| Date |
Text |
| 2005-08-27 00:00:00 | PLUMBING PLAN REVIEW EXAMINER, FBC 2001 |
| | PAUL SCHMITZ561-805-6692 |
| | |
| | [email protected] |
| | FBC 2001 |
| | DENIED 2ND TIME |
| | |
| | 1. PLANS SHALL BE ROUTED TO DBPR HOTEL |
| | AND RESTURANT DIVISION FOR REVIEW PRIOR |
| | TO RESUBMITTING TO CITY WPB FOR REVIEW. |
| | EACH SET OF PLANS SHALL BE STAMPED BY |
| | DBPR, AND THE 2 PAGE "WORK SHEETS" SHALL |
| | BE ATTACHED TO EACH SET OF PLANS. |
| | SECTION 101.4.7 |
| | 2. GREASE INTERCEPTOR SHALL BE SIZED BY |
| | THE ENVIRONMENTAL COMPLIANCE MANAGER. |
| | WASTE ORD #2938-96 OR #3434. PLEASE |
| | CONTACT LYNN MASSON (561) 822-2271, BY |
| | E-MAI [email protected], OR FAX (561) |
| | 822-2279.- SHT.P-1, EQUIP. SCHEDULE #41 |
| | GREASE INTERCEPTOR SHALL NOT BE LOCATED |
| | IN THE BUILDING IN THE FOOD PREP AREA. |
| | SEE ATTACHED WORK SHEET FROM. |
| | ENVIRONMENTAL COMPLIANCE MANAGER, |
| | REQUIRING 750 GAL GREASE INTERCEPTOR. |
| | 3. SHT P-1 GREASE RISER DIAGRAM, IS |
| | MISLABELED AS A SANITARY RISER. SECTION |
| | 104.2.1. ALSO THE DISH WASHER SHALL |
| | CONNECT TO THE SANITARY SYSTEM, NOT THE |
| | GREASE SYSTEM, PER UTILITY DEPT. |
| | THE DISH WASHER SHALL CONNECT DOWNSTREAM |
| | OF THE TOILET ROOM FIXTURES. SECTION |
| | 909.1. CAN WASH TO CONNECT TO GREASE |
| | SYSTEM. |
| | 4. SHT P-1 WATER RISER DIAGRAM, |
| | 104.2.1. -THE WATER HEATER SHALL |
| | COMPLY WITH 607.3.2 REQUIREMENT FOR |
| | THERMAL EXPANSION CONTROL. - ALSO THE |
| | P&T VALVE DISCHARGE LINE SHALL NOT HAVE |
| | ANY TRAPPED SECTIONS AND SHALL HAVE A |
| | VISIBLE AIR GAP LOCATED IN THE SAME ROOM |
| | AS THE HEATER. SECTION 504.7.1. |
| | 5. SHT P-1 THE WATER RISER DIAGRAM |
| | INDICATES THERE IS AN EMERGENCY PAN FOR |
| | THE WATER HEATER. SECTION 504.8.1 A |
| | DRAIN LINE IS REQUIRED FOR THE PAN PER |
| | SECTION 504.8.2. |
| | END OF COMMENTS |