2005-05-09 00:00:00********* UNSAT *********
  
 HAWTHORNE SUITES 6- STORY HOTEL
  
 1)NOTE: PLEASE SEE MISSING LICENSE
 INFORMATIONREQUIRED ON TITLE BLOCKS
 PER FAC 61G1-16.004 FOR ARCHITECT'S AND
 ARCHITECTUAL FIRMS. PLEASE ALSO SEE FAC
 61G15-23.002 FOR ENGINEERS AND
 ENGINEERING FIRMS.
 PLEASE SEE FS 481.219 AND FS 471.023.
  
 2)NOTE: PLEASE SEE LS 101 5-9 FOR
 CIRCUITING OF EM LIGHTING. PLEASE SEE
 STAIRS AND HALL WILL REQUIRE TWO CIRUITS
 FROM EM PANEL OR BATTERY BACK-UP
 FIXTURES WILL BE REQUIRED.
  
 3)NOTE: PLEASE VERIFY EM LTS REQUIRED IN
 ELEVATOR EQUIPMENT RMS AND ELECTRICAL
 RMS. LS 101 5-9
  
 4)NOTE: PLEASE SEE NOTE #28 ON
 ELECTRICAL EQUIPMENT SCHEDULE. PLEASE
 SEE 695.4B1, THE OVERCURRENT PROTECTIVE
 DEVICE(S) SHALL BE SELECTED OR SET TO
 CARRY INDEFINITELY THE SUM OF THE
 LOCKED-ROTOR CURRENT OF THE FIRE PUMP
 MOTOR(S) AND THE PRESSURE MAINTENANCE
 PUMP MOTOR(S) AND THE FULL-LOAD CURRENT
 OF THE ASSOCIATED FIRE PUMP ACCESSORY
 EQUIPMENT WHEN CONNECTED TO THIS POWER
 SUPPLY. PLEASE SEE 300A IS SHOWN FOR
 LOCKED ROTOR EXCEEDING.
 PLEASE ALSO SEE LOCATION OF FIRE PUMP
 DISCONNECT/ SERVICE MEANS SHALL BE
 REMOTE FROM MAIN ELECTRICAL SERVICE.
 PLEASE SEE NEC 2002 695.3 COMMENTARY
 THE POWER SOURCE FOR AN ELECTRIC
 MOTOR-DRIVEN FIRE PUMP MUST BE RELIABLE
 AND HAVE ADEQUATE CAPACITY TO CARRY THE
 LOCKED-ROTOR CURRENTS OF THE FIRE PUMP
 MOTOR AND ACCESSORY EQUIPMENT. THESE TWO
 MAIN REQUIREMENTS ENSURE THAT THE FIRE
 PUMP WILL OPERATE IN THE EVENT OF A FIRE
 WITHOUT BEING ACCIDENTALLY DISCONNECTED
 AND THAT THE FIRE PUMP WILL CONTINUE TO
 OPERATE UNTIL THE FIRE IS EXTINGUISHED,
 THE FIRE PUMP IS PURPOSELY SHUT DOWN, OR
 THE PUMP ITSELF IS DESTROYED.
 PLEASE SEE FOLLOWING COMMENTS FOR
 REQUESTED INFORAMTION INCLUDING FIRE
 PUMP INFORMATION.
 PLEASE SEE FIRE PUMP IS SHOWN HAVING TWO
 FEEDS FROM THE MAIN SWITCH BOARD??
  
 5)NOTE: PLEASE SEE ELECTRICAL PANELS /
 OCP NOT PERMITTED IN STORAGE AREAS AND
 AREAS WITH EASILY IGNITIBLE MATERIALS.
 PLEASE SEE 110.26,408.7 240.24D
 PLEASE SEE THESE AREAS SHALL BE
 DEDICATED TO ELECTRICAL EQUIPMENT.
  
 6)NOTE:PLEASE SEE DISCONNECTING MEANS
 REQUIRED FOR FEEDS FROM GENERATOR TO BE
 LOCATED AT MAIN BLDG/ ELECTRICAL RMS.
 PLEASE SEE 225.31-36.
  
 7)NOTE: PLEASE SEE GENERATOR APPEARS TO
 BE A SEPARATELY DERIVED SYSTEM. PLEASE
 SEE NOTES TO ELECTRICAL RISER DIAGRAM
 APPEARS TO SHOW TRANSFER SWITCH(S) AS
 4-POLE??
 PLEASE SEE 250.30 FOR SYSTEM SEPARATELY
 DERIVED.
 PLEASE SEE ALSO SEE 250.24,250.6 FOR
 GROUNDING/EQUIPMENT GROUNDING.
  
 8)NOTE: PLEASE SEE NOTES TO RISER
 DIAGRAM #15 AND #16 ARE LEFT BLANK?
 HOWEVER, PLEASE SEE THESE #'S ARE USED
 ON RISER.
  
 9)NOTE: PLEASE SEE FIRE PUMP DISC IS
 SHOWN BEING CONNECTED TO MAIN SERVICE
 EQUIPMENT. PLEASE SEE 695.4 THIS IS NOT
 PERMITTED. FIRE PUMP DISCONNECTING MEANS
 SHALL BE DIRECTLY CONNECTED TO UTILITY
 SERVICE. FPL.
  
