Date Text
2005-08-22 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 A. FROM PREVIOUS REVIEW
 3. SHT A-3 WATER HAMMER ARRESTORS SHALL
 BE LOCATED IN AN "EFFECTIVE RANGE" NOT
 IN THE CEILING AS SHOWN. PDI-WH 201 AND
 MANUF. INSTALLATION INSTRUCTIONS.
 5. THE FOLLOWING INFORMATION IS REQUIRED
 FOR PERMIT APPLICATION:
 D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2. - NO
 MANUF. SHEETS FOR WATER HEATER
 SUBMITTED. - MANUF. SHEET FOR BOILER
 INDICATE 1,046,000 BTU, BUT ISOMETRIC
 INDICATES 840,000 BTU. PLEASE CLARIFY.
 **************NEW COMMENTS**************
 1B. SHT A-3 WATER RISER DIAGRAM SHOWS A
 3/4" COLD WATER LINE TO THE AIR
 COMPRESSOR, BUT NO CONNECTION TO AIR
 COMPRESSOR IS SHOWN ON THE MANUF.
 SPECIFICATION SHEET. PLEASE CLARIFY WHAT
 THE WATER LINE TO THE COMPRESSOR IS FOR.
 IF CONNECTED TO THE COMPRESSOR, BACKFLOW
 PROTECTION IS REQUIRED. SECTION 104.2.1.
 2B. SHT A-3 PIPE SIZING ON THE GAS RISER
 DIAGRAM IS NOT CORRECT PER TABLE 402(2).
 SEE RED LINE CORRECTIONS ON ONE SET OF
 PLANS.
 3B. SEE COMMENT #1 OF THE ELECTRICAL
 PLAN REVIEW CONCERNING THE TITLE BLOCK
 OF THE ARCHITECT.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved