2006-05-04 00:00:00****** UNSAT 2ND REVIEW ********
  
  
 SAIL CLUB TOWER 3.
  
 ** PLEASE SEE SOME COMMENTS FROM
 PREVIOUS REVIEW AND SOME NEW COMMENTS
 DUE TO CHANGES IN PLANS.
  
 ** PLEASE SEE NOTE BELOW ARE TAKEN
 DIRECTLY FROM THE PREVIOUS REVIEW AND
 NEW COMMENTS ARE AT THE END.
  
 ** PLEASE SEE COMMENT WITH RESPECT TO
 THE REMOVAL OF ALL OLD/VOIDED SHEETS
 FROM SETS.
  
 1)NOTE:NOTE #1, NO, PLEASE SEE SCOVER
 SHEET STILL REFLECTS THE 1999 NEC AND
 PLEASE SEE REVISED SHEET E.1 SHOULD
 INDICATE THE CURRENT CODES IN EFFECT FOR
 DESIGN.
  
 ** PREVIOUS NOTE **
 PLEASE SEE CODE REFERENCED ON PLANS
 LIST THE 1999 NEC. PLEASE KNOW, AS OF
 JULY 1ST 2003, THE STATE ADOPTED THE
 2002 NEC.
 PLEASE ALSO SEE WE ARE UNDER THE 2003
 NFPA-101 AND 2002 NFPA-72
 PLEASE ADJUST.
  
 2)NOTE: NOTE #2 OK, HOWEVER PLEASE SEE
 NEW NOTE WITH RESPECT TO VAULT AREA.
  
 ** PREVIOUS NOTE **
 PLEASE SEE BLDG /FIRE REVIEW COMMENTS
 FOR STAIR TOWER EXITING WHICH WILL
 AFFECT ELECTRICAL LAYOUT.
 EXITS BACK INTO HALL WAY AREAS IN FRONT
 OF UNITS.
  
 3)NOTE:NOTE #3 OK, THIS SEE TO BE
 DONE, PLEASE SEE OTHER NOTES FOR A
 COUPLE ITEMS MISSING FOR RECEPTSETC.
  
  
 ** PREVISOU NOTE **
 PLEASE SHOW ALL CIRCUITING ON PLANS AND
 CORRELATE WITH THE SUBMITTED PANEL
 SCHEDULES.
 PLEASE SEE SOME AREAS WHICH ELECTRICAL
 FIXTURES SEEM TO BE MISSINGTHIS.
 PLEASE ALSO SEE CIRCUITING FOR UNITS.
 PLEASE KNOW, A "TYPICAL" UNIT LAYOUT MAY
 BE PROVIDED, HOWEVER A LAYOUT WOULD BE
 REQUIRED FOR EACH UNIT TYPE, INCLUDING
 STUDIO UNIT.
 CIRCUITING FOR SOME UNITS/ITEMS CAN NOT
 BE VERIFIED AT THIS TIME.
  
 4)NOTE: NOTE #4 NO/YES, SOME
 PHOTOMETRICS WERE SUBMITTED, HOWEVER
 PLEASE SEE SOME OF THESE ARE NOT CLEAR
 AND VISABLE FOR STAIRS FOR VERIFICATION.
 PLEASE ALSO SEE NONE COULD BE LOCATED
 FOR EGRESS PATHS INCLUDING
 HALLS/CORRIDORS?
 PLEASE SEE A MIN OF 10FT CANDLES AVG IS
 REQUIRED UNDER NORMAL FOR STAIRS WHICH
 DOES NOT SEEM TO BE THE AVG AS SHOWN?
 PLEASE SEE NOT INDICATION FOR MINS UNDER
 EM LIGHTING CONDITIONS COOULD BE
 LOCATED.
  
 ** PREVIOUS **
 PLEASE PROVIDE PHOTO-METRICS FOR
 STAIR TOWERS ON NORMAL PWR AND STAND-BY.
 ALONG WITH WALK AREAS.
 PLEASE SEE STAIR TOWERS UNDER NORMAL PWR
 SHALL MEET A MIN OF 10FT CANDLES. PLEASE
 SEE ARES FOR HALLS ETC ARE PERMITTED TO
 BE LESS. .
 PLEASE SEE NFPA-101 7.8.1.3,7.9.2.1
  
 5)NOTE: NOTE #5 YES/ NO, PLEASE SEE A
 MIN OF ONE FIXTURE CONTAINING A BATTERY
 BACK UP WILL BE REQUIRED AT EVERY OTHER
 LEVEL IN STAIR TOWERS AND EGRESS PATHS
 TO THE PUBLIC RIGHT OF WAY.
  
 ** PREVIOUS NOTE **
 PLEASE SEE ONE STAIR TOWER SHOWS
 CIRCUITING FOR LTS FROM NORMAL POWER
 PANEL AND CIRCUTING.
 PLEASE SEE THESE ARE REQUIRED TO BE ON
 EM POWER PANEL.
 PLEASE KNOW, BATTERY BACK FIXTURES WILL
 BE REQUIRED AT EVERY OTHER LEVEL(MIN).
 PLEASE SEE LS 101 WHICH MENTIONS THE
 TRIPPING/THROW OF A SINGLE BRKR SAHLL
 NOT LEAVE ANY EGRESS AREA IN TOTAL
 DARKNESS. PLEASE CALL ELECTRICAL PLAN
 REVIEW AND FIRE MARSHALS OFFICE TO GO
 OVER OPTIONS PERMITTED.
 A BATTERY BACK-UP FIXTURE AT EVERY OTHER
 LEVEL WILL SATISFY THIS OFFICE AND AHJ.
 PLEASE BE SURE TO MEET THE MIN OF 1
 FT/CANDLE UNDER EM.
 PLEASE BE SURE TO SEE PREVIOUS NOTE #4
 FOR LIGHTING LEVELS.(MIN)
  
 6)NOTE:NOTE #6 YES/NO, PLEASE SEE MOST
 ROOMS WERE DONE, HOWEVER THE ELEVATOR RM
 DOES NOT INCLUDE A BATTERY BACK UP
 FIXTURE.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE BATTERY BACK-UP
 FIXTURES IN MAIN ELECTRICAL RMS AND
 ELEVATOR ROOM(S), GENERATOR AND FIRE
 PUMP ROOM. PLEASE ALSO PROVIDE
 CIRCUITING FOR THESE
 RMS.
  
 7)NOTE: NOTE #7 NO, ? RESPONSE MENTIONS
 TO SEE 5.1, HOWEVER NO CURB DETAIL WAS
 LOCATED.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE CURB DETAIL FOR
 BUS-DUCT RISER AND FLOOR PENATRATIONS.
 368.6
  
 8)NOTE: NOTE #8 , PLEASE EXPAND NOTE FOR
 ALL CLEARENCES TO BE MET PER 110.26.
 PLEASE KNOW, THE NOTE ADDDED WAS OK AND
 SHOULD REMAIN ALSO.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE NOTES ON RISER AND
 ELECTRICAL ROOM SHEETS FOR REQUIREMENTS
 OF 110.26 FOR PANIC HARDWARE AND DOOR
 SWINGS.
 PLEASE SEE MIN CLEARENCE PER 110.26
  
 9)NOTE:NOTE # 9 OK, PLEASE SEE
 RESPONSE MENTIONS "ALREADY CHNGED PER
 REV#1", HOWEVER WE ARE NOT AWARE OF ANY
 "REV#1" SUBMITTED FOR REVIEW?
 OK, AS CHANGED ON RISER.
  
 ** PREVIOUS NOTE **
 PLEASE SEE RISER INDICATES ALL BUS-DUCT
 FROM FPL VAULT TO MAIN ELECTRICAL ROOM
 AS OVER-HEAD. PLEASE SEE 230.70, 230.6,
 NO MORE THAN 8' OF UNPROTECTED
 CONDUCTORS/ OR BUS DUCT
 PERMITTED "INSIDE THE BLDG.
 PLEASE SEE ROUTING OF BUS-DUCT APPEARS
 TO SHOW INSTALLATION INSIDE CONDO
 UNITS??
  
 10)NOTE:NOTE #10 OK,? PLEASE CLARIFY
 IF THE EQUIPMENT WHICH IS NOTED IN
 RESPONSE CONTAINS A MANUAL MEANS OF
 DISCONNECT LOCATED ON THE OUTSIDE.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE INFORMATION ON BUS -DUCT
 RISER MAINS. APPEARS TO SHOW THESE AS
 "SHUNT-TRIP" AND NOT CONTAINING A MANUAL
 MEANS OF DISCONNECT LOCATED ON
 THE OUTSIDE OF THE EQUIPMENT. PLEASE SEE
 MAIN PANEL SCHEDULE(S), THESE DO NOT
 SEEM TO INDICATE A MCB.
 230.76,230.79
  
 11)NOTE:NOTE #11 NO, PLEASE SEE RISER
 HAS BEEN REVISED, HOWEVER PLEASE SEE 5.2
 AS BUS-DUCT RISER IS STILL SHOWN AS 2500
 A'S WITH 5.1 SHOWING 3000A'S.
  
 ** PREVIOUS NOTE **
 PLEASE CORRELATE ALL MAINS ETC FOR
 SIZING. PLEASE SEE KEY NOTES MENTIONS
 2500A AND PLANS ALSO INDICATE 3000A.?
  
 12)NOTE: NOTE #12 NO, PLEASE SEE NOTES
 ON E.01 HAVE BEEN REVISED TO INDICATE
 ALL COPPER BUS-DUCT, HOWEVER NO SPEC
 BOOKS, AND RISER STILL SHOWS ALUMINUM.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE SPECIFIC INFORMATION ON
 BUS-DUCT, PLEASE SEE AN ALUM EQUIPMENT
 GROUNDING CONDUCTOR/ MATERIAL IS NOT
 PERMITED. 310.2. LOCAL AMENDMENTS.
  
 13)NOTE:NOTE #13 NO.
 PLEASE KNOW, REVIEW AND PERMITTING OF
 TOWERS SHALL NOT PASSED UNITLA REVIEW
 OF ALL SPECS ARE DONE. IF THIS EQUIPMENT
 IS BEING DONE UNDER THE GARAGE PERMITS,
 ALL WILL DEPEND ON THE REVIEW, PASSING
 AND ISSUANCE OF THE GARAGE BUIDLINGS.
 PLEASE KNOW, NO PERMITS FOR TOWERS WILL
 BE GRANTED UNTIL ALL ABOVE FOR GARAGES
 ARE MET.
 THE SPECIFICA INFORMATION FOR FIRE PUMPS
 , GENERATORS ETC SHOULD BE REFERENCE ON
 EACH SET OF TOWER PLANS AND PERHAPS NOTE
 FOR "SCOPE UNDER SEPARATE PERMIT".
  
 ** PREVIOUS NOTE:
 PLEASE SUBMIT ALL MANUFACTURE
 SPECS AND CUT SHEETS FOR GENERATOR, ATS,
 FIRE PUMP AND FIRE PUMP CONTROLLER.
 PLEASE ALSO SUBMIT THE SAME FOR ANYSUB
 BASE FUEL TANK.
 PLEASE KNOW, DUE TO THE INFORMATION NOT
 BEING SUBMITTED AT THIS TIME, REVIEW FOR
 SOME ITEMS FOR CODE COMPLIANCE CAN NOT
 BE DONE.
 UNABLE TO VERIFY CODE COMPLIANCE FOR
 MANY ITEMS UNDER NFPA, 20,70,101,110
 ETC.
  
 14)NOTE:NOTE #14 NO , AS NOTED ABOVE
 ONNOTE #13.
  
 ** PREVIOUS NOTE **
 PLEASE SEE ELECTRICAL RISER DIAGRAM DOES
 NOT CONTIAN ANY INFORMATION FOR FIRE
 PUMP OR FIRE PUMP CONTROLLER,
 SERVICE, SIZING , CONDUCTORS ETC.
 PLEASE COMPLETE.
 ENCASEMENT IN CONCRETE, OUTSIDE THE
 BLDGS, ETC
  
 15)NOTE: NOTE #15 NO, PLEASE SEE NOTE
 UNDER TOWER #4, THESE ROOMS AND MIN
 REQUIRMENTS SHOULD BE DETAILED IN EACH
 SET. GEN RM WS SEEN ON TOWER #4, HOWEVER
 SEE NOTES FOR FP RM ETC.
 PHOTO-METRICS FOR 30 FT CANDLES MIN ETC.
  
