| Date |
Text |
| 2005-10-11 00:00:00 | DENIED:2004 FBC / TOWER 3 |
| | 1.PLAN SHEET M2.1, PLEASE CLARIFY |
| | DUCTWORK IN THE COVERED WALKWAY.PLAN |
| | INDICATES RETURN AIR GRILLES IN THE |
| | COVERED WALKWAY AND ALSO SHOWS DUCT |
| | BRANCHING OF INTO THE INDIVIDUAL CONDO |
| | UNITS THAT ARE IDENTIFIED AS 'TX' OR |
| | 'DX' WHICH ACCORDING TO THE SCHEDULE ARE |
| | TOILET & DRYER EXHAUST RISERS.ARE ALL |
| | THESE EXHAUST RISERS TIED IN TOGETHER? |
| | |
| | 2.PLEASE CLARIFY IN THE KEY NOTES THE |
| | ACRONYM E/A (EXHAUST AIR)? THIS IS NOT |
| | INDICATED ON ON THE HVAC ABBREVIATIONS |
| | LISTED ON SHEET M0.1. |
| | |
| | 3.PLAN SHEET M2.1, NOT ALL UNITS |
| | INDICATE DRYER EXHAUST DUCT LAYOUT. |
| | PLAN SHEET M5.1 & M5.2 INDICATES INTAKES |
| | ON THE EXHAUST SHAFTS.PLEASE CLARIFY, |
| | IT APPEARS ALL THESE SHAFTS ARE TIED IN |
| | TOGETHER? |
| | |
| | 4.PLAN SHEET M7.1 DETAIL 2, AUXILIARY |
| | DRAIN PAN WITH OVERFLOW PROTECTION |
| | REQUIRED PER 2001 FMC 307.2.3.PLEASE |
| | INDICATE AUXILIARY DRAIN LINE OR WATER |
| | LEVEL DETECTOR. |
| | |
| | 5.DETAIL 2 ON M7.1 ALSO INDICATES |
| | LOUVERED DOOR.PLEASE NOTE, NO |
| | COMBUSTIBLES ALLOWED IN THE RETURN AIR |
| | PLENUM.THIS ALSO INCLUDES THE DOOR. |
| | 2004 FMC 602.2.1. |
| | |
| | 6.PLAN SHEET M5.1 DETAIL 1 AND 2 |
| | REFERENCES THE ARCH PLANS FOR SHAFT |
| | DETAIL.THIS IS NOT SHOWN IN THE ARCH. |
| | |
| | 7.PIPING CHASE INDICATED ON PLAN M5.1 |
| | SHALL COMPLY WITH 2004 FMC 1107.2.1, |
| | WHERE PIPING PASSES THROUGH CONCRETE |
| | FLOORS, THE PIPING SHALL BE PROVIDED |
| | WITH SLEEVES OR THIMBLES. |
| | |
| | 8.REFRIGERANT PIPING PENETRATING |
| | FLOORS SHALL COMPLY WITH ASHRAE 15-2001 |
| | SECTION 8.10.3. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |