| Date |
Text |
| 2005-08-04 00:00:00 | 1) FBC-2001 424.2.8.1 VALVES SHALL BE |
| | MADE OF MATERIALS THAT ARE APPROVED IN |
| | THE FLA BLDG CODE, PLUMBING.THEY WILL |
| | BE READILY ACCESSIBLE FOR MAINT. AND |
| | REMOVAL.SEC 424.2.8.2 FULL WAY VALVES |
| | SHALL BE INSTALLED TO INSURE PROPER |
| | FUNCTION OF THE FILTRATION AND PIPING |
| | SYSTEMS.SEC 424.2.8.3 WHERE CHECK |
| | VALVES ARE INSTALLED THEY SHALL BE OF |
| | THE SWING OR VERTICAL CHECK PATTERNS. |
| | SEC 424.2.8.4 COMBINATION VALVES SHALL |
| | REQUIRE APPROVAL OF THE ADMINISTRATIVE |
| | AUTHORITY PRIOR TO THEIR INSTALLATION. |
| | 2) FBC-2001 SEC 424.2.6.1 ENGINEERING |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-5. (ADD TO NOTES) |
| | 3) FBC-2001424.2.6.6.2 SHOW COMPLIANCE |
| | WITH ANSI/ASME A112.19.8M. PROVIDE MODEL |
| | NUMBER AND MANUF INFO FOR VAC LOCK. |
| | (GIVE DETAIL, SUBMITTAL OR ADD TO NOTES) |
| | 4) FBC-2001424.2.6.6.5 WHERE PROVIDED, |
| | THE VACUUM OR PRESSURE CLEANER FITTING |
| | SHALL BE LOCATED AT LEAST 6" AND NOT |
| | GREATER THAN 12" BELOW THE MINIMUM OPER- |
| | ATING WATER LEVEL OR AS AN ATTACHMENT TO |
| | THE SKIMMER. |
| | 5) FBC-2001 424.2.12.1 PRESSURE TESTS. |
| | PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. (ADD TO NOTES) |
| | 6)FBC-2001 424.2.9 WATER SUPPLY LOCAL |
| | ORD. # 2853-95, BACKFLOW REQUIRED ON |
| | WATER SERVICE. (ADD TO NOTES) |
| | 7)FBC-2001 424.2.13.2 JOINTS AND |
| | CONNECTIONS, FBC PLBG SEC. 605.21 PURPLE |
| | PRIMER REQUIRED ON PVC PIPING (ADD TO |
| | NOTES) |
| | 8.FBC-2001 424.2.15 GAS PIPING SHALL |
| | COMPLY WITH FBC FUEL GAS. SEPARATE PLANS |
| | AND PERMIT REQUIRED. |
| | PLUMBING PLAN REVIEW BY; |
| | JOHN LEECH |
| | 805-6695 |