 10)NOTE: PLEASE VERIFY OF MSB HAS A MCB
 WITH A MANUAL MEANS OF DISCONNECT
 LOCATED ON THE OUTSIDE OF EQUIPMENT.
 PLEASE SEE 230.76,230.79
  
 11)NOTE: PLEASE CORRELATE OCP SHOWN ON
 MSWBD WITH RATINGS OF PANELS. PLEASE SEE
 SOME PANELS ARE SHOWN WITH 400A OCP AND
 PANELS ARE RATED AT 225A'S.
 PLEASE SEE 100A OCP FEEDING PANELS RATED
 AT 400A'S. PLEASE SEE THIS IS OK,
 HOWEVER ITEMS ON PANEL APPEAR TO HAVE
 LOAD EXCEEDING THE 100'S.
 THIS CAN NOT BE VERIFIED AT THIS TIME
 DUE TO LOAD CALCS NOT BEING SHOWN ON
 EACH PANEL.
  
 12)NOTE: PLEASE SEE 250.104 FOR OTHER
 METAL PIPES REQUIRED. (FIRE PUMP) ETC.
  
 13)NOTE: PLEASE PROVIDE LOAD ON EACH
 PANEL SCHEDULE PER NEC 220,215.5
  
 14)NOTE: PLEASE SHOW ALL CONTINUOUS
 LOADS AND LARGEST MOTORS LOADS @ 125%.
 PLEASE SEE LIGHTING ETC. 215.3,230.42
 ETC.
  
 15)NOTE: PLEASE SEE NOE FEEDERS
 SHOWN/NOTED FOR PD1. 215.5,310.16,240.4
  
 16)NOTE: PLEASE SEE NO PANEL SCHEDULE
 WAS PROVIDED FOR PANEL "PP".
 215.5
  
 17)NOTE: PLEASE SEE PANEL H3P IS ALSO
 SHOWN AS HP3?
 PLEASE CORRELATE.
  
 18)NOTE: PLEASE SEE FIRE PUMP IS NOT
 SHOWN BEING FED FROM THE GENERATOR?
 PLEASE SEE TWO MEANS OF POWER SHALL BE
 SUPPLIED FOR BLDG'S EXCEEDING
 75'/HIGH-RISE. IF BLDG DOES NOT EXCEED
 75', A DIRECT CONNECTION TO FPL MAY BE
 ACCEAPTED AS A RELIABLE SOURCE.
  
 19)NOTE: PLEASE SHOW ALL CIRCUITING ON
 PLANS AND CORRELATE WITH PANEL
 SCHEDULES. PLEASE ALSO SEE TYPICAL
 SUITES SHALL REQUIRE THIS ALSO.
  
 20)NOTE: PLEASE SEE NOTE #28 ON
 EQUIPMENT SCHEDULE MENTIONS THAT
 PLUMBING CONTRACTOR IS TO SUPPLY AND
 INSTALL FIRE PUMP, FIRE PUMP
 CONTROLLER/DISCONNECT ETC.
 PLEASE SEE STATE OF FLORIDA ECLB SCOPE
 OF WORK PERMITTED UNDER PLUMB
 CONTRACTORSA LICENSE DOES NOT PERMIT PC,
 TO INSTALL ELECTRICAL EQUIPMENT. PELASE
 ADJUST NOTES.
  
 21)NOTE: PLEASE SEE NUMEROUS PANEL
 SCHEDULES WHICH INDICATE 30A OCP ON #12
 AWG?
 PLEASE SEE 310.16 AND 240.4 FOR MIN
 SIZING REQUIRED.
  
 22)NOTE: PLEASE SEE WIND LOADING IS
 REQUIRED FOR SITE LIGHTING POLES AND
 FIXTURES. THIS IS REQUIRED AT THIS TIME
 IF SHOWN ON PLANS.
 WIND LOADING IS @ 140MPH PER FBC.
  
 23)NOTE: : PLEASE SEE EEP IS BEING FED
 WITH A 100A OCP FROM GEN? HOWEVER THIS
 IS BEING FED WITH 400A OCP FROM MSWBD?
  
 24)NOTE: PLEASE SEE NOTES TO RISER
 DIAGRAM MENTIONS 9-4" CONDUITS TO MAINS,
 HOWEVER CONDUCTORS FOR THESE CONDUITS
 COULD NOT BE LOCATED?
 PLEASE SEE 240.4,310.16
 215.5
  
 25)NOTE: PLEASE PROVIDE ALL MANUFACTURE
 SPEC/CUT SHEETS FOR FIRE PUMP, FIRE PUMP
 CONTROLLER, ATS'S SWITCHES, GENERATOR
 ETC. PLEASE ALSO PROVIDE INFORMATION FOR
 GEN. PRIME MOVER. IF A SUB-BASE FUEL
 TANK, PLEASE PROVIDE MANUFACT SHEETS.
  
 26)NOTE: PLEASE SEE NEC 2002 210.8B3 FOR
 GFI PROTECTION REQUIRED IN KITCHEN/
 SERVING AREAS. PLEASE ALSO SEE EMPLOYEE
 KITCHEN.
  
 27)NOTE: PLEASE SEE POSSIBLE COMMENTS
 FROM OTHER REVIEWER(S) WHICH MAY HAVE AN
 AFFECT ON ELECTRICAL PLANS.
  
 28)NOTE: PLEASE SEE DUE TO MISSING
 INFORMATION A COMPLETE REVIEW FOR CODE
 COMPLIANCE CAN NOT BE DONE AT THIS TIME.
 PLEASE BE SURE TO PROVIDE ALL
 INFORMATION AS REQUESTED ABOVE.
  
 ***PLEASE BE SURE TO REMOVE OLD/VOIDED
 SHEETS FROM SETS AND ONLY INSERT NEW
 REVISED SHEETS INTO THREE COMPLETE SETS
 FOR REVIEW AND STAMPING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  
  
2005-05-06 00:00:00NOTES TO FOLLOW UPON COMPLETION OF
 REVIEW.
 PLANS WILL BE IN THE FAILED STATUS ONCE
 THESE NOTES ARE COMPLETE.
 5/6/05