| 2005-11-22 00:00:00 | DENIED: |
| | 1.PLAN SHEET 1-0.0.0 PROJECT |
| | INFORMATION INDICATES TYPE VI, |
| | UNPROTECTETED SPRINKLERED.PLEASE |
| | INDICATE FULL SPRINKLERED, 13R OR 13D |
| | TYPE SYSTEM.PLEASE NOTE, ADDTIONAL |
| | COMMENTS MAY BE GENERATED BY THE |
| | RESPONSES GIVEN. |
| | |
| | 2.PLEASE CLARIFY DUCT PENETRATION |
| | THROUGH THE SEPARATION WALL BETWEEN THE |
| | GARAGE AND THE FIRST FLOOR OF THE |
| | RESIDENCE.PLAN SHEET A-4.0.2 & |
| | A-10.0.0, INDICATES THIS SEPARATION AS 1 |
| | HR. PLAN M1 ONLY INDICATES A FIRE DAMPER |
| | AT THE CEILING PENETRATION.DUCTS LESS |
| | THAN 100 SQ INCHES SHALL COMPLY WITH |
| | 2001 FMC 607.1.3 #3 ITEMS 1 THROUGH 4. |
| | |
| | 3.PLAN SHEET M2 DRYER EXHAUST EXCEEDS |
| | 25 FT REQUIREMNET WITH REDUCTIONS FOR |
| | 90'S PER 2001 FMC 504.6.PLAN SHEET |
| | E2.2.4 INDICATES "BF" (BOOSTER FANS?). |
| | PLEASE NOTE INSTALLATION OF BOOSTER FANS |
| | WILL BE REVIEWED BY THE BUILDING OFFICAL |
| | UNDER "ALTERNATE MATERIALS & METHODS" |
| | 2001 FMC 103.7.1.PLEASE PROVIDE THE |
| | FOLLOWING INFORMATION FOR REVIEW: 1) A |
| | LETTER FROM AN ENGINEER EMPLOYED BY THE |
| | DRYER MANUFACTURER STATING THE |
| | INSTALLATION OF THE DRYER BOOSTER FAN IS |
| | ACCEPTABLE AND WILL NOT VOID THE |
| | WARRANTY OF THE DRYER. 2) MEANS OF |
| | NOTIFYING THE OWNER SHOULD THE BOOSTER |
| | FAN FAIL. 3) MANUFACTURER'S SUBMITTAL & |
| | INSTALLATION DATA FOR THE BOOSTER FANS. |
| | 4) PROVIDE ALL PERTINENT INFORMATION FOR |
| | ALL TRADES MECHANICAL, ELECTRICAL, FIRE, |
| | ETC. FOR THE INSTALLATION OF BOOSTER |
| | FANS. |
| | |
| | 4.PLAN SHEET M2 THE O.A. INTAKE IS |
| | WITHIN 10 FT OF THE TOILET & DRYER |
| | EXHAUST TERMINATIONS.EXHAUST |
| | CONTAMINANTES SHALL NOT BE RECIRCULATED |
| | PER 2001 FMC 501.3. |
| | |
| | 5.PLEASE PROVIDE OUTSIDE AIR |
| | CALCULATIONS IN ACCORDANCE WITH TABLE |
| | 403.3. |
| | |
| | 6.PLEASE NOTE R/A TRANSFER GRILLES |
| | LOCATED ON THE 3RD FLOOR ARE NOT SIZED |
| | PROPERLY, SEE 2001 FMC 601.4 EXCEPTION 2 |
| | & 3.TRANSFER SHALL BE A MINIMUM OF 50 |
| | SQ INCHES PER 100 CFM OF SUPPLY AIR INTO |
| | THAT AREA. |
| | |
| | 7.PLEASE PROVIDE DETAIL FOR THE AHU |
| | LOCATED IN THE CLOSET.PLEASE NOTE, |
| | MECHANICAL CLOSET SHALL BE CONSTRUCTED |
| | PER 2001 FMC 603.9 & 610.1.ABC.3.7 OF |
| | CHAPTER 13 OF THE 2001 FBC. |
| | |
| | 8.NO COMBUSTIBLES ALLOWED IN THE |
| | MECHANICAL CLOSET PER 2001 FMC 602.2.1. |
| | |
| | 9.CONDENSATE DRAIN SHALL TERMINATE A |
| | MINIMUM OF 12" FROM THE BUILDING |
| | STUCTURE PER 2001 FBC 1503.4.4. |
| | |
| | 10. AUXILIARY DRAIN PAN WITH OVERFLOW |
| | PROTECTION REQUIRED PER 2001 FMC |
| | 307.2.3. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |