| 2006-02-23 00:00:00 | **** UNSAT 2ND REVIEW **** |
| | |
| | ** PLEASE SEE SOME NEW COMMENTS AS |
| | INFORMATION FOR EQUIPMENT IS NOW BEING |
| | SUBMITTED FOR REVIEW. |
| | |
| | 1)NOTE: |
| | |
| | 2)NOTE: PLEASE SEE A NOTE ON PLANS |
| | MENTIONS ATS'S ARE TO HAVE A MANUAL |
| | MEANS OF DISCONNECT AND THAT MEANS OF |
| | DISCONNECT IS GOING TO BE ON THE OUTSIDE |
| | OF THE EQUIPMENT AND RATED FOR THE LOAD |
| | SERVED, (230.76,230.79 ETC), HOWEVER THE |
| | SPECS SUBMITTED DO NOT CONFIRM AND |
| | CORRELATE WITH THIS?? |
| | |
| | |
| | 3)NOTE: PLEASE SEE THE ATS'S ARE ALSO |
| | BEING SHOWN AS 3-POLE? PLEASE SEE SYSTEM |
| | IS SHOWING GFI, THIS SHOULD BE GF |
| | PROTECTED AS GFI IS FOR PERSONNEL |
| | PROTECTION. |
| | PLEASE SEE 230.95,240.13,700.7D,700.26 |
| | AND NFPA-110 6.2.15 |
| | PLEASE ALSO SEE THIS FOLLOWING TEXT |
| | TAKEN DIRECTLY FROM PAGE #5 FROM ASCO. |
| | |
| | "WHERE GROUND FAULTPROTECTION IS |
| | TRIGGERED BY THE CODE AND AN ALTERNATE |
| | POWER SUPPLY IS INCLUDED,SWITCHING OF |
| | THE NEUTRAL BECOMES NECESSARY. THE |
| | CIRCUIT SHOWN ABOVE ILLUSTRATESSUCH A |
| | CIRCUMSTANCE. THE SERVICE IS LARGER THAN |
| | 1,000 AMPS. CONSEQUENTLY, GROUNDFAULT |
| | PROTECTION IS REQUIRED AT THE MAIN |
| | SERVICE DISCONNECT AT A MINIMUM. IF IT |
| | IS INSTALLED THERE AND THE GENERATOR |
| | NEUTRAL GROUNDING WAS THROUGH A SOLID |
| | CONNECTION TO THE MAIN SERVICE NEUTRAL, |
| | A GROUND FAULT WHEN THE GENERATOR IS |
| | FEEDING THE LOAD WILL CAUSE THE MAIN |
| | SERVICE DISCONNECT TO OPEN. THIS WILL |
| | NOTDISCONNECT THE ARCING FAULT FROM |
| | THE GENERATOR. COORDINATION IS THUS |
| | LOST." |
| | PLEASE SEE AS IT IS REVIEWED BY THIS |
| | OFFICE AND OTHER CONSULTATIONS, A 4-POLE |
| | ATS WOULD BE REQUIRED, THIS WOULD ALSO |
| | CREATE THE SEPARATELY DERIVED SYSTEM, |
| | AND PLEASE ADJUST THE GROUNDING |
| | ELECTRODE SYSTEM AT THE GEN ACCORDINGLY. |
| | |
| | 4)NOTE: PLEASE SEE FLORIDA |
| | ADMINISTRATIVE CODE 61G15-23.002 AND FS |
| | 471.025 TO BE CLEAR AND VISABLE WIHT ALL |
| | SAID INFORMATION ON RIASED SEAL. PELASE |
| | SEE ONLY ONE SHEET FROM EACH SET IS |
| | VISABLE WITH THIS INFORMATION AND RAISED |
| | SEAL. |
| | PLEASE ALSO SEE 61G15-23.001 WHICH |
| | REQUIRES THE SEAL TO CONTAIN THE WORDING |
| | OF "LICENSE" AND NOT "CERTIFICATE" |
| | PLEASE KNOW, THIS WAS PASSED FEB 04 AND |
| | AND EXTENSION WAS GRANTED TO THE DATE OF |
| | DEC 31ST, 2005 ONLY. PLEASE BE SURE |
| | CORRECTED SEAL IS PRESENT WHEN SIGNING |
| | AND SEALING PLANS. |
| | |
| | **PLEASE REMOVE ALL OLD/VOIDED SHEETS |
| | AND ONLY INSERT NEW REVISED SHEETS INTO |
| | COMPLETE SETS FOR REVIEW AND STAMPING. |
| | PLEASE SUBMIT ONLY ONE COPY OF |
| | OLD/VOIDED SHEETS FOR REFERENCE. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | ? |