| Date |
Text |
| 2006-06-10 00:00:00 | ***** UNSAT2ND REVIEW ****** |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS |
| | REVIEW AND SOME NEW NOTES DUE TO THE |
| | PLANS ETC SUBMITTED. |
| | |
| | 1)NOTE:NOTE #1 NO, PLEASE SEE THIS |
| | NOTE STILL APPLIES. PLEASE SEE A NEW |
| | SHEET WAS ADDED FOR THE BUILDING AND |
| | UNIT LAYOUTS WHICH CONTAIN COMMENTS |
| | UNDER OTHER REVISIONS WHICH WERE |
| | SUBMITTED. |
| | PLEASE SEE THE REVISED RISER WHICH WAS |
| | SUBMITTED TO ADDRESS THE PANEL "G-1" IN |
| | QUESTION HAS COMMENTS AS IT WAS REVISED |
| | FOR OTHER ITEMS. SEE NEW NOTES BELOW. |
| | |
| | ** PREVIOUS REVIEW ** |
| | PLEASE SEE PLANS SUBMITTED SEEM |
| | TO CONTAIN SHEETS FROM REVIEW FOR BLDG |
| | PERMITTED SETS. |
| | PLEASE CLARIFY PLANS FOR "SITE" SHOULD |
| | CONTAIN SHEETS PERTAINING TO SITE ONLY. |
| | SEE RISER DIAGRAM SUBMITTED DOES NOT |
| | INCLUDE PANEL "G1". G-1 PANEL SCHEDULE |
| | SUBMITTED. |
| | |
| | 2)NOTE: NOTE #2 NO. THESE WERE NOT |
| | SUBMITTED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT ALL MANUFACTURE |
| | SPEC/CUT SHEETS FOR GATE MOTORS AND |
| | CONTROLLER. PLEASE SEE ANY FIRE REVIEW |
| | COMMENTS FOR "FAIL SAFE" OPERATION IN |
| | THE EVENT OF POWER FAILURE. |
| | NOTE WAS SHOWN ON "A" SHEET WHICH |
| | MENTIONED GATE CAN BE MANUAL. |
| | |
| | NEW NOTES |
| | ************************** |
| | |
| | 3) NOTE: PLEASE KNOW, ALL OLD/VOIDED |
| | SHEETS SHALL BE COMPLETELY REMOVED FROM |
| | SETS AND ONLY NEW REVISED SHEET SHOULD |
| | BE INSERTED INTO COMPLETE SETS FOR |
| | REVIEW AND STAMPING. |
| | PLEASE KNOW, ONLY ONE COPY OF ANY |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | ACCOMPANYING THE THREE NEW COMPLETED |
| | SETS. |
| | ** PLEASE BE SURE THESE SETS ARE |
| | SUBMITTED WITH SHEETS ATTACHED TO |
| | EACHOTHER AS NOT TO HAVE SHEETS FALLING |
| | OUT OF SETS ETC. PLANS WERE NOT STAPLED |
| | TOGETHER WHEN SUBMITTED. THEY ARE NOW |
| | STAPLED BY THIS OFFICE AS NOT TO LOSE |
| | ANY SHEETS. ETC. |
| | THIS WILL HELP IN THE REVIEW PROCESS. |
| | |
| | 4) NOTE: PLEASE SEE SEC'S HAVE NOW BEEN |
| | DOWN SIZED TO 3/0'S FOR ONE FIRE PUMP |
| | SERVICE. |
| | PLEASE SEE THAT THE SEC'S SHALL ME SIZED |
| | ACCORDINGLY TO THE OCP, HP, AND THE SIZE |
| | OF THE FPC. |
| | PLEASE SEE 310.16, AS 3/0'S ARE ONLY |
| | RATED AT 200A'S AND THE 4/0'S ARE ONLY |
| | RATED FOR 225A'S. PLEASE SEE |
| | 240.4,310.16. |
| | THE OCP SHOWN ON MAIN IS 250A'S. |
| | (LOOCKED ROTOR SHOULD BE SET AND PART OF |
| | THE FPC AND MUST BE 6X THE FLA'S. |
| | 695.4/695.5 |
| | |
| | THIS RISER SHALL BE REVISED EVEN THOUGH |
| | THE RISER WAS SUBMITTEDONLY FOR PANEL |
| | "G-1". |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2006-06-09 00:00:00 | IN ELEC FOR REVIEW |