| 2005-06-27 00:00:00 | FAILED: |
| | |
| | 1. A CLEAN-OUT WILL NEED TO BE INSTALLED |
| | IN THE SANITARY SEWER LATERAL, ON THE |
| | PROPERTY, AT BACK OF THE SIDEWALK, IF |
| | NOT ALRADY INSTALLED. |
| | 2. IF KITCHEN FACILITY IS BUILT THEN |
| | GREASE/WATER SEPARATOR WILL NEED TO BE |
| | INSTALLED TO MEET THE CITY' WASTEWATER |
| | DISCHARGE ORDINANCE, PLEASE CONTACT MR. |
| | RODNEY COMPO AT 822-2272 FOR SPECCIFIC |
| | AND REQUIREMENTS. |
| | 2. SIDEWALK ALONG THE PROPERTY MUST BE |
| | RESOTRED IF BROKEN AND/OR INSTALLED IF |
| | REQUIRED. |
| | 3.PLUMBING PLANS REFER TO CIVIL PLANS |
| | FOR CONTINUATION OF SERVICES, NO CIVIL |
| | PLANS ARE PROVIDED. NOTE THAT IF NEW |
| | CONNECTIONS TO THE CITY SERVICES THEN |
| | CIVIL PLANS SHOWING LOCATION FOR METERS |
| | AND BACKFLOWSAND AND THEIR SIZES MUST BE |
| | SUBMITTED TO THE PUBLIC UTILITIES AND |
| | ENGINEERING ATT; MANNY GONZALEZ AT |
| | 494-1085. |
| | 4. PER SANITATION DEPARTMENT ( GREGORY |
| | RODGERS 822-2075) ONLY A 2 C.Y. WITH |
| | CANSTERS FOR THE PROPOSED DUMPSTER CAN |
| | BE USED. |
| | 5. PLEASE SHOW HOW THE PROPOSED PARKING |
| | WILL DRAINED. SHEET A-1 |
| | 6. NOTE THAT APPROACH TO THE SITE MUST |
| | BE CONSTRUCTED PER CITY OF WPB' STANDARD |
| | AND REQUIREMENTS. SEE ATTACHED |
| | |
| | IF ANY QUESTION PLEASE CONTACT 805-6723 |
| | MOHAMMAD R. AMINI |