| Date |
Text |
| 2006-05-01 00:00:00 | ************ UNSAT 2ND REVIEW ********* |
| | |
| | ** PLEASE SEE NOTES FROM PREVIOUS REVIEW |
| | WHICH NEED TO BE ADDRESSED AND SOME NEW |
| | NOTES DUE TO CHANGES IN PLANS. |
| | |
| | ** PLEASE SEE NOTE BELOW ARE TAKEN |
| | DIRECTLY FROMPREVIOUS REVIEW AND ARE |
| | SO NOTED. |
| | |
| | ************************************** |
| | PLEASE SEE NOTES AT THE END OF COMMENTS |
| | WITH RESPECT TO REMOVAL OF ALL |
| | OLD/VOIDED SHEETS. |
| | ************************************** |
| | |
| | |
| | SAIL CLUB TOWER #4 |
| | |
| | |
| | |
| | |
| | 1)NOTE:NOTE #1 NO, PLEASE SEE PLANS |
| | STILL REFLECT AND NOTE THE 1999 NEC. |
| | PLEASE ALSO SEE REVISED ELECTRICAL PLANS |
| | ARE REQUIRED TO REFLECT THE CODES AND |
| | YEARS IN EFFECT FOR DESIGN. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE CODE REFERENCED ON PLANS LIST |
| | THE 1999 NEC. PLEASE KNOW, AS OF JULY |
| | 1ST 2003, THE STATE ADOPTED THE 2002 |
| | NEC. |
| | PLEASE ALSO SEE WE ARE UNDER THE 2003 |
| | NFPA-101 AND 2002 NFPA-72 |
| | PLEASE ADJUST. |
| | |
| | 2)NOTE: NOTE #2, OK, HOWEVER PLEASE SEE |
| | ANYBLDG, FIRE REVIEW COMMENTS AS THEY |
| | MAY AFFECT DESIGN. PLEASE SEE NEW |
| | COMMENTS DUE TO CHNAGES AT FPL VAULT |
| | LOCATION. |
| | |
| | 3)NOTE: NOTE #3 NO, PLEASE SEE AREAS |
| | WHERE SOME CIRCUTING IS STILL MISSING. |
| | |
| | ** PREVIOUS NOTE** |
| | PLEASE SHOW ALL CIRCUITING ON PLANS AND |
| | CORRELATE WITH THE SUBMITTED PANEL |
| | SCHEDULES. |
| | PLEASE SEE SOME AREAS WHICH ELECTRICAL |
| | FIXTURES SEEM TO BE MISSINGTHIS. |
| | PLEASE ALSO SEE CIRCUITING FOR UNITS. |
| | PLEASE KNOW, A "TYPICAL" UNIT LAYOUT MAY |
| | BE PROVIDED, HOWEVER A LAYOUT WOULD BE |
| | REQUIRED FOR EACH UNIT TYPE, INCLUDING |
| | STUDIO UNIT. |
| | CIRCUITING FOR SOME UNITS/ITEMS CAN NOT |
| | BE VERIFIED AT THIS TIME. |
| | |
| | 4)NOTE: NOTE #4 NO, PLEASE SEE REPSONSE |
| | LETTER MENTIOSN TO SEE E 3.1, HOWEVER |
| | PLEASE SEETHIS SHEET ONLY SHOWS ONE |
| | AREA OF FIRST FLR COMMON AREA. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE PHOTO-METRICS FOR |
| | STAIR TOWERS ON NORMAL PWR AND STAND-BY. |
| | ALONG WITH WALK AREAS. |
| | PLEASE SEE STAIR TOWERS UNDER NORMAL PWR |
| | SHALL MEET A MIN OF 10FT CANDLES. PLEASE |
| | SEE ARES FOR HALLS ETC ARE PERMITTED TO |
| | BE LESS. . |
| | PLEASE SEE NFPA-101 7.8.1.3,7.9.2.1 |
| | |
| | 5)NOTE: NOTE #5 NO, PLEASE KNOW, A |
| | BATTERY BACK UP FIXTURE OF SOME SORT |
| | WILL BE REQUIRED IN STAIR TOWERS AT A |
| | MIN OF EVERY OTHER LEVEL. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE KNOW, BATTERY BACK FIXTURES WILL |
| | BE REQUIRED AT EVERY OTHER LEVEL(MIN). |
| | PLEASE SEE LS 101 WHICH MENTIONS THE |
| | TRIPPING/THROW OF A SINGLE BRKR SAHLL |
| | NOT LEAVE ANY EGRESS AREA IN TOTAL |
| | DARKNESS. PLEASE CALL ELECTRICAL PLAN |
| | REVIEW AND FIRE MARSHALS OFFICE TO GO |
| | OVER OPTIONS PERMITTED. |
| | A BATTERY BACK-UP FIXTURE AT EVERY OTHER |
| | LEVEL WILL SATISFY FIRE MARSHAL'S OFFICE |
| | AND AHJ. |
| | PLEASE BE SURE TO MEET THE MIN OF 1 |
| | FT/CANDLE UNDER EM. |
| | PLEASE BE SURE TO SEE PREVIOUS NOTE #4 |
| | FOR LIGHTING LEVELS.(MIN) |
| | |
| | 6)NOTE: NOTE#6 NO, PLEASE SEE MOST |
| | FIXTURES WERE ADDED TO THESE ROOMS, |
| | HOWEVER PLEASE SEE ELEVATOR MACHINE ROOM |
| | WHICH WILL REQUIRE ARE BATTERY BACK |
| | FIXTURE OF SOME SORT. |
| | IT WAS NOTED, THAT LTS ARE ON EM |
| | CIRCUIT, HOWEVER A BATTERY BACK UP |
| | FIXTURE WILL BE REQUIRED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE BATTERY BACK-UP |
| | FIXTURES IN MAIN ELECTRICAL RMS AND |
| | ELEVATOR ROOM(S), GENERATOR AND FIRE |
| | PUMP ROOM. PLEASE ALSO PROVIDE |
| | CIRCUITING FOR THESE |
| | RMS. |
| | |
| | 7)NOTE: NOTE #7 NO, RESPONSE MENITONS TO |
| | SEE E 5.1, HOWEVER NO DETAIL WAS SHOWN |
| | ON PLANS. |
| | PLEASE ALSO KNOW DETAILSHALL INCLUDE |
| | CURBING ALL FOUR SIDES. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE CURB DETAIL FOR |
| | BUS-DUCT RISER AND FLOOR PENATRATIONS. |
| | 368.6 |
| | |
| | 8)NOTE: NOTE #8, OK, HOWEVER PLEASE |
| | CONTINUE WITH NOTE FOR ALL MIN |
| | CLEARENCES PER 110.26 SHALL BE MET. |
| | NOTE FOR PANIC HARDWARE WAS ADDED WHICH |
| | WAS OK. |
| | NOTE WAS NOT ADDED FOR ALL. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASSE PROVIDE NOTE ON RISER AND |
| | ELECTRICAL ROOM SHEETS FOR REQUIREMENTS |
| | FOR 110.26 FOR PANIC HARDWARE AND DOOR |
| | SWINGS. PLEASE SEE MIN CLEARENCE PER |
| | 110.26 |
| | PLEASE ALSO SEE MIN DOOR OPENING 6' WITH |
| | SINGLE ACCESS FOR EQUIPMENT MORE THAN |
| | 1200A'S AND OVER 6' WIDE. |
| | |
| | |
| | 9)NOTE:NOTE # 9, OK, CHANGED TO |
| | FEEDERS FROM BUS-DUCT, HOWEVER PLEASE |
| | SEE NEW COMMENTS FOR VAULT AND FOR |
| | SIZING OF SEC'S. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE RISER INDICATES ALL |
| | BUS-DUCT FROM FPL VAULT TO MAIN |
| | ELECTRICAL ROOM AS OVER-HEAD. PLEASE SEE |
| | 230.70, 230.6, NO MORE THAN 8' OF |
| | UNPROTECTED CONDUCTORS/ OR BUS DUCT |
| | PERMITTED "INSIDE THE BLDG. |
| | PLEASE SEE ROUTING OF BUS-DUCT APPEARS |
| | TO SHOW INSTALLATION INSIDE CONDO |
| | UNITS?? |
| | PLEASE PROVIDE LAYOUT, REVISE TO |
| | UNDER-GROUND FEEDERS OR OTHER ACCEPTABLE |
| | MEANS. |
| | |
| | 10)NOTE: NOTE #10, NO, ?? PLEASE SEE |
| | PLANS INDICATE THIS AS HAVING A 3-POLE |
| | MAIN, HOWEVER THERE IS NO INDICATION OF |
| | THE MANUAL MENAS OF DISCONNECT, LOCATED |
| | ON THE OUTSIDE. RESPONSE MENTIONS THIS |
| | WAS ADDRESSED IN A PREVIOUS REVISION, |
| | HOWEVER WE HAVE NOT SEEN ANY OTHER |
| | REVSIONS BEFORE THIS SUBMITTIAL. PLEASE |
| | SEE NEW NOTES FOR MAIN AS NOTED ON RISER |
| | "KEY NOTES"". |
| | |
| | ** PREVIOUS NOTES ** |
| | PLEASE PROVIDE INFORMATION ON |
| | BUS -DUCT RISER MAINS. APPEARS TO SHOW |
| | THESE AS "SHUNT-TRIP" AND NOT CONTAINING |
| | A MANUAL MEANS OF DISCONNECT LOCATED ON |
| | THE OUTSIDE OF THE EQUIPMENT. PLEASE SEE |
| | MAIN PANEL SCHEDULE(S), THESE DO NOT |
| | SEEM TO INDICATE A MCB. |
| | 230.76,230.79 |
| | |
| | 11)NOTE: NOTE #11, OK, HOWEVER SEE NOTES |
| | UNDER GARAGE PERMIT FOR ROOMS. |
| | PLEASE ALSO PROVIDE MIN LAYUOUT , AS |
| | THESE CAN BE REFERENCED UNDER A SEPARATE |
| | PERMIT. PLEASE SEE RESPONSE MENTIONS TO |
| | SEE REVISED 4.1, HOWEVER ONLY THE GEN RM |
| | SHOWS SOME SORT OF ELECTRICAL. PLEASE |
| | SEE MIN FT CNADLE FOR GEN RM SHAL BE 30 |
| | FT CANDLES, WHICH IS NOTED UNDER GARAGE |
| | PERMIT. |
| | PLEASE ALSO KNOW, THESE AREAS WHERE THE |
| | GARAGE IS LOCATED SHALL BE 100% COMPLETE |
| | AND A CO MUST BE OBTAINED BEFORE |
| | ISSUANCE OF ANY TCO OR CO FOR TOWER |
| | BUILDINGS. THIS IS ONLY ANOTE AT THIS |
| | TIME TO HELP WITH THE PHASING OF THE |
| | PROJECT. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE GARAGE PLANS FOR FIRE PUMP |
| | RM AND GEN RM ARE SHOWN BLANK? |
| | |
| | 12)NOTE: NOTE #12 NO, PLEASE SEE |
| | REPSONSE MENTIONS TO SEE E5.2, HOWEVER |
| | E5.2 DOES NOT REVISE INFORMATION ON |
| | BUS-DUCT? PLEASE CORRELATE WITH NOTES ON |
| | E0.1 AS NOTES SEEM TO CHNAGE ALL |
| | BUS-DUCT TO COPPER. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE SPECIFIC INFORMATION ON |
| | BUS-DUCT, PLEASE SEE AN ALUM EQUIPMENT |
| | GROUNDING CONDUCTOR/ MATERIAL IS NOT |
| | PERMITED. |
| | 310.2. LOCAL AMENDMENTS. |
| | |
| | 13)NOTE: NOTE #13 NO, RESPONSE MENTIONS |
| | FOR CONTRACTOR TO SUBMIT, HOWEVER THIS |
| | WAS NOT DONE. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT ALL MANUFACTURE SPECS AND |
| | CUT SHEETS FOR GENERATOR, ATS, |
| | FIRE PUMP AND FIRE PUMP CONTROLLER. |
| | PLEASE ALSO SUBMIT THE SAME FOR ANYSUB |
| | BASE FUEL TANK. |
| | PLEASE KNOW, DUE TO THE INFORMATION NOT |
| | BEING SUBMITTED AT THIS TIME, REVIEW FOR |
| | SOME ITEMS FOR CODE COMPLIANCE CAN NOT |
| | BE DONE. |
| | UNABLE TO VERIFY CODE COMPLIANCE FOR |
| | MANY ITEMS UNDER NFPA, 20,70,101,110 |
| | ETC. |
| | SOME INFORMATION IS "APECIFIED" ON PLANS |
| | FOR TOWER #4, HOWEVER, TOWER #3 SHOULD |
| | REFLECT THE SAME INFORMATION. ALL |
| | MANUFACTURE CUTS/SPECS ARE STILL |
| | REQUIRED. |
| | |
| | 14)NOTE:NOTE # 14 NO, SAME NOTE. |
| | RESPONSE MENTIONS TO SEE REVISED, |
| | HOWEVER COULD NOT LOCATE INFORMATION |
| | NEEDED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE ELECTRICAL RISER DIAGRAM DOES |
| | CONTAININFORMATION FOR FIRE PUMP, YET |
| | NOT FIRE PUMP CONTROLLER, |
| | SERVICE, SIZING, LOCKED ROTOR SETTINGS |
| | ETC. |
| | PLEASE COMPLETE. |
| | ENCASEMENT IN CONCRETE, OUTSIDE THE |
| | BLDGS, ETC |
| | |
| | 15)NOTE: NOTE #15 OK,SEE NOTE MENTIONED |
| | ABOVE. |
| | |
| | 16)NOTE: NOTE #16, OK, HOWEVER PLEASE |
| | SEE NEW COMMENT FOR H12A. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE A PANEL SCHEDULE FOR A PANEL |
| | H12B IS SUBMITTED, HOWEVER THIS PANEL |
| | COULD NOT BE LOCATED ON RISER |
| | DIAGRAM?? |
| | PLEASE CORRELATE. |
| | |
| | 17)NOTE: NOTE #17 YES AND NO, PLEASE SEE |
| | THE FIRST PART OF THE NOTE REQUESTED A |
| | TYPICAL DISCONNECT DETAIL WHICH WAS |
| | DONE, HOWEVER PLEASE SEE HEAT FOR AHU'S |
| | FOR UNITS STILL DO NOT COORELATE. PLEASE |
| | ALSO SEE NOTE #41 |
| | |
| | ** PREVIOUS NOTE ** |
| | PART 2) |
| | PLEASE CORRELATE ALL A/C KW RATINGS AND |
| | LOADS WITH MECHANICAL PLANS. (KW RATINGS |
| | ETC. ) |
| | |
| | |
| | 18)NOTE:NOTE #18 NO, PLEASE RESPONSE |
| | MENTIONS TO SEEE5.1 FOR REVISED PLANS, |
| | HOWEVER 5.1DID NOT SHOW THIS? PLEASE |
| | SEE A ROOM LAYOUT ON3.1 WAS LOCATED, |
| | HOWEVER DID NOT SEEM TO CONTAIN ALL |
| | REQUIRED EQUIPMENT, PANELS ETC. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE FIRE REVIEW NOTES |
| | ALSO: PLEASE PROVIDE A LAYOUT FOR |
| | CENTRAL STATION RM(FIRE COMMAND RM) |
| | SHOWING ALL DEVICES/ PANELS/ STATUS |
| | PANELS ETC. |
| | PLEASE LIST ALL ITEMS AS SPECIFIED IN |
| | NFPA- 101 11.8.5, |
| | |
| | 19)NOTE: PLEASE SEE MOST WERE CORRECTED, |
| | ONLY ONE OR TWO WERE MISSING OR LOCATED |
| | NOT TO SPACING, THESE CAN BE REDLINED , |
| | HOWEVER IF REDLINES ARE VIEWED, PLEASE |
| | SEE POSSIBLE AREAS. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE RECEPTS MISSING PER |
| | 210.52 |
| | SEE REDLINED PLANS. |
| | |
| | 20)NOTE:NOTE #20 OK. |
| | |
| | 21)NOTE:NOTE #21 OK. |
| | |
| | 22)NOTE: NOTE #22 NO, COULD NOT LOCATE |
| | NOTE. RESPONSE MENTIONS E0.1 |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PROVIDE NOTE ON PLANS FOR SMOKE |
| | DETECTOR PLACEMENT PER REQUIREMENTS NFPA |
| | -72 11.8.3.5. |
| | |
| | 23) NOTE: NOTE #23 OK.: |
| | |
| | 24) NOTE: NOTE #24 OK. |
| | |
| | 25)NOTE: NOTE #25 OK, HOWEVER PLEASE SEE |
| | NEW NOTE. (MINOR CHANGE NEED FOR PANEL |
| | SCHEDULE. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE A 70A BRKR IS BEING SHOWN FOR |
| | RANGE?? PLEASE SEE 210.23,422.11B |
| | 50A RANGE RECEPT, 50A BRKR MAX. |
| | |
| | 26)NOTE: PLEASE SEE PANEL SCHEDULES SEEM |
| | TO SHOW "A" AND "C" PHASE FOR SINLGLE |
| | PHASE SERVICE AND UNITS?? |
| | PLEASE CLARIFY / ADJSUT. |
| | 215.5 |
| | |
| | 27)NOTE: NOTE #27 NO, PLEASE SEE MANY |
| | AREAS SHWON AS LIVING RM AND CIRCUITED |
| | FOR SMALL APPLIANCE. PLEASE SEE AREAS |
| | SEEM TO HAVE IDENTIFICATION SWITCHED. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE LABEL AND /OR CLARIFY "DINING" |
| | AREAS IN ALL UNITS. |
| | UNABLE TO VERIFY CIRCUITING AS DINING |
| | /LIVING ARE SEEMED TO BE COMBINED.' |
| | PLEASE SEE 210.52B1 |
| | |
| | 28)NOTE:OK. |
| | |
| | 29)NOTE: NOTE #29, NO, PLEASE SEE |
| | REDLINED PLANS AS SOME AREAS FOR HALLWAY |
| | WALLS. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE MISSING RECEPTS IN HALLWAY |
| | AREAS, 10' OR MORE OF CONTINUOUS |
| | WALL. 210.52H. |
| | |
| | 30)NOTE: NOTE #30 NO, ? PLEASE SEE |
| | REPSONSE MENTIONS TO SEE REVISED 5.1, |
| | HOWEVER NO CHANGES COULD BE LOCATED TO |
| | PLANS. |
| | PLEASE ALSO SEE NO PANEL SCHEDULE ETC |
| | WAS SUBMITTED.? |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE RISER SEEMS TO INDICATE A |
| | POOL PANEL, HOWEVER NO OTHER |
| | INFORMATION WAS SUBMITTED AND PANEL |
| | COULD NOT LOCATED ON PLANS. |
| | LOADS ETC. |
| | 215.5, 220 |
| | |
| | 31)NOTE: OK, AS NOTED. |
| | |
| | 32)NOTE: NOTE #32 NO, AS IT SEEMS NOTE |
| | WAS NOT COMPLETE. PLEASE SEE RESPONSE |
| | MENTIONS "LIGHTNING PROTECTION NOT |
| | REQUIRED", THIS IS TRUE AND NOTE WAS NOT |
| | TO REQUEST A LPS. |
| | PLEASE PLACE A NOTE ON "ROOF PLANS" |
| | WHICH STATES "ANY LIGHTNING PROTECTION |
| | SYSTEM INSTALLE SHALL MEET NFPA-780 AND |
| | SHALL BE UNDER A SEPARATE PERMIT." |
| | OR WORDS TO THAT AFFECT. |
| | SOMEHOW THE NOTE WAS NOT PRINTED AS |
| | TYPED? |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE PLACE NOTE ON "ROOF PLANS" WHICH |
| | WILL REQUIRE ALL LIGHTNING PROTECTION |
| | |
| | |
| | 33)NOTE:OK. |
| | |
| | 34)NOTE: OK. |
| | |
| | 35)NOTE: OK. |
| | |
| | 36) NOTE:OK |
| | |
| | 37)NOTE: OK, HOWEVER SEE NEW NOTE. |
| | |
| | 38)NOTE: OK. |
| | |
| | 39)NOTE: NOTE: NO, PLEASE SEE RESPONSE |
| | MENTIONS TO SEE RISER E5.1? THIS COMMENT |
| | IS FOR JOBSITE SPEC BOOKS. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SUBMIT "SPEC BOOKS' FOR REVIEW OF |
| | PROJECT. |
| | THESE WOULD CONTAIN JOBSITE SPECS. |
| | |
| | 40)NOTE:OK. |
| | |
| | 41)NOTE:NOTE #41 NO, PLEASE SEE |
| | MECHNICAL PLANS AS NOTED ABOVE FOR KW |
| | RATINGS INDICATED. |
| | PLEASE SEE THIS COMMENT WAS FOR UNITS |
| | AND SOME IN HOUSE AREAS. |
| | YES, THE OCP WAS SHOWN CORRECT AT 125% |
| | ON ELECTRICAL PANEL SCHEDULE FOR THE KW |
| | HEAT WHICH WAS SHOWN. PLEASE KNOW, THE |
| | COMMENT WAS BASED ON KW AS INDICATED ON |
| | MECHANICAL PLANS AND NOTE #17. |
| | |
| | ** PREVIOUS NOTE ** |
| | PLEASE SEE MIN OCP FOR AHU HEAT |
| | TO BE 125%. 424.3B |
| | SHOWS 50A OCP. |
| | |
| | 42)NOTE: OK. |
| | |
| | |
| | *************************************** |
| | *************** NEW NOTES ************* |
| | |
| | 1) NOTE: PLEASE SEE "KEY NOTE" #8 WHICH |
| | NOW MENTIONS A 3000A MCB FOR BUS RISER |
| | "ML", HOWEVER SEC'S ARE ONLY RATED FOR |
| | 2520A'S. PLEASE SEE 240.4C FOR DEVICES |
| | RATED OVER 800A'S. |
| | PLEASE ALSO CORRELATE AS BUS-DUCT RISER |
| | IS ONLY RATED @ 2500A'S. |
| | 240.4,310.16 ETC. |
| | 215.5 |
| | |
| | 2) NOTE: PLEASE SEE H12A, PLANS NOW SHOW |
| | H12B BEING FED FROM THIS, PLEASE |
| | INDICATE IF "FEED THRU LUGS" OR IF OCP |
| | AND FEEDERS ARE BEING INSTALLED. |
| | 215.5 |
| | |
| | 3) NOTE: PLEASE INDICATE ON PANEL |
| | SCHEDULE ALL APPLIANCES AS GAS WHERE |
| | APPLICABLE. "GAS RNAGE", GAS WH" ETC. |
| | |
| | 4) NOTE: PLEASE SEE A GORUNDING NOTE #19 |
| | ON RISER AT GENERATOR MENTIONS TO SEE |
| | KEY NOTE FOR THIS, HOWEVER #19 ON KEY |
| | NOTES IS BLANK? |
| | |
| | 5) NOTE: PLEASE SEE 7.1 AS THIS SEEM TO |
| | CONTAIN A "MISPRINT" FOR THE ATS IN THE |
| | MAIN ELECTRICAL ROOM. THIS IS SHOWN AS |
| | ATS-3, HOWEVER THIS IS TOWER #4. |
| | |
| | 6) NOTE: PLEASE OBTAIN A LETTER OF |
| | APPROVAL FROM FPL ( MR. BILL HARTIGAN |
| | FOR APPROVAL AND CHANGE OF FPL VAULT AS |
| | SHOWN. |
| | PLEASE ALSO SEE NOTES FOR TOWER #3 FOR A |
| | SIMILAR COMMENT. |
| | |
| | |
| | |
| | ** PLEASE KNOW, MANY OF THE ABOVE ITEMS |
| | ARE "REDLINED" AT LOCATIONS ON PLANS FOR |
| | NOTES. |
| | |
| | ** PLEASE KNOW, A RESPONSE LETTER IN |
| | TYPE WRITTEN FORM WILL HELP IN RESPONSES |
| | TO ELECTRICAL COMMENTS. |
| | |
| | ** PLEASE BE SURE TO SEE ANY POSSIBLE |
| | COMMENTS FROM OTHER TRADES WHICH MAY |
| | AFFECT ELECTRICAL PLANS. |
| | |
| | ************************************ |
| | |
| | ** PLEASE KNOW IT WAS REQUESTED ON |
| | PREVIOUS REVIEW BEFORE RESUBMITTING |
| | PLANS FOR ALL OLD/VOIDED SHEETS TO BE |
| | COMPLETELY REMOVED FROM SETS. PLEASE SEE |
| | THIS WAS NOT DONE AND ALL NEW SHEETS |
| | WERE INSERTED INTO NEW SETS. PLEASE |
| | KNOW, WE ONLY REQUIRE "ONE" COPY OF THE |
| | OLD REMOVED SHEETS. THESE SHOULD BE |
| | BUNDLED INTOONE SET AND SUBMITTED |
| | ALONG WITH THE THREE NEW REVISED SETS. |
| | PLEASE KNOW, THIS WILL EFFECT THE PLAN |
| | REVIEW PROCESS AND HELP TO EXPEDITE |
| | PROJECT. |
| | |
| | *********************************** |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | |
| 2006-04-28 00:00:00 | REVIEW IN PROGRESS. |
| 2006-04-27 00:00:00 | IN ELEC FOR REVIEW. |
| | REVIEW TO CONTINUE ON 4/28 |