| Date |
Text |
| 2005-09-01 00:00:00 | SUBMITTAL BUILDING REVIEW CHECKLIST: |
| | 1- SEPARATE PERMIT FOR SHUTTERS HAS NOT |
| | BEEN APPLIED FOR YET. |
| | |
| | 2- ENERGY CALCULATIONS WERE REVISED. NOW |
| | CEILING FAN CREDIT WAS TAKEN. THEREFORE, |
| | NEED TO REVISE ELECTRICAL PLAN SHOWING |
| | SIZE OF CEILING FANS, INCLUDING FANS IN |
| | THE GREAT ROOM AS REQUIRED BY TABLE 6-6 |
| | OF CHAPTER 13 FBC 2001. |
| | |
| | 3- ROOF FRAMING PLAN NEEDS TO BE REVISED |
| | AT ENTRY PORCH AREA TO MATCH FOUNDATION |
| | PLAN AND FLOOR PLAN. NOTICE THAT |
| | CONCRETE BEAM DOESN'T EXTEND ALL THE WAY |
| | INSIDE TO THE FOYER AREA. CONCRETE BEAM |
| | IS ONLY AT ENTRY PORCH AREA. REVISE ROOF |
| | FRAMING PLAN AS REQUIRED AND SPECIFIY |
| | CORRESPONDING CONNECTORS. SECTION |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | |
| | 4- TRUSS ANCHOR SCHEDULE: REVISE NUMBER |
| | OF NAILS SPECIFIED FOR CONNECTOR HUS26. |
| | SEE 2005 CATALOGUE. |
| | |
| | 5- ONE HOUR FIRE RATED DOOR AT ATRIUM |
| | PRODUCT APPROVAL SUBMITTED IS FOR |
| | OUTSWING DOOR. PLANS SHOW INSWING DOOR. |
| | REVISE AS REQUIRED. |
| | |
| | 6- SPECIFY WINDOW MULLION AND ANCHORS |
| | FOR FIXED WINDOWS AT GREAT ROOM. SEC. |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | |
| | 7- PROVIDE PRODUCT APPROVAL FOR WINDOW |
| | MULLION SPECIFIED FOR FIXED WINDOWS AT |
| | GREAT ROOM. |
| | |
| | 8- ALL REVISED DRAWINGS WILL BE SUBJECT |
| | TO THE REVISION FEES. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ AT (561)805-6712. |