 ** PREVIOUS NOTE **
 PLEASE SEE AREA FOR GARAGE CONTAINING
 THE LOCATION OF FIRE PUMP AND GENERATOR
 WILL BE REQUIRED TO BE SUBMITTED FOR
 PERMIT AND REVIEW.
 PLEASE SEE LOCATIONS FOR FIRE
 SEPARATIONS, ACCESS, LIGHTING, ETC CAN
 NOT BE REVIEWED AT THIS TIME.
  
 16)NOTE: NOTE #16 OK, SO NOTED IN OTHER
 COMMENTS AND PLANS.
  
 ** PREVIOUS NOTE**
 PLEASE VERIFY LOCATION OF GENERATOR.
 PLEASE SEE PLANS SEEM TO INDICATE FIRE
 PUMP AND GEN RM LOCATED AT FIRST FLR
 LEVEL, HOWEVER RISER SEEMS TO SHOW THESE
 AT 2ND FLR LEVEL?
 PLEASE CLARIFY.
  
 17)NOTE: NOTE #17 YES/ NO, PLEASE SEE
 THE FIRST PART OF THE NOTE WAS
 ADDRESSED, HOWEVER CORRELATION OF A/C
 EQUIPMENT FOR 2ND PART OF NOTE DID NOT
 SEEM CORRRECTED AS MECHNICAL PLANS
 INDICATE DIFFERENT LOADS THAN ELECTRICAL
 PLANS.
 PLEASE SEE NOTE #40
 PLEASE SEE NEW NOTES FOR LOADS.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE DISCONNECTING MEANS FOR
 ALL A/C EQUIPMENT AT ROOF TOP LEVEL. A
 "TYPICAL" DETAIL MAY BE GIVEN FOR
 THESE.440.11
 PLEASE ALSO INDICATE ALL ROOF TOP GFI
 RECEPTS PER 210.63
 PLEASE CORRELATE ALL A/ KW RATINGS AND
 LOADS WITH MECHANICNAL PLANS . (KW
 RATINGS ETC).
  
 18)NOTE:NOTE #18? NO, PLEASE SEE FIRE
 COMMAND ROOM AND ALL EQUIPMENT ETC
 REQUIRED PER HIGH-RISES AS NOTED. PLEASE
 LIST ACCORDINGLY.
  
 ** PREVIOUS NOTE **
 PLEASE SEE FIRE REVIEW NOTES
 ALSO: PLEASE PROVIDE A LAYOUT FOR
 CENTRAL STATION RM(FIRE COMMAND RM)
 SHOWING ALL DEVICES/ PANELS/ STATUS
 PANELS ETC.
 PLEASE LIST ALL ITEMS AS SPECIFIED IN
 NFPA- 101 11.8.5,
  
 19)NOTE:NOTE #19 OK.
  
 20)NOTE: NOTE #20 OK.
  
 21)NOTE: NOTE #21 OK.
  
 22)NOTE:NOTE #22 NO, ? COULD NOT
 LOCATE THE NOTE AND INSTALLATION
 REQUIREMENTS/NOTE.
 RESPONSE MENTIONS TO SEE REVISED E.01
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE NOTE ON PLANS FOR SMOKE
 DETECTOR PLACEMENT PER REQUIREMENTS OF
 NFPA -72 11.8.3.5.
  
 23)NOTE: NOTE #23 OK.
  
 24)NOTE: NOTE #24 OK, HOWEVER SEE ISLAND
 FOR UNIT "E". THIS IS SHOWN ON THE THE
 TYPICAL DETAIL AND CAN BE REDLINED.
  
