Plan Review Notes
Plan Review Notes For Permit 05070691
Permit Number 05070691
Review Stop B
Sequence Number 10
Notes
Date Text
2007-01-03 11:12:33****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBCFLORIDA BUILDING CODE 2001
  
 REVISION, VARIOUS DATES
  
 1.) NA
  
 2.)REGARDING THE LETTER FROM THE ENGINEER WHICH
 ADDRESSES THE CONTRACTOR'S REQUEST THAT THE MASONRY
 CELLS ABOVE THE BAY DOOR OPENINGS BE POURED WITH THE
 SAME CONCRETE MIX AS THE CAST IN PLACE COLUMNS, PLEASE
 CLARIFY THAT THE FOLLOWING FROM ACI 318 6.1.5.2 HAS
 BEEN ADDRESSED:"TO FLOW AROUND REINFORCEMENT AND TO
 COMPLETELY FILL CAVITIES, GROUT, WHETHER PUMPED OR
 POURED, NEEDS TO BE VERY FLUID.THIS NECESSITATES A
 HIGHER WATER CONTENT THAN FOR MASONRY MORTARS. . . .
 CAVITY SIZE AFFECTS THE GROUT'S CONTACT SURFACE AREA.
 THE GREATER THE SURFACE AREA THE GREATER THE AMOUNT OF
 WATER ABSORBED."ADDRESS DESIGN CONCRETE STRENGTH.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved