| 2007-10-21 17:04:17 | REV.13 AND REV.15 |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THE FOLLOWING PAGES WERE REVIEWED FOR CODE COMPLIANCE |
| | WITH ONE COPY RETAINED TO BE INCLUDED IN PERMIT SET OF |
| | PLANS: |
| | M2.09 |
| | M2.12 |
| | M2.15 |
| | M2.18 |
| | M2.21 |
| | M2.24 |
| | M2.27 |
| | M2.30 |
| | M6.01 |
| | |
| | THE REMAINING PAGES FROM REV.13 AND REV.15 ARE DENIED |
| | AND RETURNED WITH COMMENTS TO FOLLOW. TWO DIFFERENT |
| | SETS OF REVISIONS WERE SUBMITTED FOR REVIEW: REV.13 AND |
| | REV.15. PAGES M0.00, 2.01, 2.04, 2.31, 2.32, 5.02 HAVE |
| | BEEN REMOVED FROM REV.13 SUBMITTAL AND REPLACED BY |
| | REV.15. ALL CHANGES FROM BOTH REVISIONS WILL BE |
| | COMPARED TO THE PERMIT PLANS AND BE REVIEWED FOR CODE |
| | COMPLIANCE AS WELL AS FOR RESPONSES TO PREVIOUS REVIEW |
| | COMMENTS DATED 6/26/07. |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| | RESPONSES FOR THE PURPOSE OF CONTINUITY. NEW COMMENTS |
| | GENERATED BY ADDITIONAL CHANGES IN THESE REVISIONS WILL |
| | APPEAR AT THE END OF REVIEW AND BE GIVEN LETTER, RATHER |
| | THAN NUMBER, DESIGNATIONS. |
| | |
| | 1 THROUGH 4: OK |
| | |
| | 5. M2.01: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | |
| | 6. M2.01: PROVIDE WALL MOUNTING DETAIL WHICH WORKS IN |
| | CONJUNCTION WITH MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS RELATED TO AIRFLOW AND SERVICE CLEARANCES. |
| | FBC,M 303.1 AND 303.4 |
| | |
| | 7. M2.02: A) NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | B) PROVIDE WALL MOUNTING DETAIL WHICH WORKS IN |
| | CONJUNCTION WITH MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS RELATED TO AIRFLOW AND SERVICE CLEARANCES. |
| | FBC,M 303.1 AND 303.4 |
| | |
| | 8. M2.02: THE DESIGNATION OF THIS ROOM HAS BEEN CHANGED |
| | TO "STORAGE 014" ON PG A1.1. PLEASE COORDINATE |
| | DRAWINGS. FBC 106.1.1. |
| | |
| | 9 THROUGH 11: OK |
| | |
| | 12. M2.04: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | |
| | 13. M2.04: A) WRITTEN RESPONSE FROM DESIGNER (DRAFTED |
| | 8/7/07, PRIOR TO THIS REVISION) INDICATES "NATURAL |
| | VENTILATION" WILL BE USED FOR THE REMOVAL OF SMOKE IN |
| | THE LOBBY AREA. HOWEVER, M2.04 SHOWS PORTIONS OF THE |
| | LOBBY AREA PROVIDED WITH MECHANICAL SMOKE CONTROL |
| | PROVIDED BY THE EXHAUST METHOD. SMOKE CONTROL NOTE ON |
| | M0.00 AND M2.01 IS CLAIMING 412.5 OF THE 2001 FBC FOR |
| | USE OF "NATURAL VENTILATION" AS SMOKE CONTROL. THAT |
| | CODE SECTION IS NOT APPLICABLE TO THIS PERMIT AS THIS |
| | JOB IS UNDER THE 2004 FBC W/ 2005 REVISIONS. UNDER THIS |
| | CODE, FBC 403.15 (HIGH RISE BUILDINGS) REQUIRES SMOKE |
| | CONTROL BE PROVIDED IN ACCORDANCE WITH FBC SEC.909. |
| | THIS SECTION ALLOWS FOR THREE POSSIBLE METHODS OF SMOKE |
| | CONTROL. SEE FBC 909.6 THROUGH 909.8. GIVEN THAT A |
| | "NATURAL VENTILATION" METHOD IS NOT LISTED IN THE 2004 |
| | FBC, THERE ARE SEVERAL AREAS OF THE BUILDINGWHICH ARE |
| | NOT PROVIDED WITHSMOKE CONTROL. SHOW ON PLANS HOW |
| | AREAS PREVIOUSLY COVERED BY "NATURAL" MEANS WILL NOW BE |
| | COVERED AS REQUIRED BY FBC 909. HAS A RATIONAL ANALYSIS |
| | FOR THE SYSTEM BEING USED BEEN PREPARED AND SUBMITTED |
| | AS PART OF THE PERMIT RECORD? PLEASE SEE FBC 909.2 AND |
| | 909.4 FOR SPECIFIC REQUIREMENTS. |
| | B) IS AHU 12 AND RELATED SUPPLY DUCTWORK TO BE USED AS |
| | PART OF THE SMOKE CONTROL SYSTEM FOR THE LOBBY AREA? |
| | DUCTS SHALL BE CONSTRUCTED TO MEET THE REQUIREMENTS OF |
| | FBC,M 513.10.2 AND FANS SHALL COMPLY WITH FBC,M |
| | 513.10.5. SHOW COMPLIANCE WITH THESE SECTIONS. |
| | |
| | 14. M2.05: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | |
| | 15. M2.05: SEE COMMENT 13 ABOVE RELATED TO SMOKE |
| | CONTROL REQUIREMENTS. |
| | |
| | 16 AND 17: OK |
| | |
| | 18. M2.07: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | |
| | 19. M2.07: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON |
| | FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 20. M2.08: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5 INCLUDING FOR CU-19. ALSO, PROVIDE WALL |
| | MOUNTING DETAIL WHICH WORKS IN CONJUNCTION WITH |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS RELATED TO |
| | AIRFLOW AND SERVICE CLEARANCES. FBC,M 303.1 AND 303.4 |
| | |
| | 21. M2.08: SE-2 AND SE-3 INTAKE AND OA-4 OUTLET DUCTS |
| | ARE SHOWN WITH FIRE DAMPERSAT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 22 AND 23: OK |
| | |
| | 24. M2.10: A) NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. |
| | B) 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON FLOOR |
| | PLAN WITH FIRE DAMPERS AT RATED WALL PENETRATIONS. |
| | WHERE THE INSTALLATION OF A FIRE DAMPER WILL INTERFERE |
| | WITH THE OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM |
| | IN ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE |
| | PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M |
| | 607.2.1. |
| | |
| | 25. OK |
| | |
| | 26. M2.11: SE-2 AND SE-3 INTAKE AND OA-4 OUTLET DUCTS |
| | ARE SHOWN WITH FIRE DAMPERSAT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 27. M2.13: NO BOLLARDS ARE SHOWN ON MECHANICAL OR |
| | ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH FBC,M 303.4 |
| | AND 304.5. ALSO, 24X8 SMOKE EXHAUST DUCTS FROM RISER |
| | SE-1 ON FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 28. M2.14 AND M2.17: NO BOLLARDS ARE SHOWN ON |
| | MECHANICAL OR ARCHITECTURAL PLANS. SHOW COMPLIANCE WITH |
| | FBC,M 303.4 AND 304.5 INCLUDING FOR CU-19. ALSO, SE-2 |
| | AND SE-3 INTAKE AND OA-4 OUTLET DUCTS ARE SHOWN WITH |
| | FIRE DAMPERSAT RATED WALL PENETRATIONS. WHERE THE |
| | INSTALLATION OF A FIRE DAMPER WILL INTERFERE WITH THE |
| | OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM IN |
| | ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE |
| | PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M |
| | 607.2.1. |
| | |
| | 29 AND 30: OK |
| | |
| | 31. M2.17: PROVIDE DETAIL AND LISTED ASSEMBLY |
| | (THROUGH-PENETRATION FIRESTOP SYSTEM) TO BE USED FOR |
| | TYPE-B FLUE PIPE. ALSO, FIRE DAMPER FOR EXHAUST DUCT IS |
| | NOT SHOWN ON PLANS. SEE FBC,M 607.8. |
| | |
| | 32. M2.17: BOILER ROOM CALCULATIONS CALL FOR 1 SQ.IN. |
| | PER 2000 BTU/H. THIS METHOD REQUIRES TWO PERMANENT |
| | OPENINGS COMMUNICATING DIRECTLY WITH THE OUTDOORS, EACH |
| | WITH MIN. 525 SQ.IN. FREE AREA, BASED ON TH 1,050,000 |
| | TOTAL BTU/H SHOWN ON PLAN. SEE FBC.FG 304.6.1. FLOOR |
| | PLAN SHOWS ONE 36X12 LOUVER WHICH DOES NOT COMMUNICATE |
| | WITH THE OUTDOORS SINCE IT IS LOCATED INSIDE AN |
| | ENCLOSED PARKING GARAGE. |
| | |
| | 33. A) BOILER ROOM FLOOR PLAN SHOWS THREE FANS. NONE OF |
| | THESE FANS ARE LISTED ON EQUIPMENT SCHEDULE. HOW DO |
| | THESE FANS WORK IN CONJUNCTION WITH COMBUSTION AIR |
| | REQUIREMENTS? MECHANICAL COMBUSTION AIR IS NOT |
| | INDICATED IN BOILER ROOMCALCULATIONS. IF MECHANICAL |
| | COMBUSTION AIR IS TO BE USED, IT SHALL BE DESIGNED IN |
| | ACCORDANCE WITH FBC,FG 304.9. SHOW ALL RELEVANT |
| | CALCULATIONS AND REQUIRED CONTROLS IF APPLICABLE. B) EF |
| | "EXHAUSTO BESB" ATTACHED TO 12 INCH ROUND DUCT GOES TO |
| | 36X30 LOUVER. FLOOR PLAN INDICATES THIS IS AN INTAKE |
| | LOUVER. IS THIS AN INTAKE OR EXHAUST SYSTEM? IF IT IS |
| | EXHAUST, IT SHALL BE AT LEAST 10 FEET FROM GARAGE |
| | INTAKE LOUVERS IN ACCORDANCE WITH FBC,M 401.5.1 AND IT |
| | SHALL BE ORIENTED SO AS NOT TO BE READILY DRAWN IN BY |
| | GARAGE VENTILATION SYSTEM IN ACCORDANCE WITH FBC,M |
| | 501.2. |
| | C) FLOOR PLAN AT BOILER ROOM WALL CALLS FOR "HIGH TEMP" |
| | FIRE DAMPERS IN EXHAUST DUCTS. WHAT IS TO BE THE DESIGN |
| | TEMPERATURE OF THE ACTUATING DEVICES? WHAT IS TO BE THE |
| | NORMAL AIR TEMPERATURE WITHIN THE DUCTS? THE OPERATING |
| | TEMPERATURE SHALL BE APPROXIMATELY 50 DEG.F ABOVE THE |
| | NORMAL TEMPERATURE WITHIN THE DUCT SYSTEM, BUT NOT LESS |
| | THAN 160 DEG.F IN ACCORDANCE WITH FBC,M 607.3.1.1(1). |
| | SHOW EXPECTED AIR TEMPERATURE AND REQUIRED TEMPERATURE |
| | SETTING FOR FIRE DAMPER ACTUATING DEVICES (FUSIBLE |
| | LINKS). FBC 106.1.2 |
| | |
| | 34. M2.19: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON |
| | FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 35. M2.19: ALL DUCT PENETRATIONS OF FIRE RESISTANCE |
| | RATED CORRIDORS SHALL BE PROTECTED WITH SMOKE DAMPERS |
| | IN ACCORDANCE WITH FBC,M 607.5.4. SEE ALSO FBC 715.3.3. |
| | SMOKE DAMPERS SHALL BE ACTUATED BY ONE OF THE |
| | PRESCRIBED METHODS LISTED UNDER FBC,M 607.5.4.1. |
| | |
| | 36. M2.19: REFRIGERANT LINES FOR AHU-17 ARE STILL NOT |
| | SHOWN ON PLANS. SHOW ROUTING OF REFRIGERANT LINES ON |
| | PLANS. FBC 106.1.1. |
| | |
| | 37. M2.19: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON |
| | FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 38. OK |
| | |
| | 39. M2.20, 2.23, 2.26, 2.29: SE-2 AND SE-3 INTAKE AND |
| | OA-4 OUTLET DUCTS ARE SHOWN WITH FIRE DAMPERSAT RATED |
| | WALL PENETRATIONS. WHERE THE INSTALLATION OF A FIRE |
| | DAMPER WILL INTERFERE WITH THE OPERATION OF A REQUIRED |
| | SMOKE CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, |
| | APPROVED ALTERNATIVE PROTECTION SHALL BE UTILIZED IN |
| | ACCORDANCE WITH FBC,M 607.2.1. |
| | |
| | 40. M2.22: 24X8 SMOKE EXHAUST DUCTS FROM RISER SE-1 ON |
| | FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 41. M2.25, 2.28: 24X8 SMOKE EXHAUST DUCTS FROM RISER |
| | SE-1 ON FLOOR PLAN WITH FIRE DAMPERS AT RATED WALL |
| | PENETRATIONS. WHERE THE INSTALLATION OF A FIRE DAMPER |
| | WILL INTERFERE WITH THE OPERATION OF A REQUIRED SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH SECTION 513, APPROVED |
| | ALTERNATIVE PROTECTION SHALL BE UTILIZED IN ACCORDANCE |
| | WITH FBC,M 607.2.1. |
| | |
| | 42 THROUGH 44: OK |
| | |
| | 45. M3.01A THROUGH M3.03F: ALL OF THESE PAGES ARE |
| | MARKED AS PART OF REV. 13 BUT THERE ARE NO AREAS ON |
| | PLANS MARKED ANS HAVING BEEN REVISED. WITHOUT ANY |
| | INDICATION OF CHANGES, THESE PAGES WILL NOT BE |
| | REVIEWED. |
| | |
| | 46. M4.01: RISERS 2A,2B,3A,3B SHOW TYPICAL OUTLET SIZES |
| | OF 12X6. HOWEVER, FLOOR PLANS SHOW THESE OUTLETS TO BE |
| | 8X6. COORDINATE RISER PLANS WITH FLOOR PLANS AND |
| | RESUBMIT. |
| | |
| | 47. M4.02: OA-4 RISER SHOWS ONE OUTLET WITH ONE FSD AND |
| | NO SIZE AT MEZZANINE AND GROUND LEVELS. FLOOR PLAN ON |
| | MEZZANINE LEVEL SHOWS TWO OUTLETS WITH TWO FSD'S. |
| | COORDINATE FLOOR PLANS AND RISER PLANS. ALSO, SHOW |
| | SIZES OF ALL RISER INLETS AND OUTLETS WHICH DO NOT |
| | MATCH THE "TYPICAL" DESIGNATION. |
| | |
| | 48 AND 49: OK |
| | |
| | NEW COMMENTS: |
| | |
| | A. M2.01: THROUGHOUT THIS FLOOR PLAN THERE ARE |
| | UNPROTECTED OPENINGS IN RATED WALLS, FIRE DAMPERS IN |
| | NON-RATED WALLS AND FIRE DAMPERS WHERE THERE ARE NO |
| | WALLS. COORDINATE THE LOCATIONS OF REQUIRED OPENING |
| | PROTECTIVES WITH THE LOCATIONS OF RATED WALL ASSEMBLIES |
| | AS SHOWN ON ARCHITECTURAL PLANS. SHOW OPENING |
| | PROTECTIVES WHERE THEY ARE REQUIRED AND REMOVE THEM |
| | WHERE THEY ARE NOT. FBC,M 607.8 |
| | |
| | B. M2.01: A TRANSFER DUCT HAS BEEN ADDED TO COPY ROOM |
| | 004 FOR BALANCED RETURN BUT HAS NOT BEEN ADDED FOR |
| | OFFICE 004, WHICH IS A HABITABLE ROOM REQUIRING |
| | BALANCED RETURN IN ACCORDANCE WITH FBC,M 601.4. SHOW |
| | COMPLIANCE AND RESUBMIT. |
| | |
| | C. M2.XX: THE SYMBOL "EM" HAS BEEN ADDED TO SEVERAL |
| | PAGES, BUT THS SYMBOL HAS NOT BEEN ADDED TO |
| | ABBREVIATION OR SYMBOL LEGENDS ON M0.00. PLEASE CLARIFY |
| | THE MEANING OF THE ABBREVIATION/SYMBOL. FBC 106.1.1 |
| | |
| | D. M2.03: BASED ON FLOOR PLAN A1.2, THERE ARE SOME |
| | DUCTS SHOWN PENETRATING RATED WALL ASSEMBLIES. |
| | COORDINATE WITH ARCHITECTURAL PLANS AND SHOW OPENING |
| | PROTECTIVES AT ALL DUCT PENETRATIONS OF RATED WALLS IN |
| | ACCORDANCE WITH FBC,M 607.5. |
| | |
| | E. M2.03: IS THE SUPPLY A/C SYSTEM TO ALSO SERVE AS |
| | MAKE-UP AIR FOR THE SMOKE CONTROL OF THE SOUTH BLOCK? |
| | IF SO, DUCTS SHALL BE CONSTRUCTED TO MEET THE |
| | REQUIREMENTS OF FBC,M 513.10.2 AND AHU-16 SHALL BE |
| | DESIGNED TO MEET THE REQUIREMENTS OF FBC,M 513.10.5. |
| | |
| | F. M2.03: SOME AREAS IN AND AROUND LOBBY ARE PROTECTED |
| | BY FIRE RESISTANCE RATED ASSEMBLIES SUCH AS WALLS AND |
| | POSSIBLY CEILINGS. DUCTS ARE SHOWN PENETRATING SUCH |
| | ASSEMBLIES WITHOUT OPENING PROTECTIVES AS REQUIRED BY |
| | FBC,M 607.5. EXAMPLE: 6X6 DUCT FEEDING THE FIRE COMMAND |
| | ROOM. SHOW PENETRATIONS TO BE PROTECTED AS REQUIRED BY |
| | THIS SECTION. COORDINATE WITH ARCHITECTURAL PLANS. |
| | ALSO, SEF-5 DUCT IS SHOWN WITH MULTIPLE FIRE DAMPERS. |
| | WHERE THE INSTALLATION OF A FIRE DAMPER WILL INTERFERE |
| | WITH THE OPERATION OF A REQUIRED SMOKE CONTROL SYSTEM |
| | IN ACCORDANCE WITH SECTION 513, APPROVED ALTERNATIVE |
| | PROTECTION SHALL BE UTILIZED IN ACCORDANCE WITH FBC,M |
| | 607.2.1. |
| | |
| | G. M2.06: WHAT IS THE SOURCE OF VENTILATION FOR STORAGE |
| | AREAS? NOTE: STORAGE ROOMS FOR RETAIL STORES AND SALES |
| | FLOORS ARE REQUIRED TO HAVE VENTILATION AT A RATE OF |
| | 0.15 CFM PER SQ.FT IN ACCORDANCE WITH FBC,M TABLE 403.3 |
| | AND ASHRAE 62-2001 TABLE 2.1. |
| | |
| | H. M2.04 THROUGH M2.17: FLOOR PLAN INDICATES EACH C.O. |
| | SENSOR IS DESIGNATED FOR ONE GARAGE FAN. GARAGE |
| | VENTILATION SCHEDULE SHOWS THAT BOTH FANS ARE REQUIRED |
| | TO PROVIDE THE MINIMUM VENTILATION RATE OF 1.5 CFM PER |
| | SQ.FT. WHEN CO LEVELS REACH 25 PPM. THEREFORE, IF ANY |
| | CO SENSOR ON A FLOOR DETECTS 25 PPM, BOTH FANS ON THAT |
| | FLOOR SHOULD BE ACTUATED. SHOW COMPLIANCE WITH FBC,M |
| | SEC.404. |
| | |
| | I. M2.19: WOMEN'S LOCKER ROOM, FLOOR PLAN SHOWS 220 CFM |
| | SUPPLY AIR WITH ONLY 120 CFM OF EXHAUST. ALL AIR |
| | SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED IN |
| | ACCORDANCE WITH FBC,M 403.2.1(3). SHOW EXHAUST TO BE |
| | EQUAL OR GREATER THAN THE AIR BEING SUPPLIED TO THESE |
| | SPACES. ALSO, FAN SCHEDULE ON M5.02 SHOWS TEF 1-4 |
| | CONTROLLED BY SWITCH. SHOW HOW THIS WILL ENSURE ALL AIR |
| | SUPPLIED TO THESE SPACES BY AHU-17 IS EXHAUSTED IN |
| | ACCORDANCE WITH FBC,M 403.2.1(3). TEF'S MAY BE |
| | INTERLOCKED WITH AHU OR RUN CONTINUOUS AS EXAMPLES OF |
| | POSSIBLE METHODS OF COMPLIANCE.ALSO, SHOW COMPLIANCE |
| | WITH FBC,M 401.3. |
| | |
| | J. M2.20: AHU/CU 18 IS NEW TO PLANS. SHOW THE O.A. RATE |
| | ON SHCEDULE (M5.01). ALSO, PROVIDE COOLING LOAD |
| | CALCULATIONS OR SYSTEM SIZING SUMMARY AS PART OF |
| | REVISED ENERGY CALCULATIONS IN ACCORDANCE WITH FBC |
| | 13-407.1.ABC.1. |
| | |
| | K. M2.20: FLOOR PLAN SHOWS 75 CFM SUPPLY IN HEALTH CLUB |
| | TOILET ROOMS WITH ONLY 50 CFM OF EXHAUST. ALL AIR |
| | SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED IN |
| | ACCORDANCE WITH FBC,M 403.2.1(3). SHOW EXHAUST TO BE |
| | EQUAL OR GREATER THAN THE AIR BEING SUPPLIED TO THESE |
| | SPACES. ALSO, FAN SCHEDULE ON M5.02 SHOWS TX-1 |
| | CONTROLLED BY SWITCH. SHOW HOW THIS WILL ENSURE ALL AIR |
| | SUPPLIED TO THESE SPACES BY AHU-18 IS EXHAUSTED IN |
| | ACCORDANCE WITH FBC,M 403.2.1(3). TX'S MAY BE |
| | INTERLOCKED WITH AHU OR RUN CONTINUOUS AS EXAMPLES OF |
| | POSSIBLE METHODS OF COMPLIANCE.ALSO, SHOW COMPLIANCE |
| | WITH FBC,M 401.3. |
| | |
| | L. M2.33: KITCHEN EXHAUST GREASE DUCT, WHY IS IT |
| | TERMINATING AT A WALL WITH A PLENUM AND LOUVER? GREASE |
| | DUCT TERMINATIONS SHALL COMPLY WITH FBC,M 506.3.12. |
| | ALSO, PROVIDE DETAIL FOR SUPPORT OF HORIZONTAL AND |
| | VERTICAL SECTIONS OF GREASE DUCTS IN ACCORDANCE WITH |
| | FBC,M 506.3.3. PROVIDE SUBMITTAL/INSTALLATION |
| | INSTRUCTIONS FOR 2-HOUR RATED DUCT WRAP SYSTEM TO BE |
| | USED. |
| | |
| | M. M4.03: RISER PLAN AND ROOF PLANS DO NOT CORRELATE. |
| | IT APPEARS THAT SPF 4 AND SPF 3 HAVE BEEN REVERSED. |
| | ALSO, ROOF PLAN ON M2.31 DOES NOT SHOW ANY BAROMETRIC |
| | OR RELIEF DAMPERS AS SHOWN ON RISER PLAN. PLEASE |
| | CORRECT. |
| | |
| | N. M4.03: STAIR SHAFTS ARE SHOWN WITH RELIEF DAMPERS |
| | SET TO 0.05" W.G. HOW WILL THESE WORK TO ACHIEVE THE |
| | REQUIRED PRESSURIZATION LEVEL OF 0.15" TO 0.35" AS |
| | SHOWN IN FBC 909.20.5? IF THIS IS THE INTENDED DESIGN, |
| | SHOW JUSTIFICATION WITHIN THE SMOKE CONTROL RATIONAL |
| | ANALYSIS AS REQUIRED BY FBC 909.4. |
| | |
| | O. M4.04: THIS PAGE HAS A TABLE IN THE UPPER RIGHT |
| | CORNER WHICH IS NOT LEGIBLE. PROVIDE THIS TABLE IN A |
| | LEGIBLE FORM AND RESUBMIT. FBC 106.1.1 AND 106.1.3. |
| | |
| | P. M5.01: CHANGES ON THIS PAGE WILL BE REVIEWED WHEN |
| | SUBMITTED WITH REVISED ENERGY CALCULATIONS REFLECTING |
| | EQUIPMENT CHANGES SHOWN ON PLAN. SEE COMMENT K. |
| | |
| | Q. M5.02: THIS PLAN WILL BE REVIEWED IN CONJUNCTION |
| | WITH RESPONSES TO COMMENTS 33(A), I AND K, WHICH MAY |
| | EFFECT THE EXHAUST FAN SCHEDULE AND CONTROLS. |
| | |
| | R. M6.02: THE THROUGH-PENETRATION FIRESTOP SYSTEM HAS |
| | BEEN REPLACED BUT IT IS OF POOR VISUAL QUALITY AND IS |
| | NOT LEGIBLE. PLEASE CORRECT AND RESUBMIT. |
| | |
| | S. M7.01: NOTE 1-D HAS BEEN DELETED FROM PAGE. PLEASE |
| | SEE COMMENTS I AND K AND PROVIDE CONTROL INFO AS NEEDED |
| | TO CORRELATE WITH THOSE CONDITIONS. |
| | |
| | T. M7.01: SEE COMMENT H REGARDING GARAGE EXHAUST FAN |
| | CONTROLS. |
| | |
| | U. M7.01: CORRIDOR PRESSURIZATION NOTE D CALLS FOR THE |
| | FLOOR OF INCIDENCE TO BE PRESSURIZED. THIS APPEARS TO |
| | BE COUNTER TO THE INTENT OF THE PRESSURIZATION METHOD |
| | OF SMOKE CONTROL AS STATED IN FBC 909.6. PROVIDE |
| | RATIONAL ANALYSIS WHICH CORRESPONDS WITH SEQUENCE OF |
| | OPERATION SHOWING HOW SMOKE CONTROL SYSTEM IS TO |
| | FUNCTION. SEE FBC 909.2 AND 909.4. |
| | |
| | V. M7.01: STAIL PRESSURIZATION NOTE B, PRESSURES SHALL |
| | BE IN ACCORDANCE WITH FBC 909.20.5. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |