Plan Review Notes
Plan Review Notes For Permit 05031185
Permit Number 05031185
Review Stop E
Sequence Number 4
Notes
Date Text
2007-09-17 16:51:24**** NOTE ADDED***
  
 1) NOTE: PLEASE SEE FBC 2001, CHAPTER 13,
 415.1.ABCD.1.1.4 FOR REQUIRED MISSING MASTER LIGHTING
 CONTROL SWITCH.
 ** PLEASE SEE LIGHTING PERFORMANCE CALCULATIONS IN
 13-415.2
 PLEASE SEE ALL REQUIREMENTS FOR THE 2001 FBC CHAPTER 13
 WHICH ARE REQUIRED TO BE MET.
  
 THIS COMMENT WAS NOT MADE ON PREVIOUS REVIEW HOWEVER IT
 IS REQUIRED OF THE DESIGN TEAM TO MEET THE MINIMUM
 REQUIREMENTS OF THE FBC.
2007-08-24 18:00:112007-08-24 18:00:11
  
 *** DENIED2ND REVIEW OF REVISIONS ***
  
 *** PLEASE SEE SOME COMMENTS FROM PREVIOUS REVIEW ARE
 STILL IN NEED OF ADDRESSING ALONG WITH NEW COMMENTS
 BASED ON SOME INFORMATION ON REVISED PLANS.
  
 ** REVIEW FOR REVISION OF CLARKES HOTEL FROM 5-STORIES
 TO 8 STORIES.
  
 ** PLEASE KNOW THAT AT THIS TIME THERE IS NOT ENOUGH
 INFORMATION SUBMITTED FOR A COMPLETE REVIEW FOR CODE
 COMPLIANCE AS THE BUILDING HAS NOW BEEN CLASSIFIED AS A
 HIGH-RISE.
 PLEASE SEE SOME ITEMS WERE NOT SUBMITTED AS PREVIOUSLY
 REQUESTED FOR REVIEW.
  
  
 1) NOTE:THIS IS THE SAME NOTE AS SOME SHEETS STILL
 ONLY INDICATE LESS REVISIONS THAN THE PROJECT HAS
 PLEASE SEE THAT ALL REVISIONS ON PLANS SHALL BE DATED,
 CLOUDED/TRIANGLE NOTATIONS ACCORDINGLY. PLEASE SEE
 DATES AND REVISION NUMBERS SHOW A REV #1, HOWEVER THIS
 HAS BEEN REVISED AT LEAST THREE OR FOUR TIMES. HOW IS
 THIS FIRST REVISION??
  
 2) NOTE: PLEASE CLARIFY HOW SHEET E-3 BE TYPICAL FOR
 ALL FLOORS WHEN THE FLOOR PLAN LAYOUT FOR THE
 ELECTRICAL ROOMS ARE DIFFERENT. THE LARGER ROOMS WOULD
 INDEED AFFECT THE FLOOR PLANS FOR LAYOUTS OF WALLS,
 SPACES ETC.
 PLEASE PROVIDE EACH.
 FBC 104.1.2
  
 3) NOTE: AS REQUESTED ON THE PREVIOUS REVIEW:PLEASE
 SUBMIT ALL THE MANUFACTURE SPECS/CUT SHEETS FOR ALL OF
 THE FOLLOWING. PLEASE SUBMIT FOR; FIRE PUMP, FIRE PUMP
 CONTROLLER, GENERATOR, FUEL TANK. (SEENOTES BELOW),
 ATS EQUIPMENT (SEENOTES BELOW). 110.3, 90.7 PLEASE
 KNOW AT THIS TIME THERE ARE SEVERAL ITEMS WHICH REMAIN
 UNANSWERED FOR REQUIRED CODE ITEMS AND COORDINATION OF
 PLANS WITH OUT THESE ITEMS.
  
 4) NOTE: AS REQUESTED ON PREVIOUS REVIEW:
 PLEASE SUBMIT COMPLETE PHOTO-METRICS FOR ALL EGRESS
 PATHS. (ALL CORRIDORS AND STAIR TOWERS) PLEASE SEE
 LS-1017.8.1.3, 7.9.2.2 10FT CANDLE MIN FOR STAIRS UNDER
 NORMAL AND 1FT CANDLE UNDER EMERGENCY.
 PLEASE SEE THERE ARE SEVERAL STAIR AREAS WHERE NO
 PHOTO-METRIC LEVELS WERE SUBMITTED FOR REVIEW. PLEASE
 ALSO SEE THAT THE COMMENT REQUESTED THE LEVELS UNDER
 NORMAL AND UNDER EMERGENCY.
 PLEASE SEE SOME STAIR AREAS WHICH SHOW LEVELS ARE UNDER
 THE MINIMUM AS REQUIRED PER THE LIFE SAFETY CODE UNDER
 NORMAL.
 PLEASE SUBMIT THESE FOR ALL EGRESS PATHS TO THE PUBLIC
 RIGHT OF WAY AWAY FROM BUILDING.
 ** EXAMPLE: PLEASE SEE STAIRS FROM MEZZANINE LEVEL TO
 REAR OF BUILDING ON E-2, PLEASE SEE ROOF PLANS FROM
 POOL AREA WHICH CONTAINS STAIRS HOWEVER NO LEVELS WERE
 SHOWN.
 ** IMPORTANT: PLEASE SEE NOW THE PHOTO-METRICS HAVE
 BEEN SUBMITTED AND FIGURED SHOWING DIFFERENT FIXTURES
 THAN THAT ON PLANS FOR THE SAME LOCATIONS.
 FE, IS HE ETC.
 FAC 61G15-33.004
  
 5) NOTE:THIS NOTE REMAINS AS IT IS NOT KNOWN WHETHER
 OR NOT PLANS AND PERMITTING FOR GARAGE WILL BE REQUIRED
 AT THIS TIME.
 PLEASE SEE ZONING COMMENTS, PLEASE SEE IF A GARAGE IS
 NOW REQUIRED, THIS WILL COMPLETELY CHANGE ELECTRICAL
 SERVICE AND ELECTRICAL SHEETS SUBMITTED.
  
 6) NOTE: PLEASE VERIFY THE SMOKE DEVICES IN UNITS ARE
 IN FACT SMOKE DETECTORS AS SHOWN OR SMOKE ALARMS PER
 NFPA-72.
 PLEASE SEE AS SHOWN WITH THE 120V POWER AND IF THERE
 ARE DETECTION AND SOUNDING DEVICES THESE WOULD IN FACT
 BE *SD* FOR SMOKE ALARMS.
 PLEASE KNOW THAT A STATEMENT WAS ISSUED FROM NFPA THAT
 THESE DEVICES SHALL BE CLEARLY IDENTIFIED FOR USE AND
 THE GENERAL ACCEPTANCE OF USING SD FOR ACTUAL SMOKE
 ALARMS SHOULD BE ADDRESSED.
  
 7) NOTE: AS REQUESTED ON PREVIOUS REVIEW: PLEASE SEE
 ALL FIXTURE SCHEDULE AND TYPE INFORMATION WHICH WAS ON
 PREVIOUS PLANS HAS BEEN REMOVED FOR EM FIXTURES? PLEASE
 SEE ALL OF THE FOLLOWING IN ORDER TO REVIEW FOR CODE
 COMPLIANCE SHALL BE PLACED BACK ON PLANS.
 LS 101.
 THE RESPONSE MENTIONS THIS WAS NOT DONE, HOWEVER PLEASE
 SEE THE ORIGINAL PERMITTED SETS OF PLANS CLEARLY
 INDICATE THIS SCHEDULE/LEGEND ON SHEET E1.
 PLEASE SEE THE FIXTURE LEGEND ON SHEET E-6 DOES NOT
 CLEARLY INDICATE THE BATTERY BACK UP FOR CERTAIN
 FIXTURES WHICH WAS INDICATE ON LEGEND ON PREVIOUS
 PLANS.
 PLEASE SEE COMMENT #4 ABOVE WITH RESPECT TO THE
 DIFFERENCES ON PLANS IF LIGHTING FIXTURES.
  
 8) NOTE:AS REQUESTED ON PREVIOUS REVIEW:
 PLEASE SEE THAT NOW THAT A GENERATOR IS INSTALLED AND
 REQUIRED AND USE IS TO A HIGH-RISE, PLEASE SEE NFPA-20
 6-6.2 AS THE MINIMUM FUEL REQUIRED FOR FIRE PUMP IS
 8HRS AT 100%, AND 5% FOR EXPANSION AND 5% FOR SUMP.
 PLEASE SEE TANK AS SHOWN AND FUEL CALCULATIONS CAN NOT
 VERIFIED AS NO INFORMATION WAS SUBMITTED.
 ** PLEASE SEE THE RESPONSE LETTER GIVES SOME
 INFORMATION HOWEVER ALSO STATES 30GALLONS PER MINUTE
 FOR USE.
 PLEASE KNOW THE CALCULATIONS FOR CONSUMPTION NEEDS TO
 BE SHOWN ON PLANS.
 PLEASE SEE COMMENTS BELOW AS THE SIZE OF THE FIRE PUMP
 DOES NOT COORDINATE ON PLANS. PLEASE ALSO BE AWARE THAT
 THE INFORMATION ON MANUFACTURES SPECS/CUT SHEETS HAS
 NOT BEEN SUBMITTED TO CONFIRM OR COORDINATE WITH
 PLANS.
  
 9) NOTE: THIS REMAINS: PLEASE SEE NFPA-20 CHAPTER 6 AND
 7 FOR FIRE PUMP, ASTHERE ARE TOO MANY SECTIONS TO BE
 LISTED FOR ITEMS NEEDED FOR REVIEW.
 PLEASE SEE THAT BESIDES THE MISSING MANUFACTURES
 SPECS/CUT SHEETS, PLEASE SEE THE RISER SHEETS SHOWS TWO
 DIFFERENT SIZES OF FIRE PUMPS, TWO DIFFERENT SIZES OF
 OVER CURRENT PROTECTION OF MAINS ETC.
 VERIFICATION OF SEVERAL ITEMS CAN NOT BE DONE AT THIS
 TIME. (CONDUCTORS, OVER CURRENT PROTECTION, CORRECT
 GROUNDING (SEE COMMENT BELOW) CONDUIT SIZES, ISOLATION
 SWITCHES ETC.
 ** IMPORTANT, SEE COMMENT WITH RESPECT TO THE GENERATOR
 BEING NOTED AS BEING A *SEPARATELY DERIVED SYSTEM*
 WHICH WOULD REQUIRE THE FIRE PUMP CONTROLLER ATS TO BE
 FOUR POLE.
  
 10) NOTE: AS STATED ON THE PREVIOUS REVIEW:PLEASE SEE
 NFPA-110 CHAPTER 7,7.2.3 FOR MIN ELEVATION REQUIRED
 FOR ALL EPSS EQUIPMENT INCLUDING GEN.
 PLEASE PROVIDE MIN LEVELS FOR "SLOSH" ( SEA, LAKE,
 OVERLAND , SURGES, BY HURRICANES) CHARTS BASED ON A CAT
 4 STORM OR THE 100YR ELEVATION ON PLANS.
 THE RESPONSE MENTIONS, BUILDING LOCATED ABOVE FLOOD
 LEVEL. PLEASE KNOW HOWEVER THE MINIMUM LEVEL FOR EPSS
 EQUIPMENT BASED ON THE CHARTS NOTED ABOVE NEEDS TO BE
 STATED AND SHOWN ON PLANS. PLEASE SEE NO ELEVATIONS ON
 ELECTRICAL PLANS FOR LIFE SAFETY EQUIPMENT IS BEING
 SHOWN. (FIRE PUMP ON MEZZANINE LEVEL IS NOT NEEDED) AS
 THIS IS A GIVEN DUE TO ITS LOCATION.
  
 11) NOTE: PLEASE SEE THE GROUNDING ELECTRODE SHOWN FOR
 THE FIRE PUMP SERVICE IS TOO SMALL BASED ON 250.66.
 PLEASE ADJUST. (SHOWN AS #4 ON E-7)
  
 12) NOTE: PLEASE SEE THE SIZE OF THE FIRE PUMP
 CONTROLLER ON E-7 SHOWN AS 800AMPS AND 500AMPS? PLEASE
 CORRELATE WITH THE UPDATED SIZE OF THE NEW FIRE PUMP.
 FBC 104.1.2 FOR COORDINATION.
  
 13) NOTE: PLEASE SEE THE NOTE BELOW THE GENERATOR
 CLEARLY STATES THE GENERATOR WILL BE A SEPARATELY
 DERIVED SYSTEM, YET IF THIS IS THE CASE, THE OTHER NOT
 ON THE GROUNDING ELECTRODE AT GENERATOR STATES ONLY
 GROUND TO CASE WHICH DOES NOT CONFIRM OR CORRELATE WITH
 THE SEPARATELY DERIVED NOTE.
 PLEASE ALSO KNOW IF INDEED THIS IS A SDS, PLEASE ADJUST
 RISER AS ALL ATS EQUIPMENT WILL NEED TO BE FOUR POLES.
 250.20,250.30 ETC
  
 14) NOTE: AS REQUESTED ON PREVIOUS REVIEW: THIS COMMENT
 WILL REMAIN AS THE INFORMATION WHICH WILL BE SUBMITTED
 ON GENERATOR WILL CONFIRM AVAILABLE FAULT CURRENT ON
 THE GENERATOR. THE LEVELS ON THE MANUFACTURE SPECS/CUT
 SHEETS WILL ALSO BE REVIEWED.
 PLEASE PROVIDE ALL AIC RATINGS FOR ALL EQUIPMENT, ATS,
 DISCONNECTS ETC. PLEASE SEE 701.6, NFPA-20 6-3.2.2.4,
 110.9, 240.12 ETC. PLEASE SEE NFPA-110 6.5.2 ETC.
 PLEASE BE SURE ALL EQUIPMENT/MANUFACTURE SPECS/CUT
 SHEETS SHOWS THIS COORDINATION.
  
 15) NOTE: THIS NOTE REMAINS FROM PREVIOUS REVIEW NOTE
 #18.
 PLEASE SEE MISSING A DISCONNECTING MEANS REQUIRED FOR
 THE FEEDERS COMING FROM THE GENERATOR TO MEET
 701.11(B)5.
 ** PLEASE SEE THAT THE RESPONSE MENTIONS THE GENERATOR
 MEETS THE EXCEPTION, HOWEVER KNOWN TO THIS OFFICE IS
 THE REQUIREMENTS FROM ZONING WHICH WILL NEED A
 WALL/SCREENING AROUND THE UNIT ON ALL FOUR SIDES. THIS
 WOULD ALSO LOCK THE BREAKER ON THE INSIDE OF THE UNIT
 WHICH WOULD NOT BE READILY ACCESSIBLE.
 PLEASE SEE THAT BREAKERS SOMETIMES MAY BE USED, HOWEVER
 THEY MAY NOT
  
 19) NOTE: AS REQUESTED FROM PREVIOUS REVIEW: PLEASE
 PROVIDE DETAIL FOR VERTICAL CONDUCTOR SUPPORTS PER
 300.19(A).
 ** RESPONSE LETTER MENTIONS TO SEE DETAIL ON E-7,
 HOWEVER NO DETAIL COULD BE LOCATED ON THIS SHEET AS
 REFERENCED.
  
 20) NOTE:THIS NOTE REMAINS FROM PREVIOUS REVIEW NOTE
 #21.
 PLEASE PROVIDE ALL MINIMUM AUDIBLE AND VISUAL LEVELS
 PER FBC 2001 11-4.28, 11-4.28.2 AND MOST IMPORTANT
 11-4.28.3(4). ALL AREA AS STATED IN 11-4.28.1 SHALL BE
 NOTED AND INCLUDED. THIS COMMENT WAS NEVER UNDER
 ELECTRICAL REVIEW SCOPE ON PREVIOUS REVIEWS UNTIL
 RECENTLY.
 ** RESPONSE LETTER MENTIONS TO SEE REVISED NOTES ON
 FA-5 WHICH WAS LOCATED HOWEVER THE PREVIOUS REVIEW NOTE
 REQUESTED ALL MINIMUM LEVELS TO BE STATED ON LEGEND FOR
 THE REQUIRED DEVICES. PLEASE SEE THE DEVICES STILL DO
 NOT INDICATE THE LEVELS.
 PLEASE KNOW THAT QUOTING THE CODE SECTIONS IN LIEU OF
 THE REQUIRED DETAIL FOR CONSTRUCTION AND DESIGN IS NOT
 ACCEPTABLE AND MUST SHOW DESIGN DETAIL.
  
 21) NOTE:AS REQUESTED ON PREVIOUS REVIEW NOTE #22.
 PLEASE INCLUDE A NOTE ON ROOF TOP PLANS WHICH WILL
 STATE THAT "ANY LIGHTNING PROTECTION SYSTEM TO BE
 INSTALLED SHALL MEET NFPA-780" OR WORDS TO THAT AFFECT.
 A SYSTEM IS NOT REQUIRED, HOWEVER THE NOTE IS, AS THERE
 ARE MANY SYSTEMS BEING "PROMOTED AND SOLD" IN THE STATE
 OF FLORIDA WHICH ARE STRICTLY NOT PERMITTEDAND MANY
 KNOWN SYSTEMS ARE ACTUALLY A HEALTH AND LIFE SAFETY
 HAZARD. PLEASE SEE ONLY IF IN NFPA-780.
 ** PLEASE KNOW THERE ARE SEVERAL ITEMS NOT YET SHOWN,
 CLARIFIED OR SUBMITTED. AS STATED ON PREVIOUS REVIEW
 THERE MAY VERY WELL BE NEW COMMENTS ON THE FOLLOWING
 REVIEW ONCE THE COMPLETED PLANS ARE SUBMITTED.
 ** RESPONSE LETTER MENTIONS THIS WAS ADDED TO NOTES ON
 SHEET E-4 HOWEVER THIS WAS NOT LOCATED ON THIS SHEET
 AND NOTE COULD NOT BE FOUND.
 PLEASE COMPLETE.
  
 AS STATED ON THE PREVIOUS REVIEW:
 PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
2007-08-24 07:54:552007-08-24 07:54:55
 REVIEW IN PROGRESS
2007-08-14 13:41:041-SET IN ELEC FOR REVIEW.