FIRE DAMPERSAT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 22 AND 23: OK
  
 24. M2.10: A) NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5.
 B) 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON FLOOR
 PLAN WITH FIRE DAMPERS AT RATED WALL PENETRATIONS.
 WHERE THE INSTALLATION OF A FIRE DAMPER WILL INTERFERE
 WITH THE OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM
 IN ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE
 PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M
 607.2.1.
  
 25. OK
  
 26. M2.11: SE-2 AND SE-3 INTAKE AND OA-4 OUTLET DUCTS
 ARE SHOWN WITH FIRE DAMPERSAT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 27. M2.13: NO BOLLARDS ARE SHOWN ON MECHANICAL OR
 ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4
 AND 304.5. ALSO, 24X8 SMOKE EXHAUST DUCTS FROM RISER
 SE-1 ON FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 28. M2.14 AND M2.17: NO BOLLARDS ARE SHOWN ON
 MECHANICAL OR ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH
 FBC,M 303.4 AND 304.5 INCLUDING FOR CU-19. ALSO, SE-2
 AND SE-3 INTAKE AND OA-4 OUTLET DUCTS ARE SHOWN WITH
 FIRE DAMPERSAT RATED WALL PENETRATIONS. WHERE THE
 INSTALLATION OF A FIRE DAMPER WILL INTERFERE WITH THE
 OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM IN
 ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE
 PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M
 607.2.1.
  
 29 AND 30: OK
  
 31. M2.17: PROVIDE DETAIL AND LISTED ASSEMBLY
 (THROUGH-PENETRATION FIRESTOP SYSTEM) TO BE USED FOR
 TYPE-B FLUE PIPE. ALSO, FIRE DAMPER FOR EXHAUST DUCT IS
 NOT SHOWN ON PLANS. SEE FBC,M 607.8.
  
 32. M2.17: BOILER ROOM CALCULATIONS CALL FOR 1 SQ.IN.
 PER 2000 BTU/H. THIS METHOD REQUIRES TWO PERMANENT
 OPENINGS COMMUNICATING DIRECTLY WITH THE OUTDOORS, EACH
 WITH MIN. 525 SQ.IN. FREE AREA, BASED ON TH 1,050,000
 TOTAL BTU/H SHOWN ON PLAN. SEE FBC.FG 304.6.1. FLOOR
 PLAN SHOWS ONE 36X12 LOUVER WHICH DOES NOT COMMUNICATE
 WITH THE OUTDOORS SINCE IT IS LOCATED INSIDE AN
 ENCLOSED PARKING GARAGE.
  
 33. A) BOILER ROOM FLOOR PLAN SHOWS THREE FANS. NONE OF
 THESE FANS ARE LISTED ON EQUIPMENT SCHEDULE. HOW DO
 THESE FANS WORK IN CONJUNCTION WITH COMBUSTION AIR
 REQUIREMENTS? MECHANICAL COMBUSTION AIR IS NOT
 INDICATED IN BOILER ROOMCALCULATIONS. IF MECHANICAL
 COMBUSTION AIR IS TO BE USED, IT SHALL BE DESIGNED IN
 ACCORDANCE WITH FBC,FG 304.9. SHOW ALL RELEVANT
 CALCULATIONS AND REQUIRED CONTROLS IF APPLICABLE. B) EF
 "EXHAUSTO BESB" ATTACHED TO 12 INCH ROUND DUCT GOES TO
 36X30 LOUVER. FLOOR PLAN INDICATES THIS IS AN INTAKE
 LOUVER. IS THIS AN INTAKE OR EXHAUST SYSTEM? IF IT IS
 EXHAUST, IT SHALL BE AT LEAST 10 FEET FROM GARAGE
 INTAKE LOUVERS IN ACCORDANCE WITH FBC,M 401.5.1 AND IT
 SHALL BE ORIENTED SO AS NOT TO BE READILY DRAWN IN BY
 GARAGE VENTILATION SYSTEM IN ACCORDANCE WITH FBC,M
 501.2.
 C) FLOOR PLAN AT BOILER ROOM WALL CALLS FOR "HIGH TEMP"
 FIRE DAMPERS IN EXHAUST DUCTS. WHAT IS TO BE THE DESIGN
 TEMPERATURE OF THE ACTUATING DEVICES? WHAT IS TO BE THE
 NORMAL AIR TEMPERATURE WITHIN THE DUCTS? THE OPERATING
 TEMPERATURE SHALL BE APPROXIMATELY 50 DEG.F ABOVE THE
 NORMAL TEMPERATURE WITHIN THE DUCT SYSTEM, BUT NOT LESS
 THAN 160 DEG.F IN ACCORDANCE WITH FBC,M 607.3.1.1(1).
 SHOW EXPECTED AIR TEMPERATURE AND REQUIRED TEMPERATURE
 SETTING FOR FIRE DAMPER ACTUATING DEVICES (FUSIBLE
 LINKS). FBC 106.1.2
  
 34. M2.19: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON
 FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 35. M2.19: ALL DUCT PENETRATIONS OF FIRE RESISTANCE
 RATED CORRIDORS SHALL BE PROTECTED WITH SMOKE DAMPERS
 IN ACCORDANCE WITH FBC,M 607.5.4. SEE ALSO FBC 715.3.3.
 SMOKE DAMPERS SHALL BE ACTUATED BY ONE OF THE
 PRESCRIBED METHODS LISTED UNDER FBC,M 607.5.4.1.
  
