Plan Review Notes
Plan Review Notes For Permit 05070627
Permit Number 05070627
Review Stop P
Sequence Number 2
Notes
Date Text
2006-01-30 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 A. FROM PREVIOUS REVIEW. COMMENT NUMBERS
 SHALL REMAIN THE SAME:
 1. SHT A1.1 EMPLOYEE RESTROOM SHALL BE
 ACCESSIBLE PER SECTION 11-4.22. (PLEASE
 SUBMIT A DETAIL SHOWING COMPLIANCE WITH
 SECTIONS 11-4.16, 11-4.19, AND 11-4.22
 AND ALL SUBSECTIONS).
 2. PLANS SHALL BE ROUTED TO DBPR
 DIVISION OF HOTELS AND RESTURANTS FOR
 REVIEW. ALL SETS OF PLANS SHALL BE
 REVIEWED AND STAMPED WITH TWO PAGE
 "WORKSHEETS" ATTACHED TO EACH SET PRIOR
 TO RESUBMITTING TO CITY WPB FOR REVIEW.
 SECTION 101.4.7. (NO RESPONSE, NOT
 ADDRESSED).
 3. SHT A1.1 STEAM ROOMS 160 AND 163.
 SUBMIT A DETAIL INDICATING WHERE THE
 STEAM UNITS FOR THESE ROOMS IS LOCATED.
 SHOW ALL PIPEING FOR STEAM LINES SHOWING
 ALL PIPE SIZES. SHOW PAN FOR STEAM UNITS
 IF LOCATED ABOVE THE CEILING AND
 INDICATE HOW THE P/T LINE WILL BE
 INSTALLED. SECTION 104.2.1. (THIS HAS
 BEEN CHANGED TO ONE STEAM ROOM, #154,
 BUT COMMENT STILL NOT ADDRESSED).
 4. SHOWER DELETED.
 5. OK
 6. SHT A10.1 DETAILS SHALL SHOW THE
 FOLLOWING:
 -FOR W/C'S
 A. 11-4.16.2 CLEAR FLOOR SPACE
 B. 11-4.16.5 FLUSH CONTROLS
 -FOR LAVS
 A. 11-4.19.3 CLEAR FLOOR SPACE
 B. 11-4.19.4 EXPOSED PIPES & SURFACES
 C. 11-4.19.5 FAUCETS
 D. OK
 (NO RESPONSE, NOT ADDRESSED)
 7. OK
 8. ALL PME SHEETS ENGINEER SHALL LEGIBLY
 INDICATE THEIR NAME, ADDRESS AND LICENSE
 NUMBER ON EACH SHEET. NAME AND LICENSE
 NUMBER NOT SHOWN IN THE TITLE BLOCK. FAC
 61G15-23.002(2) AND FS 471.025. (NO
 RESPONSE, NOT ADDRESSED).
 9. WILL PROVISO
 10. SHT PD1.1B KEYED NOTES #6 NOT FOUND.
 PLEASE CLARIFY. SECTION 104.2.1. (NOTE
 FOUND, BUT FIXTURES NOT SHOWN).
 11. OK.
 11. SHT P1.1A WATER FILTERS SHALL COMPLY
 THE "NSF - 42" STANDARD. PLEASE SUBMIT
 MANUF. SPECIFICATIONS FOR FILTER.
 SECTION 611.1. (SECOND COMMENT #11 - NO
 RESPONSE, NOT ADDRESSED).
 12. SHT P1.1C KEYED NOTES #3 SUBMIT A
 DETAIL FOR THE VENT CAP. VENT SHALL
 TERMINATE IN COMPLIANCE WITH SECTION
 904.5. SUBMIT AN ELEVATION FOR THE TRASH
 AREA TO DETERMINE IF VENT WILL BE
 APPROVED IN AREA WITHOUT TERMINATING
 ABOVE THE ROOF OF THE TRASH AREA.
 SECTION 104.2.1. (NO RESPONSE, NOT
 ADDRESSED).
 13. SUBMIT A SANITARY ISOMETRIC RISER
 DIAGRAM SHOWING ALL PIPE SIZES, TRAPS,
 VENTS, POINTS OF CONNECTION, AND DFU'S
 AS THEY ACCUMULATE IN THE DRAINAGE
 SYSTEM. SECTION 104.3.1.1. (NO RESPONSE,
 NOT ADDRESSED).
 14. SUBMIT A GREASE ISOMETRIC RISER
 DIAGRAM. SHOW ALL PIPE SIZES, TRAPS,
 VENTS, POINTS OF CONNECTION, ECT.
 SECTION 104.3.1.1. (NO RESPONSE, NOT
 ADDRESSED).
 15. SUBMIT A WATER ISOMETRIC RISER
 DIAGRAM, SHOWING ALL PIPE SIZES, VALVES,
 WATER HAMMER ARRESTORS, (REQD. BY
 SECTION 604.9), AND LOCATED NEAR THE
 FIXTURES AS REQUIRED BY PDI-WH 201 &
 MANUF. INSTALLATION INSTRUCTIONS, AND
 POINTS OF CONNECTION. SECTION 104.3.1.1.
 (NO RESPONSE, NOT ADDRESSED).
 16. A SEPARATE GAS PERMIT IS REQUIRED.
 SUBMIT THE FOLLOWING INFORMATION:
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
 C. TYPE OF GAS, (LP OR NATURAL).
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 F. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2.
 H. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 I. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 J. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
 ***NO RESPONSE, NOT ADDRESSED ALL GAS
 PERMIT REQUIREMENTS*********************
  
 ****NEW COMMENT****
 1B. SEE ATTACHED SHEET CONCERNING THE
 DESIGN PROFESSIONAL, AND FS
 553.80.(2)(B)
 2B. FLOOR PLANS HAVE CHANGED FROM FIRST
 SUBMITTAL TO THE SECOND SUBMITTAL. IF
 FLOOR PLAN CHANGES PRIOR TO THIRD
 SUBMITTAL, MORE COMMENTS MAY BE
 FORTHCOMING.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
 SUBMIT ONE COPY OF PLANS FROM PREVIOUS
 REVIEW WHEN RESUBMITTING.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692