| Date |
Text |
| 2005-11-09 00:00:00 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2005 FUEL GAS |
| | FBC-2001 BUILDING |
| | FBC-2001 CHAPTER 11 |
| | FHA-98 DESIGN MANUAL |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | 1. ALL PLANS DESIGNED BY A PROFESSIONAL |
| | ARCHITECT OR ENGINEER, THEN ALL SHEETS |
| | SHALL BE SIGNED, SEALED & DATED AS |
| | REQUIRED BY FS. SECTION 106.1 |
| | 2. SHTS LA-POOL 3 & LA-POOL 4 PLANS & |
| | PERMIT ARE REQUIRED. PLANS SHALL BE |
| | REVIEWED & STAMPED BY THE PALM BEACH |
| | COUNTY HEALTH DEPT. PRIOR TO SUBMITTING |
| | FOR REVIEW. |
| | 3. SHT T-3 A2.4.1 SUBMIT CALCULATIONS |
| | FOR PRIMARY AND SECONDARY ROOF DRAINS. |
| | SHOW THE SQUARE FOOTAGE FOR EACH AREA & |
| | SHOW 1/2 AREA OF ALL VERTICAL WALLS |
| | INCLUDING PARAPETS ALONG WITH THE AREA |
| | OF ROOF THAT DRAINS ONTO THE ROOF FROM |
| | ABOVE FOR EACH AREA IN CALCLATIONS. |
| | SECTIONS 1106 & 1107 WITH ALL |
| | SUBSECTIONS. |
| | 4. SHTS T-3 A4.1.1 THRU T-3 A4.1.8 UNITS |
| | A, B, C, D, E, H, F, G & K SHALL COMPLY |
| | WITH REQUIREMENTS 1 THRU 7 OF THE FHA-98 |
| | DESIGN MANUAL. INDICATE SPECIFICATION |
| | "A" OR "B" FOR EACH UNIT. SHOW THE W/C |
| | OPENING, (MINIMUM 33"), SHOW THE W/C AT |
| | 18" OFF THE WALL TO THE CENTER OF THE |
| | FIXTURE WHERE APPLICABLE, AND 18" |
| | MINIMUM OFF AN ADJACENT FIXTURE. SEE |
| | PAGES 6.7 7.43 & 7.44. - SHOW CLEAR |
| | FLOOR SPACE FOR ALL USABLE FIXTURES. - |
| | SUBMIT A DETAIL FOR BACKING FOR W/C'S, |
| | TUBS, SHOWERS ECT. PER REQUIREMENT 6. - |
| | CLEAR FLOOR SPACE FOR SHOWERS SHALL BE |
| | PARALLEL TO SHOWER & FLUSH WITH CONTROL |
| | WALL. INDICATE CONTROL WALL ON UNIT |
| | FLOOR PLAN. (SEE PAGE 7.56). |
| | 5. SHT T-3 A4.1.9 MEN'S & WOMEN'S TOILET |
| | ROOMS SHALL COMPLY WITH SECTIONS |
| | 11-4.16, 11-4.19 & 11-4.22 WITH ALL |
| | SUBSECTIONS. SUBMIT A DETAIL SHOWING |
| | COMPLIANCE. |
| | 6. SUBMIT CALCULATIONS FOR ALL |
| | AMENITITES AREAS FOR MINIMUM FACILITIES |
| | PER TABLES 1004.2 (BLDG) AND 403.1 |
| | (PLMG). SHOW THE SQUARE FOOTAGE FOR ALL |
| | COMMON USE AREAS ALONG WITH THE |
| | OCCUPANCY LOAD OF EACH AREA. INDICATE |
| | THE LOCATION OF THE SANITARY FACILITIES |
| | FOR THE POOL AREA. |
| | 7. SHT T-3 A7.1.1 FLOORS AND WALLS IN |
| | TOILET ROOM SHALL BE NONABSORBENT PER |
| | SECTIONS 1210.1 & 1210.2. PLEASE |
| | INDICATE HOW THIS WILL BE ACCOMPLISHED |
| | WITH EXPOSED CONCRETE, GYP. BOARD AND NO |
| | BASE AS SHOWN IN GROUND LEVEL ROOM |
| | FINISH SCHEDULE. |
| | 8. SHT T-3 A4.19 SINK IN CATERING |
| | KITCHEN SHALL COMPLY WITH SECTION |
| | 11-4.24 AND ALL SUBSECTIONS. PROVIDE A |
| | DETAIL. |
| | 9. SHTS T-3 A4.1.13 THRU T-3 A4.1.17 |
| | SHALL COMPLY WITH FHA-98 DESIGN MANUAL |
| | REQUIREMENTS 1 THRU 7. INDICATE |
| | SPECIFICATION "A" OR "B". SHOW CLEAR |
| | FLOOR SPACE FOR ALL USABLE FIXTURES. |
| | SHOW ALL W/C'S TO BE 18" OFF THE WALL TO |
| | THE CENTER OF THE FIXTURE . SHOW ALL |
| | OPENINGS TO BE MINIMUM 33". INDICATE |
| | MEASUREMENT FROM THE CENTER LINE OF THE |
| | W/C'S TO THE ADJONINING FIXTURES. |
| | 10. SHT T-3 A6.1.1 DETAIL #4 TRASH CHUTE |
| | WATER SUPPLY SHALL HAVE BACKFLOW |
| | PROTECTION. INDICATE THE METHOD OF |
| | BACKFLOW PROTECTION REQUIRED IN SECTION |
| | 608 AND TABLE 608.1. |
| | 11. SHT T-3 A6.1.3 DETAIL #10 ROOF DRAIN |
| | DETAIL, INDICATE MEASUREMENT FROM THE |
| | ROOF TO THE TOP OF THE SECONDARY ROOF |
| | DRAIN PIPI, (EMERGENCY OVERFLOW PIPE). |
| | 12. SHT T-3 A8.1.1 SHOW THE BACKING FOR |
| | THE W/C'S PER FHA DESIGN MANUAL PAGES |
| | 6.3 & 6.4. SHOW BACKING FOR THE TUBS PER |
| | PAGE 6.9. |
| | 13. SHT P0.1 PLUMBING NOTES #1 & #24 |
| | REFER TO FBC-2001, CODE ADOPTED FOR THIS |
| | JOB IS FBC-2004. PLEASE CHANGE REFERENCE |
| | 14. SUBMIT A STORM BUILDING DRAIN |
| | ISOMETRIC RISER DIAGRAM. SHOW ALL SQUARE |
| | FOOTAGE AS IT ACCUMULATES. INDICATE THE |
| | RISER NUMBER CONNECTING TO STORM DRAIN. |
| | INDICATE ALL PIPE SIZES AND SLOPE OF |
| | PIPE. |
| | 15. SHT P2.1 NO SANITARY BRANCH LINE |
| | SHOWN TO RISERS S/6, S/9, S/10 OR S/46 |
| | FROM THE BUILDING SANT. DRAIN. PLEASE |
| | SHOW ALL PIPING ON FLOOR PLAN. SECTION |
| | 106.1.1. |
| | 16. SHT P2.3 6" RWL (2200SF) SHOWN IN |
| | THE HALLWAY. PLEASE CLARIFY. SECTION |
| | 106.1.1. |
| | 17. SHT P2.4 SUBMIT CALCULATIONS FOR |
| | PRIMARY AND SECONDARY ROOF DRAINS. (SEE |
| | COMMENT #3). |
| | 18. SHT P4.1 AN RPZV BACKFLOW IS |
| | REQUIRED ON THE WATER SERVICE TO EACH |
| | BUILDING. |
| | 19. SHT P4.1 SHOWS 3" WATER SERVICE TO |
| | EACH TOWER, BUT CIVIL PLANS, SHTS P3.1, |
| | AND P6.4 SHOW 4" WATER SERVICE. PLEASE |
| | CORRELATE PLANS. SECTION 106.1.1. |
| | 20. SHTS P5.1 & P5.2 SUBMIT SOVENT |
| | DESIGN MANUAL FOR THE SOVENT SYSTEM. THE |
| | SOVENT SYSTEM SHALL BE APPROVED. SECTION |
| | 106.1.1. |
| | 21. SHT P5.3 BLDG DRAIN ISOMETRIC RISER |
| | DIAGRAM DOES NOT REFLECT THE FLOOR PLAN. |
| | THE TUB IS MISSING DOWNTREAM OF RISER |
| | S/33 AND TUB IS NOT VENTED AS SHOWN. |
| | SECTIONS 106.1.1 & 901.2.1. - W/C, LAV & |
| | SHOWER ARE NOT SHOWN DOWNSTREAM OF RISER |
| | S/34 (ROOM G 110). - MEN'S & WOMEN'S |
| | TOILET ROOMS , (108 & 109), ARE NOT |
| | SHOWN ON RISER. - THE TUB DOWNSTREAM OF |
| | RISER S/43 IS NOT VENTED AS SHOWN. |
| | SECTION 901.2.1. - LAUNDRY (103) IS NOT |
| | SHOWN DOWNSTREAM OF RISER S/42. - PIPING |
| | TO STUDIO K W/M & BATHROOM (105) |
| | DOWNSTREAM OF RISER S/23 NOT SHOWN. |
| | SECTION 106.1.1. |
| | 22. SHT P5.3 SHOW DFU'S AS THEY |
| | ACCUMULATE IN THE SYSTEM. TABLE 710.1(1) |
| | 23. SHTS P6.1, P6.2, & P6.3 WATER HAMMER |
| | ARRESTORS SHALL BE LOCATED NEAR THE |
| | FIXTURES IN AN 'EFFECTIVE RANGE" NOT IN |
| | THE CEILING AS SHOWN. PDI-WH 201 AND |
| | MANUF. INSTALLATION INSTRUCTIONS. |
| | 24. SUBMIT A CONDENSATE BUILDING DRAIN |
| | ISOMETRIC RISER DIAGRAM SHOWING ALL PIPE |
| | SIZES, TERMINATION POINTS FOR THE |
| | CONDENSATE DRAIN AND VENT. SECTION |
| | 106.3.5.1.3. - SUBMIT CONDENSATE RISER |
| | DIAGRAMS. SHOW ALL PIPE SIZES. |
| | 25. SUBMIT STORM RISER DIAGRAMS AND A |
| | BUILDING DRAIN ISOMETRIC RISER DIAGRAM. |
| | SHOW ALL PIPE SIZES, LOCATION OF ALL |
| | RISER CONNECTIONS, SQUARE FOOTAGE AS IT |
| | ACCUMULATES IN THE SYSTEM, TERMINATION |
| | POINT OF STORM WATER ECT. SECTION |
| | 106.3.5.1.3. |
| | 26. THE FOLLOWING INFORMATION REQUIRED |
| | FOR THE GAS PERMIT: |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. CUT SECTIONS NOT SHOWN |
| | AND MOST RISERS NOT SHOWN. |
| | B. TYPE OF GAS, (LP OR NATURAL) |
| | C. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2 |
| | E. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | F. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUM- |
| | BER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICA |
| | TION PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. THANK |
| | YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |