2005-08-23 00:00:00BUILDING REVIEW 2ND CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 2- A) ROOF LOADING CHART IN PAGE A7:
 REVISE THE TOTAL LOAD. IT DOESN'T ADD
 UP.
  
 B) ROOF LOADING INFORMATION ON SHEET A7
 DOESN'T MATCH INFORMATION ON SHEET A1
 WIND INFORMATION. REVISE AS REQUIRED.
  
 C) WIND LOAD INFORMATION ON SHEET A1:
 MIN. LOAD SHALL BE 10PSF AS REQUIRED BY
 SEC. 1606.1.2 FBC 2001.
 *NOTE COORDINATE ALL 3 ITEMS ABOVE TO
 HAVE CONSISTENT INFORMATION.
  
 3- ROOF SHEATHING SPECS ON SHEET A7:
 ZONE 3 INCLUDES ALL CORNERS NOT JUST AT
 GABLE ENDS. SEE FIGURE 1606.2(C)FBC
 2001. REVISE SPECS AS REQUIRED.
  
 4- REVISE NOTE ON SHEET A5 REGARDING
 INSPECTION HOLES. 3/4" HOLES ARE TOO
 SMALL. SEE ACI 530 AND SPECIFY CORRECT
 SIZE FOR INSPECTION & CLEANOUT OPENINGS.
  
 5- REVISE SPECIFICATIONS FOR CEILING
 INSTALLATION AT ENTRY AND REAR PORCHES
 AND 2ND FLOOR BALCONIES. NAILS NEED TO
 BE LONG ENOUGH TO HAVE 1 3/4" MIN.
 PENETRATION TO THE HORIZONTAL MEMBERS.
 ALSO, REVISE NAILS SPACING. SEE ASTM
 C-926 AND ASTM C-1063. PROVIDE SPECIFIC
 SPECS FOR SIZE AND SPACING.
  
 6- SOIL TEST REPORT RECOMMENDS 18" MIN.
 FOOTING WIDTH AND 16" MIN. FOOTING DEPTH
 BELOW GRADE TO ACHIEVE THE 2500PSF
 BEARING CAPACITY OF THE SOIL. REVISE
 EITHER THE SOIL TEST REPORT OR
 FOUNDATIONS TO MATCH.
  
 7- CLARIFY WHY TIES ARE NOT REQUIRED FOR
 BEAM TB-5. HOW ARE THE 3 #6 REBARS TIED
 TOGETHER?. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 8- A) PROVIDE COMPLETE DETAILS FOR
 WINDOWS ATTACHMENT TO STEEL COLUMN AT
 MASTER BATHROOM. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 B) TAPCONS ARE NOT DESIGNED FOR USE IN
 METAL. REVISE AS REQUIRED.
  
 9- SPECIFY SMOKE DETECTOR ON FIRST FLOOR
 IN CLOSE PROXIMITY TO STAIRS. SEC.
 905.2.2 FBC 2001. ELEC. PLAN SHOW
 DETECTOR IN THE CEILING. THIS IS A TWO
 STORY FOYER. THEREFORE, THE DETECTOR IS
 ON THE 2ND FLOOR, NOT THE 1ST. REVISE.
  
 10- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL (DADE COUNTY NOA ALONE IS NOT
 AUTOMATICALLY AN STATE WIDE PRODUCT
 APPROVAL) FOR:
 A) ENTRY DOORS.
 B) FRENCH DOORS WITH AND WITHOUT
 SIDELITES AS SHOWN ON PLANS.
 C) GARAGE SIDE DOOR.
 D) SINGLE HUNG WINDOWS.
 E) WINDOW MULLIONS.
 F) ROOF TILE.
 G) TRUSS CONNECTORS SPECIFIED ON PLANS.
  
 11- STORM SHUTTERS: NEED TO PROVIDE AN
 EMERGENCY EGRESS. NOT ALL OPENINGS CAN
 BE CLOSED WITH SHUTTERS. SEE SEC.
 1005.4.5 FBC 2001.
  
 12- SHEET A1: UPDATE GENERAL NOTE
 REGARDING ACI 318. SEE CHAPTER 35 FBC
 2001 FOR PROPER EDITION.
  
 13- SPECIFY FIREBLOCKING MATERIAL IN
 STAIR SECTION. SEC. 2305.1.4 FBC 2001.
  
 14- REVISE WINDOW BUCK DETAIL. SEE SEC.
 1707.4.4.2 FBC 2001. NEED FULL SUPPORT
 FOR WINDOW. ALSO, THERE ARE 2 GARAGE
 DOOR BUCK DETAILS ON SAME PAGE.
  
 15- CLARIFY WHY FLOOR TRUSSES ARE NOT
 FASTENED. ARE THEY PART OF THE FLOOR
 DIAPHRAGM OR NOT?. HOW ARE THEY ATTACHED
 TO THE WOOD BEARING WALLS?. HOW ARE THEY
 SUPPORTED TO RESIST LATERAL LOADS? SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 16- OPENING DESIGN PRESSURES WERE
 CHANGED FROM PREVIOUS SUBMITTAL:
 A) PROVIDE ENGINEERED CALCS TO SHOW WHY
 THE DESIGN PRESSURES ARE THE SAME FOR
 LARGE AND SMALL OPENINGS. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 B) RIGHT ELEVATION: CLARIFY WHY DESIGN
 PRESSURES ARE HIGHER FOR 2ND FLOOR
 INTERIOR WINDOW THAN END WINDOW AT
 MASTER BATHROOM.
  
 17- ENERGY CALCULATIONS: A) OWNER/AGENT
 TO SIGN AND DATE BOTTOM OF FORM.
 B) COMPLETE TOP OF FORM: ADDRESS, OWNER
  
 18- SHEET A4: AREA CALCULATIONS WERE
 REVISED. NOW, 1ST AND 2ND FLOOR AREA
 DON'T ADD UP. REVISE AS REQUIRED.
  
 19- SHEET A5: WHERE IS DETAIL 3/A5 KEYED
 ON FOUNDATION PLAN.
  
 20- SHEET A6: 12"X8" DETAIL COLUMN CALLS
 FOR 3 #5 REINFORCEMENT, WHILE PICTURE
 SHOWS 2. REVISE AS REQUIRED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.