| 2006-06-25 00:00:00 | REVIEW BACK IN PROGRESS |
| | |
| | *** SEE NOTES BELOW.*** |
| | |
| | PLEASE KNOW, PLANS ARE IN GOOD SHAPE. |
| | THE ELECTRICAL DESIGN TEAM HAS ADDRESSED |
| | COMMENTS WITH ONLY VERY MINOR ITEMS |
| | REDLINED. |
| | REVIEW PASSED. STAMPED ALL THREE SETS OF |
| | ELECTRICAL PLANS, GENERATOR, ATS, FIRE |
| | PUMP, AND FIRE PUMP CONTROLLER |
| | SUBMITTIALS ALONG WITH REVISED SPEC |
| | SHEETS. |
| | |
| | ** PLEASE SEE ONLY NOTE #1 BELOW SHOULD |
| | BE VERIFIED WITH THIS OFFICE BEFORE |
| | FINAL ELEVATION OF THE EPSS EQUIPMENT |
| | AND BEFORE INSTALLATION OF FORMS FOR THE |
| | LOCATION OFGEN RM, AND MAIN ELECTRICAL |
| | RM. AND THE FIRE PUMP ROOM. |
| | |
| | 1) NOTE:PLEASE KNOW, THE ELEVATION OF |
| | EPSS "SHALL"MEET NFPA-110 2002. |
| | 7.2.3*THE ROOMS, SHELTERS, OR SEPARATE |
| | BUILDINGS HOUSING LEVEL 1 OR LEVEL 2 |
| | EPSS EQUIPMENT SHALL BE DESIGNED AND |
| | LOCATED TO MINIMIZE THE DAMAGE FROM |
| | FLOODING, INCLUDING THAT CAUSED BY THE |
| | FOLLOWING: |
| | (1) FLOODING RESULTING FROM FIRE |
| | FIGHTING |
| | (2) SEWER WATER BACKUP |
| | (3) SIMILAR DISASTERS OR OCCURRENCES BE |
| | |
| | ** PLEASE SEE COMMENTARY MENTIONS |
| | CONSIDERATIONS, HOWEVER 110, 7.1.3(3) |
| | ALSO STATES DETERMINATIONS SHALL BEPER |
| | AHJ. |
| | PLEASE SEE THE FOLLOWING IS TAKEN |
| | DIRECTLY OUT OF NFPA-110 |
| | |
| | **A.7.2.3 EPSS EQUIPMENT SHOULD BE |
| | LOCATED ABOVE KNOWN PREVIOUS FLOODING |
| | ELEVATIONS WHERE POSSIBLE. |
| | |
| | **A.7.2.4(3)EPSS DESIGN SHOULD CONSIDER |
| | THE "100-YEAR STORM" FLOODING LEVEL OR |
| | THE FLOODING LEVEL PREDICTED BY THE |
| | SLOSH MODELS FOR A CLASS 4 HURRICANE. |
| | |
| | |
| | ** PLEASE SEE THE FOLLOWING ITEMS WERE |
| | REDLINED ON PLANS AND THERE IS NO NEED |
| | FOR CORRECTIONS.THESE ARE MINOR ITEMS |
| | MISSING AS PREVIOUSLY NOTED AND CAN BE |
| | REVISED AT LATER DATE AS PLANS WILL MOST |
| | LIKELY HAVE SOME SORT OF REVISIONS. |
| | |
| | PLEASE SEE E-24 PANEL SYMBOL REMOVED, |
| | HOWEVER STILL SHOWS "ELEC-PANEL". |
| | |
| | PLEASE SEE E-25 WHAT APPEARS TO BE |
| | DINING AREA, RECEPT CIRCUITED TO |
| | LIGHTING CIRCUIT. VIF. |
| | PLEASE ALSO SEE ON SAME SHEET THE LV |
| | PANEL STILL SHOWN IN CLOSET WHERE THE |
| | LOCATION HAD BEEN REVISED TO NEW |
| | LOCATION. |
| | |
| | PLEASE SEE E-36A MISSING CIRCUIT # FOR |
| | RECEPT IN GRAND SALON. |
| | |
| | PLEASE SEE E-39 AS LV PANEL STILL SHOWN |
| | IN CLOSET WHERE LOCATION HAS BEEN |
| | REVISED. |
| | |
| | PLEASE SEE NOTE REGARDING "BUS-DUCT' |
| | CURBING AS RESPONSE MENTIONS THE CLOSET |
| | SHALL HAVE THIS CURBING AS WAS REVISED |
| | ON "A" SHEET. PLANS WERE NOTED AND |
| | REDLINED ON BOTH RISER SHEETS FOR 368.6 |
| | |
| | |
| | ************************************** |
| | THE FOLLOWING WAS ONLY NOTED ON PLANS |
| | FOR REQ'D INFORMATION. |
| | |
| | 1) A LAYOUT/MAPPING SHALL BE LOCATED IN |
| | THE FIRE COMMAND ROOM INDICATING ALL |
| | LOCATIONS OFMAINS/SERVICES, GENERATOR, |
| | FIRE PUMP. THIS MAPPING SHALL BE COVERED |
| | AND PROTECTED FROM ANY DAMAGE RO |
| | DETERIORATING CONDITIONS. |
| | SIGNAGE REQUIRED AT FCRM, AND AT EACH |
| | OTHER LOCATION OF MAINS AND SERVICES |
| | DENOTING ALL OTHER LOCATIONS OF MAINS |
| | ETC. |
| | 230.2E,700.8,701.9 ETC. |
| | |
| | |
| | *********************************** |
| | |
| | |
| | |
| | PLEASE SUBMIT THE INFORMATION AS |
| | SET-FORTH IN NOTE ONE BEFORE |
| | CONSTRUCTION AS NOTED ABOVE. |
| | |
| | IF THERE ARE ANY QUESTIONS, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2006-06-24 00:00:00 | REVIEW IN PROGRESS/COMMENCED. |
| | REVIEW STOPPED, REVIEW TO CONTINUE ON |
| | SUNDAY 6/25 |
| 2006-06-21 00:00:00 | MEP ROLLS IN ELEC. |