Plan Review Notes
Plan Review Notes For Permit 05091265
Permit Number 05091265
Review Stop P
Sequence Number 1
Notes
Date Text
2005-12-05 00:00:00DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
 FBC-2004 BUILDING
 FHA-98 DESIGN MANUAL
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 1. IF THE DESIGN PROFESSIONAL IS AN
 ARCHITECT OR ENGINEER LEGALLY REGISTERED
 UNDER THE LAWS OF THIS STATE REGULATING
 THE PRACTICE OF ARCHITECTURE AS PROVIDED
 FOR IN CHAPTER 481, FLORIDA STATUTES, OR
 ENGINEERING AS PROVIDED FOR IN CHAPTER
 471, FLORIDA STATUTES, THEN HE OR SHE
 SHALL AFFIX HIS OR HER OFFICIAL SEAL,
 SIGNATURE, AND DATE TO SAID DRAWINGS,
 SPECIFICATIONS AND ACCOMPANYING DATA AS
 REQUIRED BY FLORIDA STATUTE. SECTION
 106.1, FAC 61G15-23.002(2)/61G1-16.003
 AND FS 471.2055/481.025.
 2. SHT A1.0 MEN'S & WOMEN'S TOILET ROOMS
 SHALL BE ACCESSIBLE. SUBMIT DETAILS
 SHOWING COMPLIANCE WITH SECTIONS
 11-4.16, 11-4.19, & 11-4.22 AND ALL
 SUBSECTIONS.
 3. SHT A1.0 THE DRINKING FOUNTAIN SHALL
 BE ACCESSIBLE. SUBMIT A DETAIL SHOWING
 COMPLIANCE WITH SECTIONS 11-4.15 AND ALL
 SUBSECTIONS AS WELL AS SECTION
 11-4.1.3(10)(A) PROVISIONS FOR THOSE WHO
 HAVE DIFFICULTY BENDING OR STOOPING.
 4. SHT A1.2 MEN'S & WOMEN'S TOILET ROOMS
 SHALL BE ACCESSIBLE. SUBMIT DETAILS
 SHOWING COMPLIANCE WITH SECTIONS
 11-4.16, 11-4.19, 11-4.21, 11-4.22 AND
 ALL SUBSECTIONS. ALSO FOR THE BREAK ROOM
 SINK, 11-4.24 AND ALL SUBSECTIONS.
 5. SHT A1.18 MEN'S AND WOMEN'S LOCKER
 ROOMS TO BE ACCESSABLE. SUBMIT DETAILS
 SHOWING COMPLIANCE WITH SECTION 11-4.16,
 11-4.18, 11-4.19, 11-4.21, & 11-4.22 AND
 ALL SUBSECTIONS.
 6. SHT A1.21 MEN'S & WOMEN'S TOILET
 ROOMS AND DRINKING FOUNTAIN SHALL BE
 ACCESSIBLE. (SEE COMMENTS 2 AND 5).
 7. SHT A9.10 UNITS A5.2, A5 & A5.1 CLEAR
 FLOOR SPACE FOR SHOWERS SHALL BE
 PARALLEL TO THE FIXTURE AND FLUSH WITH
 THE CONTROLS. PAGE 7.56 PARAGRAPH TWO. -
 UNITS A5, & A5.1 INDICATE SIZE OF
 OPENING FOR W/C'S. (MINIMUM 33" REQD.).
 8. SHT A9.11 UNITS A5A.2, A5A. & A5A.1
 CLEAR FLOOR SPACE FOR SHOWERS SHALL BE
 PARALLEL TO THE FIXTURE AND FLUSH WITH
 THE CONTROL WALL. PAGE 7.56.
 9. SHT A9.13 UNITS A7 & A7.1 CLEAR FLOOR
 SPACE FOR SHOWERS SHALL BE PARALLEL TO
 THE FIXTURE AND FLUSH WITH THE CONTROL
 WALL. PAGE 7.56.
 10. UNITS B1D.2, & B1D.1 W/C IN MASTER
 BATH SHALL BE 18" OFF THE WALL TO THE
 CENTER OF THE FIXTURE. PLEASE SHOW ON
 THE PLANS. PAGES 7.43 THRU 7.46.
 11. SHT A9.24 UNITS C1.1, C1.2, & C1
 OPENING FOR WATER CLOSET IN BATH #2
 SHALL BE MINIMUM 33" . PLEASE INDICATE
 ON PLANS. PAGE 7.44
 12. SHTS A9.2 THRU A9.24 ALL UNITS.
 CLEAR FLOOR SPACE FOR THE WATER CLOSETS
 SHALL BE APPLIED OR SUPERIMPOSED OVER A
 PLAN PER PAGE 7.43 PARAGRAPH ONE.
 13. SHTS A9.2 THRU A9.24 PER PAGE 7.7
 MINIMUM CLEARANCES BETWEEN COUNTERS AND
 ALL OPPOSING ELEMENTS IS 40". PLEASE
 INDICATE ON THE PLANS THE MINIMUM
 CLEARANCE FOR ALL KITCHENS.
 14. SHT P2.01 NO PIPING SHOWN TO 3 PAD'S
 PLEASE CLARIFY. SECTION 106.1.1 - SHOW
 ALL PIPE SIZES FOR ALL PIPE SYSTEMS ON
 THE FLOOR PLAN. TABLES 710.1 & 1106.3. -
 TRAPS REQUIRED ON THE DRAIN LINES FOR
 THE FIRE DRAIN RISERS. SECTION 802.2. -
 FITTINGS SHALL BE INSTALLED TO GUIDE
 SEWAGE AND WASTE IN THE DIRECTION OF
 FLOW. SECTION 706.3 (SEE CD & D LINES TO
 THE LEFT OF THE MANHOLE. - INDICATE
 WHERE SD LINE IS GOING AT COL. LINE 12
 BETWEEN COLS. P & Q. SECTION 106.1.1.
 15. SHT P2.02 RISERS 9 & 10 ARE
 MISLABLED AT COL. LINE 6-E. SECTION
 106.1.1. - NO PIPING SHOWN TO 2 PAD'S.
 SECTION 106.1.1. - SHOW ALL PIPE SIZING
 FO U/G BUILDING SANT. , STORM, COND.,
 AND DRAIN PIPING. SECTION 106.1.1.
 16. SHT P2.03 SANT. PIPING NOT APPROVED
 IN THE EGRESS STAIRWELL AT COL LINE 22-I
 PER NFPA-101 SECTION 7.1.3.2.1(6). - 2"
 DRAIN LINE TO THE RIGHT OF COL. LINE 28
 REQUIRES A VENT. SECTION 901.2.1. -
 FOUNTAIN WATER SUPPLY REQUIRES BACKFLOW
 PROTECTION PER SECTION 608.13. INDICATE
 METHOD OF PROTECTION. - KEY NOTES 4 & 7
 NOT FOUND. PLEASE CLARIFY. SECTION
 106.1.1.
 17. SHT P2.04 SANT. PIPING NOT ALLOWED
 IN THE STAIRWELL PER NFPA-101 SECTION
 7.1.3.2.1(6).
 18. SHTS P2.16 & P2.17 KEY NOTE 2
 INDICATES, AND PLAN SHOWS RISER THRU
 NEXT FLOOR, WHEN THEY SHOUD INDICATE
 "TURN DOWN". PLEASE CLARIFY. SECTION
 106.1.1.
 19. SHTS P2.19 & P2.20 SUBMIT
 CALCULATIONS FOR PRIMARY AND SECONDARY
 STORM DRAINS. SHOW SQUARE FEET, 1/2 AREA
 OF ALL VERTICAL WALLS INCLUDING
 PARAPETS, AND AREA OF ROOFS DRAINING TO
 DECK AREA FROM ABOVE IN THE CALCULATIONS
 PER SECTIONS 1106 & 1107 WITH ALL
 SUBSECITONS. - SHOW THE LOCATION OF ALL
 SECONDARY DRAINS.
 20 SHTS P2.28, P2.29, & P2.30 ARE
 SHOWING ALL 37 RWL'S. PREVIOUS LEVELS
 SHOW JUST A FEW IF ANY RWL LOCATIONS.
 PLEASE SHOW ALL RWL'S ON EACH LEVEL.
 SECTION 106.1.1.
 21. SUBMIT A STORM DRAIN COLLECTION
 ISOMETRIC RISER DIAGRAM. (SHT P3.13
 SHOWN ON THE INDEX PAGE WAS NOT
 SUBMITTED). - SHOW ALL PIPE SIZES,
 SQUARE FOOTAGE AS IT ACCUMULATES IN THE
 SYSTEM & LOCATION OF EACH RWL RISER.
 SECTION 106.1.1. - SUBMIT STORM RISER
 DIAGRAMS SHOWING ALL PIPE SIZES,
 OFFSETS, AND SQUARE FOOTAGE ECT. SECTION
 106.3.5.1.3(7)(13).
 22. SHT P3.01 RECALCULATE FU'S FOR RISER
 11 & DOWNSTREAM. (11 NOT ADDED IN FU'S.)
 SECTION 106.1.1 & TABLE 710.1(1). - ALL
 FIRE DRAIN LINES REQUIRE A TRAP PER
 SECTION 802.2. - RISERS 49 & 55 APPEAR
 TO RISE TO THE 7TH FLOOR. PLEASE CLARIFY
 SECTION 106.1.1. - PARTIAL SANITARY
 COLLECTION ISOMETRIC DOES NOT REFLECT
 THE FLOOR PLAN UPSTREAM OF THE TRASH
 ROOM FLOOR DRAIN, AND DOWNSTREAM OF THE
 MOP SINK. PLEASE CORRELATE RISER AND
 FLOOR PLAN. SECTION 106.1.1.
 23. SHT P3.02 2-WAY CLEANOUTS ARE
 REQUIRED ON BOTH THE ENTRANCE AND EXIT
 OF THE GREASE INTERCEPTOR PER UTILITY
 STANDARDS. - FIXTURE UNIT VALUE NOT
 SHOWN FOR 3 FURTURE STUB UPS. TABLE
 710.1(1). - 10" 2679FU REQUIRES 12" PIPE
 OR SHALL BE SHOWN AS 1/8"FT THE ENTIRE
 RUN. TABLE 710.1(1) AND SECTION 704.1. -
 10" 2689FU REQUIRES 12" PIPE OR SHALL BE
 SHOWN AS 1/8"FT THE ENTIRE RUN. TABLE
 710.1(1) & SECTION 704.1. - 12" 4402FU
 REQUIRES 15" PIPE OR SHALL BE SHOWN AS
 1/8"FT THE ENTIRE RUN. TABLE 710.1(1) &
 SECTION 704.1.
 24. SHT P3.03 RISERS S/27, S/36, S/78,
 S/94 & S/31, S/89, S/147, S/149 VENT
 STACK REQUIRED PER TABLE 903.2
 25. SHTS P3.05, P3.06, & P3.07 SHT PX
 INDICATED ON EACH SHEET WAS NOT LOCATED.
 PLEASE SUBMIT SHT PX. SECTION 106.1.1.
 26. SHT P3.08 KEY NOTES INFORMATION IS
 REVERSED FROM RISERS. PLEASE CORRELATE
 KEY NOTES AND RISERS. SECTION 106.1.1.
 27. SHT P3.10 WATER RISER FOR UNIT A3.1
 AND REV. A3.1 INDICATE 2 W/M'S. FLOOR
 PLAN ONLY INDICATES ONE. PLEASE
 CORRELATE FLOOR PLAN & RISER DIAGRAM.
 SECTION 106.1.1.
 28. SHT P3.12 PAD RISER TO THE LEFT OF
 LIFT STATION AND PIPING WHERE THE PIPING
 SPLITS LEFT & RIGHT PRIOR TO THE LIFT
 STATION DO NOT REFLECT THE FLOOR PLAN.
 ALSO 6 RISERS SHOW 2 FOURTH FLOORS.
 PLEASE CORRELATE RISERS & FLOOR PLANS.
 SECTION 106.1.1.
 29. SHT P3.13 NOT SUBMITTED. (SHOWN ON
 THE INDEX SHEET).
 30. SHT P3.14 6 STORM MANHOLES ARE SHOWN
 ON THE GROUND FLOOR PLUMBING PLANS.
 THESE ARE NOW REFERED TO AS STORM DRAIN
 LIFT STATIONS, AND ONLY 4 ARE SHOWN.
 PLEASE CORRELATE THE TERMINOLOGY AND
 INDICATE WHERE THE OTHER LIFT STATIONS
 ARE LOCATED. NONE OF THE RISERS DIAGRAMS
 REFLECT THE FLOOR PLANS. - PLEASE NUMBER
 OR PLACE A DESIGNATION ON THE LIFT
 STATIONS BOTH ON THE RISER DIAGRAMS AND
 THE FLOOR PLANS TO HELP EXPEDITE THE
 PLAN REVIEW. - RISER (4" 2830SF) DOES
 NOT APPEAR TO PICK UP ANY DRAINS. PLEASE
 CLARIFY. - 2" DRAIN UPSTREAM OF 4" HD IS
 SHOWN TO BE ON THE SANT. SYSTEM ON THE
 FLOOR PLAN. PLEASE CLARIFY. SECTION
 106.1.1.
 31. SHT P3.15 FITTINGS SHALL BE
 INSTALLED TO GUIDE SEWAGE AND WASTE IN
 THE DIRECTION OF FLOW. SECTION 706.3.
 SEE FITTING UPSTREAM OF MANHOLE (OR LIFT
 STATION). - DOES NOT REFLECT THE FLOOR
 PLAN. RISERS CD/37 & DR/37 NOT SHOWN ON
 RISER DIAGRAM.
 32. DOMESTIC BOOSTER PUMPS, STORM LIFT
 STATION PUMPS SHALL BE LISTED. PLEASE
 SUBMIT MANUF. SPECIFICATION SHEETS FOR
 EACH. SECTION 303.
 33. GREASE INTECEPTOR SHALL BE SIZED BY
 THE ENVIRONMENTAL COMPLIANCE MANAGER.
 PLEASE CONTACT LYNN MASSON (561)
 822-2271 OR BY FAX (561) 822-2279 OR BY
 E-MAIL [email protected].
 34. SHT P309 KEY NOTES 7 - A/C CLOSET IS
 A PLENUM AND AS SUCH SHALL HAVE NO
 COMBUSTABLE MATERIAL. PLEASE INDICATE
 THE MATERIAL BEING USED FOR THE THERMAL
 EXPANSION VALVE DRAIN, THE P&T RELIEF
 VALVE DISCHARGE DRAIN, AND THE EMERGENCY
 PAN DRAIN FOR THE WATER HEATER.
 35. PLANS SHOW A VENT IN THE WALL AND AN
 OPEN 2" DRAIN IN THE PLENUM. MORE
 INFORMATION IS REQUIRED. WILL THE ROOM
 AS A PLENUM PULL THE AIR FROM THE 2"
 OPEN DRAIN AND INTRODUCE THE HUMID, WARM
 AIR INTO THE AIR CONDITIONED AIR OF THE
 UNIT? IS THIS PRACTICE ACCEPTABLE TO THE
 MECHNAICAL ENGINEER? - ALSO THE VENT
 TERMINATION SHALL EITHER VENT THRU THE
 ROOF OR TERMINATE ABOVE THE CEILING 6"
 ABOVE THE INSULATION.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS