| Date |
Text |
| 2006-04-13 00:00:00 | **********UNSAT 3RD REVIEW ********* |
| | |
| | 1) NOTE: PLEASE SEE VALUATION FOR |
| | COMPLETE SCOPE OF WORK IS STILL NOT |
| | BEING ADJUSTED BY THE CONTRACTOR WHEN |
| | RESUBMITTING PLANS AND A VALUE CAN NOT |
| | BE VERIFIED AT THIS TIME. |
| | PLEASE PROVIDE ALL SIGNED CONTRACTS FOR |
| | EQUIPMENT BEING INSTALLED AND LABOR. |
| | THIS WAS REQUESTED ON TWO PREVIOUS |
| | REVIEWS TO ADJUST VALUE FOR SCOPE AS |
| | VALUE WAS WAY TOO LOW AND DID NOT |
| | REFLECT WORK BEING DONE. |
| | PLEASE SEE FBC ADMISTRATIVE SECITON |
| | 104.6.5,2001) 108.3 2004. |
| | SHALL INCLUDE ALL LABOR AND MATERIALS, |
| | EVEN IF EQUIPMENT IS OWNER SUPPLIED. |
| | PLEASE SEE THIS WOULD INCLUDE, GEN, |
| | TANK, ATS, ELECTRICAL SERVICE, AND ALL |
| | EQUIPMENT BRING INSTALLED INSIDE ROOM |
| | ALONG WITH ANY VALUE FOR OTHER TRADES. |
| | PLEASE SEE ORIGINAL VALUE WAS APPLIED |
| | FOR AT $17K AND THENA VALUE WAS PLACED |
| | ON APPLICATION FOR $67K. |
| | PLEASE SEE APPLICATION NOW CONTAINS |
| | "WHITE-OUT " WHERE BACK UP DIESEL |
| | GENERATOR WAS? IS THIS NO LONGER IN |
| | SCOPE? PLANS HOWEVER STILL INDICATE A |
| | GENERATOR. PLEASE DESCRIBE PROJECT IN |
| | DETAIL ON APPLICATION AS REQUESTED ON |
| | APPLICATION AND CORRELATE WITH THE |
| | PLANS. |
| | IT IS NOW UNCLEAR FI GEN IS STILL PART |
| | OF THIS PROJECT?? |
| | |
| | 2) NOTE: PLEASE SEE SPECS FOR ATS IS THE |
| | SAME SPECS THAT WERE SUBMITTEDON THE |
| | PREVIOUS REVIEW. |
| | PLEASE SEE NO DISCONNECTING MEANS RATED |
| | FOR THE LOAD SERVED, GROUPED, LOCATED ON |
| | THE OUTSIDE OF THE EQUIPMENT COULD BE |
| | LOCATED.? |
| | 230.76.230.79,230.72,225.31-225.39 |
| | |
| | 3) NOTE: PLEASE SUBMIT TWO COMPLETE SETS |
| | OF PLANS. |
| | PLEASE SEE ONE SET HAS MULTIPLE E-SHEETS |
| | WHICH ARE REPEATED AND CONTAIN TWO |
| | DIFFERENT DATES SIGNED, DATED AND SEALED |
| | BY THE ENGINEER? |
| | PLEASE SEE ONE SET STARTS WITH E-4 AND |
| | E-5 DATED 2/27/06 AND THEN STARTS OVER |
| | AGAIN WITHE NEWER DATED SHEETS DATED |
| | 3/3/06?? |
| | |
| | |
| | 4) NOTE: PLEASE SEE COVER SHEET MENTIONS |
| | 2005 NEC, WE ARE CURRENTLY UNDER THE |
| | 2002 NEC, THIS CAN BE REDLINED. |
| | |
| | ** PLEASE SEE COMMENTS FROM MECHANICAL |
| | REVIEWER WHICH MAY AFFECT ELECTRICAL |
| | PLANS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. ONCE AGAIN, IF THERE ARE ANY |
| | QUESTIONS, PLEASE DO NOT HESITATE IN |
| | CONTACTING THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2006-04-12 00:00:00 | IN ELEC FOR REVIEW |