 25)NOTE: NOTE #25 OK, SEE RESPONSE
 MENTIONS GAS APPLIANCES, HOWEVER PLEASE
 INDICATE ON PLANS/PANEL SCHEDULE WHICH
 APPLIANCES ARE GOING TO BE GAS.
 PLEASE SEE NEW COMMENT WITH RESPECT TO
 WH.
  
 ** PREVIOUS NOTE **
 PLEASE SEE A 70A BRKR IS BEING SHOWN FOR
 RANGE?? PLEASE SEE 210.23,422.11B
 50A RANGE RECEPT, 50A BRKR MAX.
  
 26)NOTE: NOTE #26 ? UNCLEAR HOW THE
 SINGLE PHASE IS"A" AND "C" PHASE.
  
 ** PREVIOUS NOTE **
 PLEASE SEE PANEL SCHEDULES SEEM TO SHOW
 "A" AND "C" PHASE FOR SINLGLE PHASE
 SERVICE AND UNITS??
 PLEASE CLARIFY / ADJSUT.215.5
  
 27)NOTE: NOTE #27 NO, PLEASE SEE AREAS
 SHOUDL BE CLEAR FOR DINING ROOM/AREA AND
 LIVING RM. PLEASE SEE THE LR/DR
 NOTTATIONS ON PLANS ARE CROSSED ON SOME
 UNITS .PLEASE SEPARATE FOR CLARITY
  
 ** PREVIOUS NOTE **
 PLEASE LABEL AND /OR CLARIFY "DINING"
 AREAS IN ALL UNITS.
 UNABLE TO VERIFY CIRCUITING AS DINING
 /LIVING ARE SEEMED TO BE COMBINED.'
 PLEASE SEE 210.52B1
  
 28)NOTE: NOTE #28 OK, PLEASE SEE MMOST
 WERE DONE, HOVER PLEASE SEE REDLINED
 PLANS AS THERE A FEW.
 PLEASE KNOW, AS SOME RECEPTS MAY BE
 MISSING FOR HALL AREAS AND 210.52C ON
 THE SMAE SHEET PLEASE REVISE AT THIS
 TIME.
  
 ** PREVIOUS NOTE **
 PLEASE SEE 210.52D FOR SOME UNITS
 MISSING GFI'S WITH IN 3' OF LAV'S.
 PLEASE ALSO SEE A GFI MAY NOT PERMITTED
 ON THE OTHER SIDE OF A LAV TO MEET
 210.52D (3').
 GFI 'S MAY BE MOVED IN BETWEEN BOTH
 LAV'S OR AN ADDITIONALRECEPT MAY BE
 ADDED.
  
 29)NOTE: NOTE #29, NO, PLEASE SEE SOME
 STILL REDLINED AT LOCATIONS AS NOTED.
  
 ** PREVIOUS NOTE **
 PLEASE SEE MISSING RECEPTS IN HALLWAY
 AREAS, 10' OR MORE OF CONTINUOUS
 WALL. 210.52H.
  
 30)NOTE: NOTE #30 ?? PLEASE SEE RISER
 SHOWS PANEL, HOWEVER NOT NOTED AS FUTURE
 OR ?? 2MD FLR COULD NOT LOCATE THIS
 PANEL.
  
 ** PREVIOUS NOTE **
 PLEASE SEE RISER SEEMS TO INDICATE A
 POOL PANEL, HOWEVER NO OTHER INFORMATION
 WAS SUBMITTED AND PANEL COULD NOT
 LOCATED ON PLANS.
 LOADS ETC.
 215.5, 220
  
 31)NOTE: NOTE #31 OK
  
 32)NOTE: NOTE #32 N, HOWEVER PLEASE
 KNOW, NOTE WAS NOT COMPLETE WHEN TYPED
 FROM PREVIOUS REVIEW IN ERROR. PLEASE
 KNOW, THE COMMENT SHOULD HAVE READ. "
 PLEASE PROVIDE A NOTE ON ROOF TOP PLANS;
 " ANY AND ALL LIGHTNING PROTECTION
 SYSTEM PROPOSED OR INSTALLED SAHLL BE
 UNDER A SEPARATE PERMIT AND SHALL BE
 INSTALLED PER NFPA-780" OR WORDS TO THAT
 AFFECT.
 IT IS KNOWN TO THIS OFFICE THATTHE
 CODE DOES NOT REQUIRE LP ON THIS TYOE OF
 BUILDING AS LP IS REQUIRED ON SOME OTHER
 STRUCTURS PER THE FBC.
  
 ** PREVIOUS NOTE **
 PLEASE PLACE NOTE ON "ROOF
 PLANS" WHICH WILL REQUIRE ALL LIGHTNING
 PROTECTION
  
  
 33)NOTE: NOTE #33 OK.
  
 34)NOTE: NOTE #34 NO, PLEASE SEE SOME
 PANELS ARE NOTED AS CONTAINING
 "FEED-THRU LUGS" , HOWEVER SOME ARE ALSO
 SHOWING A MAIN W/ FEED THRU LUGS.CIRCUIT
 BREAKER?
 PLEASE SEE NEW COMMENTS FOR SOME PANELS.
  
 ** PREVIOUS NOTE **
 PLEASE INDICATE IF PANELS EH2A-
 EH12A ARE FEED THRU LUGS OR DOES EACH
 PANEL CONTAIN OCP FOR EACH.?
 PLEASE ALSO SEE PANELS H5A-9, 12 ETC.
 215.5
  
 35)NOTE: NOTE # 35 OK, HOWEVER SEE NEW
 NOTE.
  
 ** PREVIOUS NOTE **
 PLEASE PROVIDE PANEL SCHEDULE FOR PANEL
 H2AA ON RISER. 215.5
  
 36) NOTE:NOTE # 36 OK, HOVER SEE NEW
 NOTE FOR 16B
  
 ** PREVIOUS NOTE ** PLEASE SEE PANEL
 H16A INDICATES H12A AND H12B ON LOAD
 CALCS?? RISER APPEARS TO SHOW H16A BEING
 FED FROM SBA AND SHOWS H12A FROM H9A
 ETC. 215.5
  
 37)NOTE: NOTE #37 OK.
  
 38)NOTE: NOTE #38 OK.
  
 39)NOTE: NOTE #39 NO.
  
 ** PREVIOUS NOTE **
 PLEASE SUBMIT "SPEC BOOKS' FORREVIEW OF
 PROJECT. THESE WOULD CONTAIN JOBSITE
 SPECS.
  
 40)NOTE: NOTE # 40 OK.
  
 41)NOTE: NOTE #41 ? NO, PLEASE SEE NOTE
 WITH RESPECT TO CORRELATTION OF KW FOR
 AHU'S. ONCE THIS IS DONE, VERIFICATION
 OF THE OCP CAN BE DONE.
 SEE NEW NOTES FOR LOADS.
  
 ** PREVIOUS NOTE **
 NOTE ADDED AFTER REVIEW OF TOWER #4,
 PLEASE SEE MIN OCP FOR AHU HEAT TO BE
 125%. 424.3B SHOWS 50A OCP.
  
  
 *************** NEW NOTES **********
  
 1) NOTE: PLEASE PROVIDE A LETTER FROM
 FPL REPRESENITIVE FOR VAULT AND VAULT
 LOCATION SINCE REVISED PLANS.
 PLEASE SEE VAULT IN UNCLEAR AS ONCE
 SHEET APPEARS TO LABEL IN A SMALLER ROOM
 WITH SOEM OTHER EQUIPMENT/ ELECTRICAL IN
 THE VAULT. PLEASE KNOW, FPL DOES NOT
 PERMIT ANY ITEMS, ELECTRICAL FIRE
 SPRINKLER ETC IN VAULT.
 PLEASE ALSO SEE IS OUTSIDE AS SHOWN ON
 ANOTHER SHEET, PLEASE VERIFY LOCATION AS
 THIS SEEMS TO BE LOCATED IN THE TRASH
 DRAIN,A ND ACCESS AREA?
  
 2) NOTE: PLEASE SEE PANEL SCHEDULES FOR
 UNITSDO NOT APPEAR TO INDICATE ANY
 WATER HEATERS?? PLEASE SEE PANEL
 SCHEDULES DO SHOW TWO AHU'S BRANCH
 CIRCUITS?
 PLEASE KNOW THIS WAS MISSED ON FIRST
 REVIEW AS ORIGINAL PLANS INDICATE THE
 SAME.
 PLEASE ADJUST LOADS AS NEEDED.
 215,220,422
  
 3) NOTE: PLEASE SEE ONCE LOADS FOR AHU'S
 ARE CORRELATED, PLEASE ADJUST AS NEEDED.
 ** PLEASE KNOW, THE PLANS HAVE BEEN
 REVISED TO NOW ONLY INCLUDE ONE
 BUS-RISER, AND PLEASE SEE LOADS SHOWN
 NOW AFTER ALL DERATING HAS BEEN TAKEN
 STANDS AT 2936A'S ON A 3000A RATED BUS
 AND MAIN. PLEASE SEE IF LOADS FOR AHU'S
 ARE INDEED HIGHER, THIS WILL NEW
 ADJUSTED LOAD MAY CERTAINLY TAKE LOAD
 OVER THE 3000A RATING OF EQUIPMENT.
 PLEASE KNOW, THESE UNITS ARE GOING TO
 HAVE OWNERSHIP AS "CONDOS" AND
 REMODELING ETC ALMOST ALWAYS TAKES
 PLACE.
 PLEASE SEE SERVICE IS BEING SIZED WITH
 NO ALLOTMENT FOR FUTURE EXPANSION.
 **ELECTRICAL APPLIANCES, JACUZZI TUBS
 ETC'
 PLEASE SEE 90.8A "DISTRIBUTION CENTERS
 SHOULD CONTAIN ADDITIONAL SPACE AND
 "CAPACITY" FOR FUTURE ADDITIONS AND
 SHOULD BE CONVENIENTLY LOCATED FOR EASY
 ACCESSIBILITY."
 THIS EXCERPT IS TAKEN FROM THE 2002
 HANDBOOK.
  
 4) NOTE: PLEASE SEE PANEL SCHEDULE FOR
 16A DOES NOT INDICATE "FEED THRU LUGS"
 AND RISER DOES NOT SHOWN "16B" BEING FED
 FROM 16A?
 PLEASE SHOW.
  
 5) NOTE: PLEASE SEE MISSING DOOR
 "OVERLAY" ON 3.2.
  
 6) NOTE: PLEASE SEE NEW NOTE #19 AS
 NOTED ON GENERATOR RISER WHICH MENTIONS
 TO SEE NOTE #19 ON "KEYNOTES", HOWEVER
 KEY NOTE #19 IS BLANK?
 215.5
  
 7) NOTE: PLEASE SEE FS 553.80(2)(B) WITH
 RESPECT TO REPEAT COMMENTS FOR CODE
 COMPLIANCE. THIS IS ONLY A NOTE:
  
 ** PLEASE KNOW, MANY OF THE ABOVE ITEMS
 ARE "REDLINED" AT LOCATIONS ON PLANS FOR
 NOTES.
  
 ** PLEASE KNOW, A RESPONSE LETTER IN
 TYPE WRITTEN FORM WILL HELP IN RESPONSES
 TO ELECTRICAL COMMENTS.
  
 ** PLEASE BE SURE TO SEE ANY POSSIBLE
 COMMENTS FROM OTHER TRADES WHICH MAY
 AFFECT ELECTRICAL PLANS.
  
 ** PLEASE KNOW, ALL OLD/OR VOIDED SHEETS
 MUST BE COMPLETELY REMOVED FROM SETS
 BEFORE RSUBMITTING PLANS.
 PLEASE ONLY SUBMIT ONE SET OF ALL
 OLD/VOIDED SHEETS FOR REFERENCE ONLY.
 ONLY THE NEW REVISED SHEETS SHOULD BE
 INSERTED INTO THE SETS FOR REVIEW AND
 STAMPING.
 PLEASE SEE THIS WAS NOT DONE AS
 REQUESTED FROM PREVIOUS REVIEW
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
2006-05-03 00:00:00REVIEWING
2006-05-01 00:00:00REVIEW IN PROGRESS.
2006-04-27 00:00:00IN ELEC FOR REVIEW


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved