| 2005-09-21 00:00:00 | DENIED; 2ND TIME |
| | 1) FBC-2001 424.2.7.2 PUMPS AND |
| | EQUIPMENT SHALL BE MOUNTED ON A |
| | SUBSTANTIAL BASE IN A MANNER THAT WILL |
| | ELIMINATE STRAIN ON PIPING.SLAB SHALL |
| | BE A NOMINAL 4" THICK. (DETAIL) |
| | 2) FBC-2001 424.2.8.1 VALVES SHALL BE |
| | MADE OF MATERIALS THAT ARE APPROVED IN |
| | THE FLA BLDG CODE, PLUMBING.THEY WILL |
| | BE READILY ACCESSIBLE FOR MAINT. AND |
| | REMOVAL.SEC 424.2.8.2 FULL WAY VALVES |
| | SHALL BE INSTALLED TO INSURE PROPER |
| | FUNCTION OF THE FILTRATION AND PIPING |
| | SYSTEMS.SEC 424.2.8.3 WHERE CHECK |
| | VALVES ARE INSTALLED THEY SHALL BE OF |
| | THE SWING OR VERTICAL CHECK PATTERNS. |
| | SEC 424.2.8.4 COMBINATION VALVES SHALL |
| | REQUIRE APPROVAL OF THE ADMINISTRATIVE |
| | AUTHORITY PRIOR TO THEIR INSTALLATION. |
| | 3) FBC-2001 424.2.12.1 PRESSURE TESTS. |
| | PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. (ADD TO NOTES) |
| | 4)424.2.9 WATER SUPPLY, LOCAL ORD. |
| | #2853-95, BACKFLOW REQUIRED ON WATER |
| | SERVICE. (ADD TO NOTES) |
| | 5)FBC-2001 424.2.13.2 JOINTS AND |
| | CONNECTIONS, FBC PLUMBING SEC. 605.21, |
| | PURPLE PRIMER REQUIRED ON PVC PIPING. |
| | (ADD TO NOTES) |
| | 6)424.2.15 GAS PIPING SHALL COMPLY WITH |
| | FBC FUEL GAS. SEPARATE PLANS AND PERMIT |
| | REQUIRED. (ADD TO NOTES) |
| | PLANS WERE NEVER SENT BACK TO ENGINEER |
| | FOR REQUESTED CHANGES. ENGINEER'S SEAL |
| | DATE IS 6/12/05 FIRST REVIEW WAS DONE |
| | 7/26/05. COPY OF FIRST REVIEW INCLOSED. |
| | PLUMBING PLAN REVIEW BY; |
| | JOHN LEECH |
| | 805-6695 |
| | |
| | |