 36. M2.19: REFRIGERANT LINES FOR AHU-17 ARE STILL NOT
 SHOWN ON PLANS. SHOW ROUTING OF REFRIGERANT LINES ON
 PLANS. FBC 106.1.1.
  
 37. M2.19: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON
 FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 38. OK
  
 39. M2.20, 2.23, 2.26, 2.29: SE-2 AND SE-3 INTAKE AND
 OA-4 OUTLET DUCTS ARE SHOWN WITH FIRE DAMPERSAT RATED
 WALL PENETRATIONS. WHERE THE INSTALLATION OF A FIRE
 DAMPER WILL INTERFERE WITH THE OPERATION OF A REQUIRED
 SMOKE CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513,
 APPROVED ALTERNATIVE PROTECTION SHALL BE UTILIZED IN
 ACCORDANCE WITH FBC,M 607.2.1.
  
 40. M2.22: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON
 FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 41. M2.25, 2.28: 24X8 SMOKE EXHAUST DUCTS FROM RISER
 SE-1 ON FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL
 PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER
 WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED
 ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE
 WITH FBC,M 607.2.1.
  
 42 THROUGH 44: OK
  
 45. M3.01A THROUGH M3.03F: ALL OF THESE PAGES ARE
 MARKED AS PART OF REV. 13 BUT THERE ARE NO AREAS ON
 PLANS MARKED ANS HAVING BEEN REVISED. WITHOUT ANY
 INDICATION OF CHANGES, THESE PAGES WILL NOT BE
 REVIEWED.
  
 46. M4.01: RISERS 2A,2B,3A,3B SHOW TYPICAL OUTLET SIZES
 OF 12X6. HOWEVER, FLOOR PLANS SHOW THESE OUTLETS TO BE
 8X6. COORDINATE RISER PLANS WITH FLOOR PLANS AND
 RESUBMIT.
  
 47. M4.02: OA-4 RISER SHOWS ONE OUTLET WITH ONE FSD AND
 NO SIZE AT MEZZANINE AND GROUND LEVELS. FLOOR PLAN ON
 MEZZANINE LEVEL SHOWS TWO OUTLETS WITH TWO FSD'S.
 COORDINATE FLOOR PLANS AND RISER PLANS. ALSO, SHOW
 SIZES OF ALL RISER INLETS AND OUTLETS WHICH DO NOT
 MATCH THE "TYPICAL" DESIGNATION.
  
 48 AND 49: OK
  
 NEW COMMENTS:
  
 A. M2.01: THROUGHOUT THIS FLOOR PLAN THERE ARE
 UNPROTECTED OPENINGS IN RATED WALLS, FIRE DAMPERS IN
 NON-RATED WALLS AND FIRE DAMPERS WHERE THERE ARE NO
 WALLS. COORDINATE THE LOCATIONS OF REQUIRED OPENING
 PROTECTIVES WITH THE LOCATIONS OF RATED WALL ASSEMBLIES
 AS SHOWN ON ARCHITECTURAL PLANS. SHOW OPENING
 PROTECTIVES WHERE THEY ARE REQUIRED AND REMOVE THEM
 WHERE THEY ARE NOT. FBC,M 607.8
  
 B. M2.01: A TRANSFER DUCT HAS BEEN ADDED TO COPY ROOM
 004 FOR BALANCED RETURN BUT HAS NOT BEEN ADDED FOR
 OFFICE 004, WHICH IS A HABITABLE ROOM REQUIRING
 BALANCED RETURN IN ACCORDANCE WITH FBC,M 601.4. SHOW
 COMPLIANCE AND RESUBMIT.
  
 C. M2.XX: THE SYMBOL "EM" HAS BEEN ADDED TO SEVERAL
 PAGES, BUT THS SYMBOL HAS NOT BEEN ADDED TO
 ABBREVIATION OR SYMBOL LEGENDS ON M0.00. PLEASE CLARIFY
 THE MEANING OF THE ABBREVIATION/SYMBOL. FBC 106.1.1
  
 D. M2.03: BASED ON FLOOR PLAN A1.2, THERE ARE SOME
 DUCTS SHOWN PENETRATING RATED WALL ASSEMBLIES.
 COORDINATE WITH ARCHITECTURAL PLANS AND SHOW OPENING
 PROTECTIVES AT ALL DUCT PENETRATIONS OF RATED WALLS IN
 ACCORDANCE WITH FBC,M 607.5.
  
 E. M2.03: IS THE SUPPLY A/C SYSTEM TO ALSO SERVE AS
 MAKE-UP AIR FOR THE SMOKE CONTROL OF THE SOUTH BLOCK?
 IF SO, DUCTS SHALL BE CONSTRUCTED TO MEET THE
 REQUIREMENTS OF FBC,M 513.10.2 AND AHU-16 SHALL BE
 DESIGNED TO MEET THE REQUIREMENTS OF FBC,M 513.10.5.
  
 F. M2.03: SOME AREAS IN AND AROUND LOBBY ARE PROTECTED
 BY FIRE RESISTANCE RATED ASSEMBLIES SUCH AS WALLS AND
 POSSIBLY CEILINGS. DUCTS ARE SHOWN PENETRATING SUCH
 ASSEMBLIES WITHOUT OPENING PROTECTIVES AS REQUIRED BY
 FBC,M 607.5. EXAMPLE: 6X6 DUCT FEEDING THE FIRE COMMAND
 ROOM. SHOW PENETRATIONS TO BE PROTECTED AS REQUIRED BY
 THIS SECTION. COORDINATE WITH ARCHITECTURAL PLANS.
 ALSO, SEF-5 DUCT IS SHOWN WITH MULTIPLE FIRE DAMPERS.
 WHERE THE INSTALLATION OF A FIRE DAMPER WILL INTERFERE
 WITH THE OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM
 IN ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE
 PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M
 607.2.1.
  
 G. M2.06: WHAT IS THE SOURCE OF VENTILATION FOR STORAGE
 AREAS? NOTE: STORAGE ROOMS FOR RETAIL STORES AND SALES
 FLOORS ARE REQUIRED TO HAVE VENTILATION AT A RATE OF
 0.15 CFM PER SQ.FT IN ACCORDANCE WITH FBC,M TABLE 403.3
 AND ASHRAE 62-2001 TABLE 2.1.
  
 H. M2.04 THROUGH M2.17: FLOOR PLAN INDICATES EACH C.O.
 SENSOR IS DESIGNATED FOR ONE GARAGE FAN. GARAGE
 VENTILATION SCHEDULE SHOWS THAT BOTH FANS ARE REQUIRED
 TO PROVIDE THE MINIMUM VENTILATION RATE OF 1.5 CFM PER
 SQ.FT. WHEN CO LEVELS REACH 25 PPM. THEREFORE, IF ANY
 CO SENSOR ON A FLOOR DETECTS 25 PPM, BOTH FANS ON THAT
 FLOOR SHOULD BE ACTUATED. SHOW COMPLIANCE WITH FBC,M
 SEC.404.
  
 I. M2.19: WOMEN'S LOCKER ROOM, FLOOR PLAN SHOWS 220 CFM
 SUPPLY AIR WITH ONLY 120 CFM OF EXHAUST. ALL AIR
 SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED IN
 ACCORDANCE WITH FBC,M 403.2.1(3). SHOW EXHAUST TO BE
 EQUAL OR GREATER THAN THE AIR BEING SUPPLIED TO THESE
 SPACES. ALSO, FAN SCHEDULE ON M5.02 SHOWS TEF 1-4
 CONTROLLED BY SWITCH. SHOW HOW THIS WILL ENSURE ALL AIR
 SUPPLIED TO THESE SPACES BY AHU-17 IS EXHAUSTED IN
 ACCORDANCE WITH FBC,M 403.2.1(3). TEF'S MAY BE
 INTERLOCKED WITH AHU OR RUN CONTINUOUS AS EXAMPLES OF
 POSSIBLE METHODS OF COMPLIANCE.ALSO, SHOW COMPLIANCE
 WITH FBC,M 401.3.
  
 J. M2.20: AHU/CU 18 IS NEW TO PLANS. SHOW THE O.A. RATE
 ON SHCEDULE (M5.01). ALSO, PROVIDE COOLING LOAD
 CALCULATIONS OR SYSTEM SIZING SUMMARY AS PART OF
 REVISED ENERGY CALCULATIONS IN ACCORDANCE WITH FBC
 13-407.1.ABC.1.
  
 K. M2.20: FLOOR PLAN SHOWS 75 CFM SUPPLY IN HEALTH CLUB
 TOILET ROOMS WITH ONLY 50 CFM OF EXHAUST. ALL AIR
 SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED IN
 ACCORDANCE WITH FBC,M 403.2.1(3). SHOW EXHAUST TO BE
 EQUAL OR GREATER THAN THE AIR BEING SUPPLIED TO THESE
 SPACES. ALSO, FAN SCHEDULE ON M5.02 SHOWS TX-1
 CONTROLLED BY SWITCH. SHOW HOW THIS WILL ENSURE ALL AIR
 SUPPLIED TO THESE SPACES BY AHU-18 IS EXHAUSTED IN
 ACCORDANCE WITH FBC,M 403.2.1(3). TX'S MAY BE
 INTERLOCKED WITH AHU OR RUN CONTINUOUS AS EXAMPLES OF
 POSSIBLE METHODS OF COMPLIANCE.ALSO, SHOW COMPLIANCE
 WITH FBC,M 401.3.
  
 L. M2.33: KITCHEN EXHAUST GREASE DUCT, WHY IS IT
 TERMINATING AT A WALL WITH A PLENUM AND LOUVER? GREASE
 DUCT TERMINATIONS SHALL COMPLY WITH FBC,M 506.3.12.
 ALSO, PROVIDE DETAIL FOR SUPPORT OF HORIZONTAL AND
 VERTICAL SECTIONS OF GREASE DUCTS IN ACCORDANCE WITH
 FBC,M 506.3.3. PROVIDE SUBMITTAL/INSTALLATION
 INSTRUCTIONS FOR 2-HOUR RATED DUCT WRAP SYSTEM TO BE
 USED.
  
 M. M4.03: RISER PLAN AND ROOF PLANS DO NOT CORRELATE.
 IT APPEARS THAT SPF 4 AND SPF 3 HAVE BEEN REVERSED.
 ALSO, ROOF PLAN ON M2.31 DOES NOT SHOW ANY BAROMETRIC
 OR RELIEF DAMPERS AS SHOWN ON RISER PLAN. PLEASE
 CORRECT.
  
 N. M4.03: STAIR SHAFTS ARE SHOWN WITH RELIEF DAMPERS
 SET TO 0.05" W.G. HOW WILL THESE WORK TO ACHIEVE THE
 REQUIRED PRESSURIZATION LEVEL OF 0.15" TO 0.35" AS
 SHOWN IN FBC 909.20.5? IF THIS IS THE INTENDED DESIGN,
 SHOW JUSTIFICATION WITHIN THE SMOKE CONTROL RATIONAL
 ANALYSIS AS REQUIRED BY FBC 909.4.
  
 O. M4.04: THIS PAGE HAS A TABLE IN THE UPPER RIGHT
 CORNER WHICH IS NOT LEGIBLE. PROVIDE THIS TABLE IN A
 LEGIBLE FORM AND RESUBMIT. FBC 106.1.1 AND 106.1.3.
  
 P. M5.01: CHANGES ON THIS PAGE WILL BE REVIEWED WHEN
 SUBMITTED WITH REVISED ENERGY CALCULATIONS REFLECTING
 EQUIPMENT CHANGES SHOWN ON PLAN. SEE COMMENT K.
  
 Q. M5.02: THIS PLAN WILL BE REVIEWED IN CONJUNCTION
 WITH RESPONSES TO COMMENTS 33(A), I AND K, WHICH MAY
 EFFECT THE EXHAUST FAN SCHEDULE AND CONTROLS.
  
 R. M6.02: THE THROUGH-PENETRATION FIRESTOP SYSTEM HAS
 BEEN REPLACED BUT IT IS OF POOR VISUAL QUALITY AND IS
 NOT LEGIBLE. PLEASE CORRECT AND RESUBMIT.
  
 S. M7.01: NOTE 1-D HAS BEEN DELETED FROM PAGE. PLEASE
 SEE COMMENTS I AND K AND PROVIDE CONTROL INFO AS NEEDED
 TO CORRELATE WITH THOSE CONDITIONS.
  
 T. M7.01: SEE COMMENT H REGARDING GARAGE EXHAUST FAN
 CONTROLS.
  
 U. M7.01: CORRIDOR PRESSURIZATION NOTE D CALLS FOR THE
 FLOOR OF INCIDENCE TO BE PRESSURIZED. THIS APPEARS TO
 BE COUNTER TO THE INTENT OF THE PRESSURIZATION METHOD
 OF SMOKE CONTROL AS STATED IN FBC 909.6. PROVIDE
 RATIONAL ANALYSIS WHICH CORRESPONDS WITH SEQUENCE OF
 OPERATION SHOWING HOW SMOKE CONTROL SYSTEM IS TO
 FUNCTION. SEE FBC 909.2 AND 909.4.
  
 V. M7.01: STAIL PRESSURIZATION NOTE B, PRESSURES SHALL
 BE IN ACCORDANCE WITH FBC 909.20.5.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]