| Date |
Text |
| 2005-08-06 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 BUILDING |
| | FBC-2001 FUEL GAS |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | 1. SHT A-1 TOILET ROOM FOR OFFICE SHALL |
| | BE ACCESSIBLE PER SECTION 11-4.1.6(1)(B) |
| | SUBMIT A DETAIL SHOWING COMPLIANCE WITH |
| | SECTIONS 11-4.16, 11-4.19, & 11-4.22 AND |
| | ALL SUBSECTIONS. |
| | 2. PER TABLE 403.1 A DRINKING FOUNTAIN & |
| | A SERVICE SINK IS REQUIRED. |
| | 3. SHT A-1 ROOM FINISH SCHEDULE, THE |
| | WALLS OF ALL PUBLIC RESTROOM SHALL BE |
| | LINED WITH NONABSORBENT MATERIAL TO |
| | HEIGHT OF 4' ABOVE THE FLOOR. SECTION |
| | 1204.2. SUBMIT INFORMATION SHOWING |
| | COMPLIANCE. |
| | 4. ENGINEER SHALL SHOW ALL REQUIRED |
| | INFORMATION IN THE TITLE BLOCK OF EACH |
| | SHEET. 61G15-23.002(2) & FS 471.025. |
| | (PRINTED NAME) |
| | 5. SHT P-2 NO SANT. DRAINAGE PIPING |
| | SHOWN TO P-4 FIXTURE IN UNIT #3. SECTION |
| | 104.2.1. |
| | 6. SHTS P-2 & P-3 FLOOR DRAIN REQUIRED |
| | IN LAUNDRY ROOM. SECTION 412.4 |
| | 7. SHT P-3 WATER HAMMER ARRESTORS |
| | REQUIRED AT EACH WASH MACHINE PER |
| | SECTION 604.9. LOCATE NEXT TO FIXTURES. |
| | 8. SEPARATE GAS PERMIT REQUIRED. SUBMIT |
| | THE FOLLOWING INFORMATION: |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. - THIS INCLUDES THE |
| | SECTION FROM THE METER TO THE FIRST RISE |
| | IN THE SYSTEM. |
| | B. TYPE OF GAS, (LP OR NATURAL) |
| | C. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | D. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2001 FUEL |
| | GAS CODE SECTION 304. |
| | E. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | G. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | H. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |