| Plan Review Notes For Permit 05061207 |
| Permit Number |
05061207 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2005-07-09 00:00:00 | DENIED; | | | 1.COMPLY WITH FBC-2001 SEC. 424.2 | | | FBC-2001 SEC. 424.2.6.1 ENGINERRING | | | 2.DESIGN AND CONSTRUCTION AND WORKMAN | | | SHIP. ANSI?NSPI_5. (ADD TO NOTES)+ | | | 3.FBC-2001 424.2.8.1 VALVES SHALL BE | | | MADE OF MATERIALS THAT ARE APPROVED IN | | | THE FBC PLUMBING. THEY WILL BE READILY | | | ACCESSABLE FOR MAINT. AND REMOVAL. | | | SEC.424.2.8.2 AND 424.2.8.3. PLEASE ADD | | | TO NOTES. | | | 4.FBC 424.2.14.1 POOL HEATERS SHALL | | | BEAR THE LABLE OIF A RECOGNIZED TESTING | | | AGENCY. MANUFACTURES CUT SHT REQUIRED. | | | MUST SHOW A POSITIVE MEANS TO RETAIN | | | WATER IN HEATER. | | | 5.FBC SEC 424.2.14.4 CONNECTIONS, ALL | | | WATER HEATER EQUIPMENT SHALL BE | | | INSTALLED WITH FLANGES OR UNION | | | CONNECTIONS ADJACENT TO HEATER. ADD TO | | | NOTESGAS PIPING SHALL COMPLY WITH FBC | | | FUIL GAS CODE SEPARATE PLANS AND PERMIT | | | REQUIRED. ADD TO NOTES. | | | PLUMBING PLAN REVIEW BY; | | | JOHN LEECH | | | 805-6695 |
|