Plan Review Notes
Plan Review Notes For Permit 05061023
Permit Number 05061023
Review Stop E
Sequence Number 2
Notes
Date Text
2005-09-03 00:00:00*********** UNSAT **************
  
 PLEASE KNOW THAT PLANS ARE ONLY
 SUBMITTED FOR "PLAN REVIEW" AND HAVE NOT
 BEEN SUBMITTED FOR PERMIT AS OF YET.
 PLEASE ALSO KNOW, THE STATE OF FLORIDA
 IS SET TO CHANGE CODES ON OCT 1ST 2005.
 IF PLANS HAVE NOT BEEN SUBMITTED FOR
 PERMIT AND FEES PAID BEFORE THAT TIME,
 ALL DESIGNS WILL BE REQUIRED UNDER THE
 NEW FBC 2004 FBCADOPTED CODES.
  
 1)NOTE: PLEASE SHOW THE ATTACHMENT FOR
 NEW TRANSFORMER SHOWN.
 PLEASE SEE 250.30,250.66.TRANSFORMER
 IS NOT SHOWNATTACHED TO GROUNDING
 DETAIL SHOWN ON PLANS?
  
 2)NOTE:PLEASE SEE PANEL SCHEDULE FOR HA
 PANEL IS SHOWING "SPARE" FOR WHAT APPEAR
 TO BE RTU'S/ A/C EQUIPMENT?
 PLEASE ALSO SEE LOAD CALCULATIONS
 INDICATE "0" FOR LARGEST MOTOR LOAD(S).
 MIN 125%, SHALL BE FIGURED.
 215.3
  
 3)NOTE: PLEASE SEE NEW 600A MAIN
 INDICATES A NEW GROUNDING ELECTRODE
 CONDUCTOR WITH ATTACHMENT TO NEW
 GROUNDING ELECTRODE???
 PLEASE CLARIFY.
 PLEASE SEE PREVIOUS NOTES WHICH
 REQUESTED INFORMATION WHETHER
 "LANDLORDS" WIREWAY CONTAINED A "MAIN"
 AHEAD OF WIREWAY?
 PLEASE SEE IF NOT THEN AN "EQIPMENT
 GROUNDING CONDUCTOR" WOULD ONLY BE
 INSTALLED AFTER THE FIRST MEANS OF
 DISCONNECT.(NEW 600A MAIN) PLEASE SEE
 RISER SHOWS AN EQUIPMENT GROUNDING
 CONDUCTOR FROM WIREWAY TO NEW 600A MAIN.
 THIS IS OK IF THERE IS A MAIN ON THE
 LINE-SIDE OF THE WIREWAY SHOWN.
 PLEASE SEE 250.24, AND 250.6.
 PLEASE BE SURE NEUTRAL "IS NOT"
 PARALLED.
  
 4)NOTE: PLEASE SEE LOAD SHOWN ON PANEL
 "A" IS SHOWN AT 198A'S AFTER DEMANDS
 TAKEN. PLEASE SEE 75KVA TRANSFORMER
 @208V ON SECONDARY SIDE IS ONLY RATED AT
 208A'S MAX.
 PLEASE SEE 90.7, WHICH STATES ANY DESIGN
 IN AN ELECTRICAL SYSTEM SHOULD PROVIDE
 ROOM FOR "FUTURE PLANNING" OF POSSIBLE
 EXPANSION OF ELECTRICAL.
  
 5)NOTE: PLEASE CORRELATE ROOF TOP
 EQUIPMENT EF-1 AND MUA-1 WITH PANEL
 SCHEDULES, EF-1 COULD NOT BE LOCATED,
 ONLY EF-2? (MISPRINT)?
 PLEASE CORRELATE WITH MECHANICAL PLANS.
 MUA-1 COULD NOT BE LOCATED ON A PANEL
 SCHEDULE.
  
 PLEASE REMOVE ANY OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING>
 PLEASE SUBMIT ONE COPY OF OLD/VOIDED
 SHEETS FOR REFERENCE.
  
 PLEASE SEE ANY POSSIBEL COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW AND IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  