| Date |
Text |
| 2005-07-01 00:00:00 | ********** UNSAT *************** |
| | |
| | 1)NOTE: PLEASE SEE LETTER FROM |
| | CONTRACTOR CHANGING SCOPE OF WORK SHALL |
| | BE PROPERLY NOTORIZED PER FS 117 BEFORE |
| | IT CAN BECOME LEGAL AND LEGAL FOR PUBLIC |
| | RECORD. LETTER AS SUBMITTED IS NOT LEGAL |
| | AND CAN NOT BE ACCEPTED. |
| | PLEASE SEE FS 117.05 |
| | |
| | 2)NOTE: PLEASE SUBMIT WINDING LOAD FOR |
| | ALL SITE -LIGHTING POLES TO MEET FBC |
| | 140MPH. PLEASE SEE BLD REVIEW COMMENTS. |
| | |
| | 3)NOTE: PLEASE CORRELATE RISER DIAGRAM |
| | WITH PANEL SCHEDULE SUBMITTED. PLEASE |
| | SEE RISER SHOWS 100A MCB AND PANEL |
| | SCHEDULE INDICATES 125A MCB. PLEASE SEE |
| | 240.4 AND 310.16 FOR ANY POSSIBLE AWG |
| | CHANGES AND CONDUIT SIZE CHANGES. |
| | |
| | 4)NOTE: PLEASE SEE 250.122 FOR MIN |
| | EQUIPMENT GROUNDING CONDUCTOR SIZING. |
| | PLEASE SEE GATE MOTOR CIRCUIT, 30A W. |
| | #12 AWG EQUIPMENT GROUNDING. |
| | |
| | 5)NOTE: PLEASE SEE FAC 61G15-23.002 FOR |
| | INFROAMTION REQUIRED ON TITLE BLOCKS. |
| | PLEASE SEE CA # APPEARS TO BE SHOWN, |
| | HOWEVER IT IS NOT VISABLE. |
| | PLEASE CORRECT. |
| | |
| | PLEASE REMOVE ALL OLD/VOIDED SHEETS AND |
| | ONLY INSERT NEW REVISED SHEETS INTO |
| | COMPLETE SETS FOR REVIEW AND STAMPING. |
| | |
| | PLEASE SEE ANY COMMENTS FROM OTHER |
| | REVIEWER(S) WHICH MAY AFFECT ELECTRICAL |
| | PLANS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |