| Plan Review Notes For Permit 05090596 |
| Permit Number |
05090596 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2006-01-31 00:00:00 | DENIED | | | 2ND REVIEW | | | | | | 1) LETTER OF INTENT IS REQUIRED TO HAVE | | | THE WET SIGNATURE, DATE AND EMBOSSED | | | SEAL OF THE ENGINEER. | | | | | | 2) THE DESIGN PRESSURES LISTED ON THE | | | ENGINEERING FOR THE BUTT GLASS ASSEMBLY | | | DO NOT MEET THE REQUIRED WINDLOAD | | | PRESSURES FOR THE OPENING AS SPECIFIED | | | ON THE APPROVED PLANS FOR THE STRUCTURE. | | | THE PLANS SPECIFY +33.7 AND -44.0 PSF. | | | SEE COMMENT #2 OF FIRST REVIEW. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | | | | |
|