| Date |
Text |
| 2005-10-06 00:00:00 | *********** UNSAT ************* |
| | |
| | ***** PROJECT ONLY/ PLAN REVIEW ONLY. |
| | |
| | |
| | 1)NOTE: PLEASE KNOW, PLANS HAVE ONLY |
| | BEEN SUBMITTED FOR "PLAN REVIEW" AND |
| | WERE NOT SUBMITTED FOR PERMIT WITH FEES |
| | PAID BEFORE OCT 1ST, 2005. |
| | PLEASE SEE PLANS REFERENCE 2001 FBC FOR |
| | DESIGN ETC. |
| | PLEASE SEE ELECTRICAL, BLDG, MECH, FIRE |
| | , PLUMB PLANS WILL ALL BE REQUIRED TO |
| | CHANGED TO BE DESIGNED UNDER THE 2004 |
| | FBC. |
| | PLEASE COMMENTS FROM OTHER REVIEWERS. |
| | |
| | 2)NOTE: PLEASE SUBMIT ALL MANUFACTURE |
| | SPECS/CUT SHEETS FOR FIRE PUMP AND FIRE |
| | PUMP CONTROLLER. PLEASE INDICATE LOCKED |
| | ROTOR OCP PER 695.4B1. PLEASE SEE PLANS |
| | REF 695.5B |
| | PLEASE BE SURE ALL SPECS AND PLANS |
| | INDICATE THE MANUAL MEANS OF DISCONNECT |
| | LOCATED ON THE OUTSIDE OF THE EQUIPMENT |
| | AS REQUIRED PER 230.76,230.79, NFPA-101, |
| | 10.4.2. |
| | PLEASE INCLUDE VOLTAGE PROPOSED FOR FIRE |
| | PUMP. |
| | PLEASE KNOW, EVEN THOUGH PLANS REFERENCE |
| | "BY OTHERS", THIS INFORMATION IS STILL |
| | REQUIRED WITH MAIN BLDG PLANS. |
| | UNABLE TO VERIFY CODE COMPLIANCE AT THIS |
| | TIME. |
| | |
| | 3)NOTE: PELASE PROVIDE WIND LOADING |
| | CALCULATIONS FOR SITE LIGHTING POLES |
| | INCLUDING FIXTURES BEING ATTACHED. |
| | PLEASE ALSO PROVIDE POLE DETAIL WITH |
| | FIXTURE, FOUNDATION ETC. |
| | PLEASE KNOW, THE CALCUALTIONS WILL BE |
| | REVIEWED BY THE STRUCTUAL REVIEWER AND |
| | WILL BE REQUIRED TO MEET FBC 140MPH MIN. |
| | |
| | 4)NOTE: PLEASE SEE 110.26 FOR MIN |
| | CLEARENCE REQUIRED FOR TRANSFORMER. |
| | FLOOR PLAN APPEARS TO SHOW TRANSFORMER |
| | LOCATED IN FRONT OF PANELS. |
| | IT SEEM THIS WILL BE MOUNTED ABOVE, |
| | HOWEVER RISER DIAGRAM DOES NOT REFLECT |
| | THIS. |
| | IF MOUNTED ABOVE, PLEASE PROVIDE A |
| | STRUCTUAL DETAIL FOR THIS. |
| | |
| | 5)NOTE: PLEASE PROVIDE MIN SIZE FOR |
| | GUTTER ON RISER. PLEASE SEE FBC 104.2.1, |
| | CODES SHALL NOT BE REFERENCED IN WHOLE |
| | OR IN PART IN LEIU OF SPECIFIC |
| | DETAIL,INFORMATION ETC. |
| | |
| | 6)NOTE: PLEASE SEE GROUNDING ELECTRODE |
| | SYSTEM IS ALSO REQUIRED TO BE ATTACHED |
| | TO FOOTER STEEL AND COLD WATER PIPE (IF |
| | METAL). PLEASE INLCUDE THESE ON |
| | GROUNDING DETAIL.250.50 |
| | PLEASE ALSO SEE OTHER PIPING SYSTEMS TO |
| | BE BONDED. (FIRE SPRINKLER ETC) |
| | 250.104 |
| | |
| | ***** PLEASE SEE NOTE NUMBER ONE, PLANS |
| | WERE NOT SUBMITTED FOR PERMIT UNDER THE |
| | 2001 FBC. |
| | |
| | *** PLEASE SEE ANY POSSIBLE COMMENTS |
| | FROM OTHER REVIEWERS WHICH MAY AFFECT |
| | ELECTRICAL PLANS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2005-10-05 00:00:00 | IN ELEC FOR REVIEW. |