| 2006-03-10 00:00:00 | *******UNSAT 3RD REVIEW ****** |
| | |
| | ** PLEASE SEE SOME COMMENTS FROM PREVIOS |
| | REVIEW, AND SOME NEW COMMENTS DUE TO |
| | REVISED PLASN ONCE AGAIN. |
| | |
| | |
| | 1)NOTE:OK. |
| | |
| | 2)NOTE:PLEASE SEE RISER IS NOW MISSING |
| | THE MEANS OF DISCONNECT AS REQUIRED PER |
| | 225.31-225.39 |
| | PLEASE SEE RISER SHOWS 150A OCP AT GEN |
| | FEEDING A 100A MLO PANEL AND PANEL |
| | SCHEDULED FOR THIS PANEL IS SHOWN AS |
| | 125A ?? PLEASE CORRELATE. PLEASE SEE MAX |
| | OCP ALLOWED FOR RATED PANELS. PLEASE SEE |
| | MIN CONDUCTOR SIZES ETC. |
| | 215.5, 240.4,310.15B6/310.16 |
| | PLEASE VERIFY 150A OCP AT GEN, AS UNIT |
| | IS SHOWN AS 30KW (125A UNIT). |
| | |
| | 3)NOTE: OK, HOWEVER SEE ABOVE |
| | |
| | 4)NOTE:OK, NO LOAD SHEDDING. |
| | HOWEVER PLEASE SE A/C LOAD SHOWN IN LOAD |
| | CALCUALTIONS, INCLUDE WHAT APPEARS TO BE |
| | BOTH COOLING AND HEATING?? |
| | |
| | 5)NOTE: NOTE #5 NO, PLEASE SEE ONLY ONE |
| | SET OF SPECS STILL SUBMITTED. |
| | PLEAS KNOW, ONLY THE BASE SPECS FOR GEN |
| | AND ATS ARE NEED. |
| | |
| | ** PLEASE SUBMIT TWO SETS OF PLANS, |
| | SPEC ETC.ONLY ONE SUBMITTED. (TWO |
| | SURVEYS WERE SUBMITTED . |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. ONCE AGAIN, IF THERE ARE ANY |
| | QUESTIONS,PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6717 |
| | [email protected] |