| Date |
Text |
| 2007-04-30 14:02:07 | DENIED REVISION |
| | REFERENCE: |
| | ** FBC-2004 PLUMBING. |
| | ** FBC-2004 CHAPTER 1, THE CITY OF |
| | WEST PALM BEACH AMENDMENTS. |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE: |
| | |
| | 1. SHEET 3 OF 4: CLEARLY INDICATE ON THE REVISION |
| | RESUBMITTAL IF THE BOOSTER PUMPS ARE FOR THE POTABLE |
| | WATER SYSTEM OR THE FIRE SYSTEM. |
| | |
| | 2. PLEASE INDICATE ON THE RESUBMITTAL HOW THE BOOSTER |
| | PUMPS ARE ANCHORED TO MEET 140 MPH WIND LOADS PER |
| | FBC-2004 SECTION 1603.1.4 WIND DESIGN DATA AND SECTION |
| | 1609.1.3 ANCHORAGE AGAINST OVERTURNING, UPLIFT AND |
| | SLIDING. (DETAIL REQUIRED) |
| | |
| | 3. PER FBC-2004 PLUMBING, SECTION 606.5.5 LOW-PRESSURE |
| | CUTOFF REQUIRED ON BOOSTER PUMPS: A LOW-PRESSURE CUTOFF |
| | SHALL BE INSTALLED ON ALL BOOSTER PUMPS IN A WATER |
| | PRESSURE BOOSTER SYSTEM TO PREVENT THE CREATION OF A |
| | VACUUM OR NEGATIVE PRESSURE ON THE SUCTION SIDE OF THE |
| | PUMP WHEN A POSITIVE PRESSURE OF 10 PSI OR LESS OCCURS |
| | ON THE SUCTION SIDE OF THE PUMP. (PLEASE INDICATE A |
| | LOW-PRESSURE CUTOFF ON THE RESUBMITTED REVISION) |
| | |
| | ********IMPORTANT INFORMATION******** |
| | IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING, |
| | PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED, PLEASE INCLUDE A |
| | TRANSMITTAL LETTER INDICATING HOW EACH |
| | ITEM WAS ADDRESSED AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |