Plan Review Notes
Plan Review Notes For Permit 05090362
Permit Number 05090362
Review Stop E
Sequence Number 1
Notes
Date Text
2005-10-09 00:00:00IN ELEC FOR REVIEW.
 ****** UNSAT ******
  
 1)NOTE: PLEASE SUBMIT ALL MANUFACTURES
 SPECS/CUT SHEETS FOR NEW GENERATORS,
 FIRE PUMP CONTROLLER, NEW ATS
 SWITCHE(S), GEN SYSTEM CONTROL MODULE
 (PARALLEL OPERATION MODULE).
 PLEASE KNOW, CODE COMPLIANCE FOR SOME
 ITEMS CAN NOT VERIFIED AT THIS TIME.
 PLEASE SEE OTHER COMMENTS.
  
 2)NOTE: PLEASE SEE CODE REFERENCES ALL
 NEED TO BE UPDATED.
 NFPA-70, 2002 WHICH WAS ADOPTED ON JULY
 1ST, 2003.
 NFPA-101 2003, NFPA-20 2003, ETC.
 PLEASE SEE THAT ALL NFPA'S AS LISTED ON
 X-1 COVER SHEET SHOULD BE UPDATED TO THE
 LATEST ADOPTED CODES.
 DATE OF 3/2/04 ABOVE LISTING IS NOT
 ACCURATE TO UPDATE AS SOME OF THESE
 CHANGED BEFORE THIS DATE AND SOME HAVE
 CHANGED SINCE.
  
 3)NOTE: PLEASE SEE NOTE #8 ON E-1
 MENTIONS A "TEMPORARY ELECTRICAL
 SERVICE" FOR ANY DOWN TIMES, THIS IS
 FINE HOWEVER, NO ELECTRICAL PLANS WERE
 SUBMITTED FOR THIS?
 PLEASE KNOW, IT MAY BE EASIER TO PERMIT
 THIS TEMP SERVICE UNDER A SEPARATE
 PERMIT?
  
 4)NOTE: PLEASE PLACE ALL ROOM AND AREA
 DESIGNATIONS ON NEW BASEMENT LEVEL
 PLANS.
  
 5)NOTE: PLEASE SEE EGRESS DOORS AND
 REQUIREMENTS FROM MAIN ELECTRICAL
 ROOM/EMERGENCY ELECTRICAL ROOM.
 PLEASE SEE 110.26, FOR DOOR SWING, PANIC
 HARDWARE ETC REQUIRED. PLEASE SEE THERE
 MAY BE A CONFLICT WITH DOOR SWING FROM
 BOILER ROOM?
  
 6)NOTE: PLEASE SEE SECTION/DETAIL 2 ON
 E-5, WHICH APPEARS TO SHOW SOME SORT OF
 ?? DIRECTLY IN FRONT OF DOORS FOR EM
 SWGR RM.??
 110.26
  
 7)NOTE: PLEASE SEE FIRE REVIEW COMMENTS
 PERTAINING TO "FIRE WATCH" AS LISTED IN
 NOTE ON E-6, WHICH MENTIONS FIRE WATCH
 ETC.
 PLEASE SEE FIRE REVIEW COMMENTS AS ALL
 APPROVALS FOR SUCH MUST BE BY THE FIRE
 MARSHALS OFFICE AND AHJ.
 PLEASE KNOW, THE AGENCY TO PERFORM SUCH
 A WATCHMUST FIRST BE APPROVED BY ABOVE
 MENTIONED AND MUST SUBMIT ALL
 INFORMATION WHICH WILL BE REQUIRED AND
 SET-FORTH BY THE FIRE MARSHALS OFFICE.
  
 8)NOTE: PLEASE PROVIDE BATTERY BACK UP
 FIXTURES IN MAIN ELECTRICAL ROOM,
 GENERATOR ROOM, FIRE PUMP ROOM, CHILLER
 ROOM FOR EGRESS TO AND FROM ALL
 ELECTRICAL EQUIPMENT WHICH MAY NEED TO
 BE TURNED OFF ETC.
 LS 101,7.8,7.9, 700.16,
  
 9)NOTE: PLEASE SEE THAT GEN ANNUNCIATOR
 PANEL/STATUS CONTROL PANEL SHALL BE
 LOCATED AT CENTRAL STATION CONTROL
 RM/AREA.
 110, 5.6.5, 101,11.8.5 ETC.
  
 10)NOTE: PLEASE PROVIDE NOTE FOR 517.17C
 FOR TESTING GFP.
  
 11)NOTE: PLEASE SEE GSB1 AND GSB2, WHICH
 INDICATES 1800A MCB'S?. PLEASE VERIFY
 THIS AS 1800 IS NOT A RECOGNIZED SIZE OF
 OCP AS SET FORTH UNDER 240.6.
  
 12)NOTE: PLEASE PROVIDE LOAD FORGSB?
 LOADS FOR OTHER MAINS ETC SHOWN, HOWEVER
 THIS COULD NOT BE LOCATED.
 215.5,220
  
 13)NOTE: PLEASE CLARIFY OF ANY MEANS OF
 OCP IS LOCATED AT GENERATOS.
 215.5 SEE PREVIOUS NOTE WHICH REQUESTED
 MORE INFORMATION FOR GEN SYSTEM MODULE
 AND PARALLEL OPERATION.
  
 14)NOTE: PLEASE KNOW, THE
 OCP/DISCONNECTING MEANS FOR FIRE PUMP
 LOCATED IN GSB, WILL BE REQUIRED TO BE
 LOCATED OUT OF THIS EQUIPMENT. THIS OCP
 AND DISCONNECTING MEANS SHALL BE LOCATED
 AHEAD OF GSB. PLEASE SEE NFPA -20
 9.3.2.2.3.2.695.4B2
 SECTIONS OF 695 AND CHAPTER 9, (9.6)
 DOES NOT SPECIFY THE DISCONNECTING MEANS
 LOCATION. THE ONLY STATEMENT AS
 MENTIONED IN NFPA-20 9.6.1.2 IS"A TAP
 AHEAD OF THE ON-SITE GENERATOR
 DISCONNECTING MEANS SHALL NOT BE
 REQUIRED".
 IT IS THE INTERPETATIONTHAT CONNECTION
 AS SHOWN MAY VERY WELL PROMOTE AN
 INADVERANT DISCONNECT OF FIRE PUMP.
  
 15)NOTE: PLEASE KNOW, AS CONVERSED WITH
 ELECTRICAL ENGINEER AND ELECTRICAL
 CONTRACTOR AND AS DETERMINED UNDER
 NFPA-20,9.1.3,9.3.1 NFPA-70 695.4, 695.6
 THE ROUTING OF THE SERVICE ENTRANCE
 CONDUCTORS AND FEEDERS SOURCES SHALL BE
 PROTECTED BY BEING CONSIDERED "OUTSIDE"
 THE BLDG. THE FIRE RATING ALONE FOR
 PROTECTION OF CONDUCTORS IS ONLY ONE
 CONSIDERATION WHICH IS GIVEN BY ABOVE
 MENTIONED 9.3.1.
 PLEASE PROVIDE A LAYOUT FOR NEW PROPOSED
 ROUTING AND DETAIL PROTECTION.
 IT IS KNOWN TO THIS OFFICE AND FIRE
 MARSHALS OFFICE; ANEW FEED FROM FPL IS
 BEING CONSIDERED WHICH IS PROPOSED TO
 EXSITING FIRE PUMP ROOM.
 THIS SEEMS TO BE SAFEST AND MOST COST
 EFFECTIVE OPTION TO MEET CODE AND LIFE
 SAFETY OF NEW INSTALLATION. THISIS
 REQUIRED AND ACCEPTABLE DUE TO THE SCOPE
 OF WORK AND PERMITTED UNDER NFPA-20 AND
 NFPA-70.IN FACT THIS IS THE
 RECOMMENDED INSTALLATION.
  
 16)NOTE: PLEASE SHOW/DETAIL ON HOW NEW
 SERVICE ENTRANCE CONDUCTORS FOR SERVICE
 ARE BEING ROUTED.
 EXISTING CONDITIONS SHOW MAINS/EMERGENCY
 AND
 NORMAL LOCATED IN BASEMENT AND NEW
 INSTALLATION IS BEING SHOWN ON THE FLOOR
 ABOVE (GROUND FLR), YET IT IS UNCLEAR
 HOW THE CONDUCTORS ARE GOING TO ENTER
 NEW EQUIPMENT.
 PLEASE SEE 240.6, 230.70 ETC FOR
 CONDUCTORS TO BE CONSIDERED OUTSIDE THE
 BUILDING.
  
 17)NOTE: PLEASE BE SURE NEW FIRE PUMP
 CONTROLLER CONTAINS THE MANUAL MEANS OF
 DISCONNECT LOCATED ON THE OUTSIDE OF THE
 NEW FPC, THIS DISCONNECTING MEANS SHALL
 BE RATED FOR THE FULL LOAD TO BE SERVED.
 230.76,230.79, NFPA-20 10.4.2
  
 ***************************************
 PLEASE KNOW, I AM RECOMMENDING AN
 "ON-SITE" MEETING BE HELD TO GO OVER
 PROPOSED WORK. THIS MEETING SHOULD BE
 ATTENDED BY THEELECTRICAL ENGINEER OF
 RECORD, ELECTRICAL CONTRACTOR, CHIEF
 FIRE MARSHAL, CHIEF ELECTRICAL INSPECTOR
 AND MYSELF.
 THIS WILL HELP IN THE PROCESS FOR THE
 SCOPE OF WORK PROPOSED.
 PLEASE CONTACT FOR TIME.
  
 ** PLEASE SEE POSSIBLE REVIEW NOTES FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 ** PLEASE REMOVE ALL OLD/VOIDED SHEETS
 AND ONLY INSERT NEW REVISED SHEETS INTO
 TWO COMPLETE SETS FOR REVIEW AND
 STAMPING.
 PLEASE SUBMIT "ONE" SET OF THE
 OLD/VOIDED SHEETS FOR REFERENCE.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLANS EXAMINER
 561-805-6717
 [email protected]